Jefferson Lab 12 GeV Upgrade Status of the CLAS12 Project - PowerPoint PPT Presentation

Loading...

PPT – Jefferson Lab 12 GeV Upgrade Status of the CLAS12 Project PowerPoint presentation | free to download - id: 106c1a-MzJkZ



Loading


The Adobe Flash plugin is needed to view this content

Get the plugin now

View by Category
About This Presentation
Title:

Jefferson Lab 12 GeV Upgrade Status of the CLAS12 Project

Description:

Large acceptance spectrometer electron/photon beams. 7 GeV spectrometer, 1.8 GeV spectrometer, ... 9 GeV tagged polarized photons and a 4 hermetic detector. D ... – PowerPoint PPT presentation

Number of Views:59
Avg rating:3.0/5.0
Slides: 31
Provided by: marybeth54
Learn more at: http://www.ge.infn.it
Category:

less

Write a Comment
User Comments (0)
Transcript and Presenter's Notes

Title: Jefferson Lab 12 GeV Upgrade Status of the CLAS12 Project


1
Jefferson Lab 12 GeV Upgrade Status of the
CLAS12 Project
  • Latifa Elouadrhiri
  • Jefferson Lab

2
Outline
  • CLAS12 Project Description and Status
  • Scope
  • Science program Collaboration
  • Cost
  • Schedule
  • Summary

3
Jefferson Lab Today
Hall B
Hall A
Two high-resolution 4 GeV spectrometers
Large acceptance spectrometer electron/photon
beams
Hall C
7 GeV spectrometer, 1.8 GeV spectrometer, large
installation experiments
4
6 GeV CEBAF
12
11
Two 0.6 GV linacs
1.1
Enhanced capabilities in existing Halls
5
Scope of the 12 GeV Upgrade
6
New Capabilities in Halls A, B, C, and a New
Hall D
7
Overview of Upgrade Technical Performance
Requirements
8
CLAS12
CLAS12
Central Detector
Forward Detector
  • Lum gt 1035cm-2s-1
  • GPDs TMDs
  • Nucleon Spin Structure
  • N Form Factors
  • Baryon Spectroscopy
  • Hadron Formation

2m
9
Initial Science Program
CLAS12
Approved experiments correspond to about 5 years
of scheduled beam operation .
10
CLAS12 Institutions
  • Institution Focus Area
  • Arizona State University (US) Beamline,
    Tagging System
  • Argonne National Laboratory (US) Cerenkov
    Counter
  • California State University (US) Cerenkov
    Counters
  • Catholic University of America (US) Software
  • College of William Mary (US) Calorimetry,
    Magnet Mapping
  • Edinburgh University (UK) Software
  • Fairfield University (US) Polarized Target
  • Florida International University, Miami
    (US) Beamline/Moller polarimeter
  • Glasgow University (UK) Central Detector,
    DAQ, Forward Tagger, RICH
  • Grenoble University/IN2P3 (France) Central
    Detector
  • Idaho State University (US) Drift chambers
  • INFN University Bari (Italy) tbd,
    interest in RICH
  • INFN University Catania (Italy) tbd
  • INFN Frascati and Fermi Center
    (Italy) Central Neutron Detector interest
    show in RICH
  • INFN University Ferrara (Italy) (will join in
    2010) tbd, interest in RICH
  • INFN University Genoa (Italy) Central
    Neutron Detector interest in Forward Tagger
  • INFN ISS/Rome 1 (Italy) tbd, interest
    in RICH

11
12 GeV COST SUMMARY
12
12 GeV Upgrade Funding Profile
13
DOE Project Critical Decisions 12 GeV Schedule
  • CD-0 Approve Mission Need (Mar 2004)
  • CD-1 Approve Alternative Selection and Cost Range
    (Feb 2006)
  • Permission to develop a Conceptual Design Report
  • Defines a range of cost, scope, and schedule
    options
  • CD-2 Approve Performance Baseline (Nov 2007)
  • Fixes baseline for scope, cost, and schedule
  • Now develop design to 100
  • Begin monthly Earned Value progress reporting to
    DOE
  • Permission for DOE-NP to request construction
    funds
  • CD-3 Approve Start of Construction
  • DOE Office of Science CD-3 Approval September
    15, 2008
  • CD-4 Approve Start of Operations or Project
    Close-out

14
DOE Generic Project Timeline
FEB 2006
NOV 2007
SEP 2008
MAR 2004
12 GeV Upgrade Approval dates
15
DOE Critical Decision Schedule
CD-4 split in two to ease transition into
operations phase
(A) Actual Approval Date
16
12 GeV Schedule
  • May 11 - Oct 11 6-month down for initial
    installations
  • Nov 11 - May 12 6-month run 6GeV
  • Jun 12 - May 13 1-year down for major
    installation
  • June 13 - Sep 13 Accelerator commissioning

17
12 GeV Schedule
  • Oct 13 Hall A commissioning start
  • Apr 14 Hall D commissioning start
  • Oct 14 Hall B C commissioning start

18
12 GeV Upgrade Phases and Schedule
(based on funding guidance provided by DOE-NP in
June-2007)
  • 2004-2005 Conceptual Design (CDR) - finished
  • 2004-2008 Research and Development (RD)
    finished (but 1 task)
  • 2006 Advanced Conceptual Design (ACD) -
    finished
  • 2006-2009 Project Engineering Design (PED) -
    ongoing
  • 2009-2014 Construction started !!
  • Parasitic machine shutdown May 2011 through Oct.
    2011
  • Accelerator shutdown start mid-May 2012
  • Accelerator commissioning start mid-May 2013
  • 2013-2015 Pre-Ops (beam commissioning)
  • Hall A commissioning start October 2013
  • Hall D commissioning start April 2014
  • Halls B and C commissioning start October 2014

19
12 GeV Major Procurement Effort
Of the 29 Advanced Procurement Plans, 22 major
procurements are being actively worked (65M
Phased). A summary of their status is as
follows 3 Requests for information completed
3 Specifications completed 4 Open
Solicitations (including CLAS12 Solenoid)
8 Bids Received (including CLAS12 TORUS)
1 Vendor Selected (Hall D Civil Construction
Manager) 3 Awarded (Hall D B-Cal Fiber, CHL
Civil, Hall D Civil) 22 Active Major Procurements
20
Future Upgrades to CLAS12 Base Equipment
  • Micromegas (Saclay)
  • Detailed simulation and track reconstruction
  • Prototypes being tested, engineering design
    underway
  • Review will take place in May 2009
  • RICH Detector (INFN, Argonne, UK )
  • Conceptual design with detailed simulations
  • PAC 34 approved 3 major experiments requiring
    RICH
  • Neutron detector (IN2P3/INFN)
  • Detailed simulations, components being studied
  • PAC 34 gave high rating to the science presented
    in LOI
  • HD-ice Polarized target (JLab/INFN)
  • Laboratory facility being designed
  • Quasi real photon tagging facility (INFN, UK)
  • Feasibility study

21
2007 NSAC Long Range Plan (4 recommendations)
Recommendation 1
  • We recommend the completion of the 12 GeV Upgrade
    at Jefferson Lab.
  • - It will enable three-dimensional imaging of
    the nucleon, revealing hidden aspects of its
    internal dynamics.
  • It will complete our understanding of the
    transition between the hadronic and quark/gluon
    descriptions of nuclei.
  • It will test definitively the existence of exotic
    hadrons, long-predicted by QCD as arising from
    quark confinement.
  • It will provide low-energy probes of physics
    beyond the Standard Model complementing
    anticipated measurements at the highest
    accessible energy scales.

22
Message from JLab Director to CLAS12 Workshop
  • I had hoped to be with you for at least part of
    the workshop unfortunately it became necessary
    for me to attend a conflicting meeting in
    Washington, DC, so although I believe my name
    appears in the participant list, I can claim only
    a virtual presence.
  • …. you can be assured that we are working hard
    to provide the resources both for the 12 GeV
    Upgrade project and for the running of the 6 GeV
    program. We were very pleased that recently we
    received 19 proposals for experiments in the 12
    GeV era including some which seek to extend the
    scope of the currently planned equipment.
  • ….. it is very important that we ensure the
    resources to provide the base capabilities, but
    it is also important to develop initiatives and
    momentum which will ensure an expanding program
    as we start to operate the machine in the new
    era.
  • Please convey my best wishes to all, and,
    especially to the collaboration, my hopes for a
    successful workshop.
  • Hugh Montgomery

23
Summary
  • The 12 GeV Upgrade is the NSAC 1 Recommendation
  • The 12 GeV Upgrade is the highest priority at
    Jefferson Lab
  • The project is in construction phase
  • CLAS12 construction started with the first major
    procurements in progress the superconducting
    magnets, the forward tracking detectors, and the
    pre-shower calorimeter.

This is a very exciting time for hadronic
physics, and the perfect time for new
collaborators to make significant contributions
to the physics and equipment of CLAS12
24
12 GeV Upgrade Summary
  • RD is essentially complete
  • PED (Engineering Design) finishes this year (18
    remaining)
  • Construction has started !
  • Significant progress
  • Procurement planning and awards
  • MOU development
  • Installation planning
  • Space planning
  • Last 6 months very exciting!
  • Next 6 months lots of hard work ahead
  • Continued strong User participation is critical
    to success

25
CLAS12 Central Detector
  • Charged particle tracking in 5T field
  • ?T lt 60psec in CTOF for particle id
  • Vertex reconstruction
  • Moller shield
  • Polarized target operation ?B/B lt 10-4
  • in 3x5 cm cylinder around center
  • Extension may include
  • Central Tracking w/ Micromegas
  • Neutron Detector
  • Bonus detector

26
Hall B Upgrade Schedule
27
Hall B 12 GeV Upgrade Cost
DOE Conveened review of Cost and Schedule
External Independent Project Review September
2007
28
Cost Profile
29
Hall B 12 GeV Upgrade WBS Structure
1.4.2 Hall B
1.4.2.2 Detectors
1.4.2.1 SC Magnet
1.4.2.1.1 Torus
1.4.2.2.1 Tracking
1.4.2.2.2 Calorimeter
1.4.2.2.3 Time of Flight
1.4.2.2.4 Cherenkov
1.4.2.1.2 Solenoid
1.4.2.2.2.3 PCAL
1.4.2.2.1.1 SVT
1.4.2.2.3.1 CTOF
1.4.2.2.4.1 HTCC
1.4.2.2.4.2 LTCC
1.4.2.2.3.2 FTOF
1.4.2.2.1.3 DC
1.4.2.6 Infrastructure
1.4.2.5 Beamline
1.4.2.3 Computing
1.4.2.4 Electronics
1.4.2.5.1 Faraday Cup
1.4.2.3.2 DAQ
1.4.2.3.1 Trigger
1.4.2.4.2 TDC
1.4.2.4.1 ADC
1.4.2.5.2 Moller Polarimeter
1.4.2.6.1 Utilities
1.4.2.6.2 Frames
1.4.2.3.3 Online
1.4.2.4.3 Scalers
1.4.2.3.4 Offline
1.4.2.4.4 High Voltage
1.4.2.6.3 Assembly
1.4.2.6.4 Installation
1.4.2.5.4 Components
1.4.2.3.5 Slow Controls
1.4.2.4.7 Crates, Racks
30
Hall B Upgrade Project Organization