About This Presentation
Title:

Status Of Bomb Renovation Processes

Description:

Automated Wire Arc Spray Systems (85/15 Zinc/Aluminum) For General-Purpose Bomb Renovation ... Typhoon Has Destroyed Gantry System. Future Status In Doubt ... – PowerPoint PPT presentation

Number of Views:96
Avg rating:3.0/5.0
Slides: 13
Provided by: lcl88
Category:

less

Write a Comment
User Comments (0)
Transcript and Presenter's Notes

Title: Status Of Bomb Renovation Processes


1
Status Of Bomb Renovation Processes
  • David L. Butler NCI
  • David F. Ellicks AFCPCO

2
Status of Bomb Renovation Processes
  • Automated Wire Arc Spray Systems (85/15
    Zinc/Aluminum) For General-Purpose Bomb
    Renovation
  • 30 Year Corrosion Protection
  • Kadena AB, Okinawa (1996)
  • Andersen AFB, Guam (2000)
  • Blue Grass Army Depot, Kentucky (2002)


3
AFCPCO Takes Lead in Coating General Purpose
Bombs For the USAF
  • AFCPCO Introduced the USAF To Metalizing
  • General Purpose Bombs
  • Accepted By Both The USAF and U.S. Navy
  • New Production Being Metalized At McAlester
  • Army Depot Oklahoma
  • Renovations Being Done At Kadena AB Okinawa,
    Bluegrass Army Depot Kentucky

4
Survey Finds Problems
  • Corrosion Survey Conducted Spring 01
  • Found Kadena Plant and Andersen Plant Not
    working.
  • Formed Team To Survey Problems and Propose Fixs
  • Team Briefs Hq. USAF/ILM Hq. PACAF/LG, and AFCPCO
  • AFCPCO Directs Repair Of Kadena Plant

5
Kadena AB Okinawa Bomb Renovation
6
BEFORE AND AFTER
7
Kadena AB, Okinawa
  • Plant Is Up And Running
  • Recent Upgrades/Repairs
  • Repaired Shot Gates
  • Rebuilt Blast Wheels
  • Upgraded Wire Arc-Spray Controls
  • Provided Diagnostic Equipment
  • Repaired Blast Machine Doors
  • Trained Personnel On Diagnostic Equipment
  • Processing Approx. 60 Bombs Per Day

8
Bomb Renovation Andersen AFB Guam
9
Andersen AFB, Guam
  • Plant Is Not Operational
  • Personnel Not Trained To Maintain
  • Computer Control System Not Working
  • Blast Machine Not Working
  • Typhoon Has Destroyed Gantry System
  • Future Status In Doubt


10
Bluegrass Army Depot Kentucky
11
Bluegrass Army Depot (BGAD)
  • BGAD Approached AFCPCO Wanting Capability
  • Initial Contract To Do 6000 AF MK-82s
  • Processing Approx. 60 Bombs Per Day
  • Looking To Upgrade Reno Plant And Expand
    Workload
  • Process Specification Developed And Is Being
    Used By BGAD Personnel

12
Conclusion
  • Metallizing Process Works And Is Providing
    Outstanding Corrosion Protection To Bombs
    Processed At Kadena and Bluegrass
  • Andersen Is Out Of Commission But Can Be
    Restored To Operational Status
  • Repair
  • Reconfiguration/Simplification