channel routing seems more adequate than maze routing ... one layer for horizontal connections (trunks) one layer for vertical connections (doglegs) ...
passage through shielding (approx. 5 m long drift) at 65m to 70m ... dogleg with mediocre chromatic properties (assuming an almost mono-energetic beam from the gun) ...
Ground fault in A1 isolated to A14 spool piece. Dipole A15-3 replaced due to bad voltage tap ... MP01 septum raised 1 inch to allow 1 dogleg to be turned down/off ...
MMS (run-time for energy) LEM. DogLeg Calculator. MultiHarp Emittance. RF ... The 362 MeV optics (one linac AT extraction) rendered FFB system less effective. ...
Booster Update. In light of the 'dogleg problem', recent activities have focus on ... Breaking News. ORBUMP water hoses broke again today. Down for the day. ...
Beginning and End of each warm Section. Dark Current. Close as ... 2 Toroid. 1 Dark Current. Dogleg U-Booster. 6 BPM. 1 OTR/WS. 1 Toroid. 1 Dark Current ...
7. Top Level System Description. Golf Compass consists of a special golf ball and a tracking unit. ... such as hitting straight for the green on a par 5 dogleg. ...
Long 3 and Bex2 are near where the dogleg work will be done. Long 6 and Long 7 are where the collimators ... Shutting MiniBooNE off a week early? Long 3 work: ...
The Run II Era The proton source is very close the the specifications in the Run II Handbook. Although it s the highest priority, support of collider ...
Layout of CLEX-A (A=Accelerator housing) floor space. Space reservations. CALIFES 23.2 m from cathode manipulator arm to exit flange of spectrometer ...
Casing cemented up from EOC. 14o/100 ft. Pf = 0.62 psi/ft. 5 1/2' ATM. 34 ... Production casing cemented up from EOC through a stage collar. Cadomin gas well - Alberta ...
Equation 8.51 derived by Lubinski is used to construct Figure 8.32, a nomograph for determining ... qM = 20o. 36. Fig. 8.36: Solution for Example 8.10. Where to ...
... if the intervals Ii and Ij corresponding to nets ni and nj, intersect a column. ... connect a top terminal and the net nj is connected to a bottom terminal at the ...
Title: LEDS: Providing Location-Aware End-to-End Data Security in Wireless Sensor Networks Author: S. A. AHSAN RAJON Last modified by: S. A. AHSAN RAJON
PETE 411 Well Drilling Lesson 33 Directional Drilling Directional Drilling When is it used? Type I Wells Type II Wells Type III Wells Directional Well Planning ...
RBS signal clearly visible above noise floor can measure attenuation length of ... nm laser allows clear separation of the Fresnel peaks from the MT-12 at PPB1 and ...
Effect of the sextupole field component of the MR bending magnets and the ... June 9, 2006. Footprint for 1.8 kW/bunch, Bf=0.2 ... April, 2006 (Niki san data) ...
All current activity revolves ... Main design challenge is reduction of heat load through: ... Increasing Din Spot size increases which lowers power density ...
DUTIES AND RESPONSIBILITIES ASSOCIATED WITH A FIRING OPERATION 4320.17 SL # SL 2-1-* Discuss how these relate to a firing operation. Can you think of any other ...
Proton Source Meeting August 22, 2003. Linac pre-chopping at the ion source D. Moehs ... Pre-shutdown studies (open) Proton Source Meeting, August 8, 2003 ...
Power Supplies, Cooling water. Power supplies for the magnet coils: input current between ... water pressure 6 bar; pressure drop 4 bar. 23.10.2006. Bernward ...
Base Course / Speed (B CORPEN / SPEED) course and speed the guide should be on. er vector ... normally faster than base speed. Stationing Rules. When changing station: ...
Overview of final* concept Bunch compressor 45 deg. spectro cavity gun 3.9 GHz 3 ILC cryomodules 18 4 57 ~10 61 user area injector transport line main linac
Recommendations From the Proton Plan Director s Review Strengthen accelerator physics efforts to guide the implementation and commissioning of the correction systems.
The people doing the radiation survey got about 20 mR. Two technicians received 30 mR doing a minor HV cable repair. We're at (or past? ... No magic solution found. ...
Latch between liner hanger, liner and inner string (drill pipe) Inner string (Drill pipe) ... string and BHA from liner and liner hanger. Trip out with BHA ...
bunkers left, right. and at the rear. The green is flat, so. you should have no ... one bunker in front. of it to the right. And after you've sunk the 9th ...
New Setup: New Long 3 septum allows it to be in middle of straight ... In the mean time, we will raise L13 (dump) septum slightly - Overall factor of two reduction. ...
Existing proton source must last at least another 10 years or ... Horizontal slewing due to underpowered injection bump magnets (ORBUMP). RF Power limitations: ...
Drilling Engineering Directional Drilling Slide * Slide * Tool Face Angle * Slide * The Average Angle Method Z E (x) N (y) C D z N D C y x Slide * The Average Angle ...
TL' Layout of CLEX-G (G=Galery) floor space. LIL Galery. CTF2 Galery. plant room. 3.9m ... Tue to difference in construction technique CLEX floor is ...
(NUMI only) Minimum Main Injector ramp cycle time (NUMI only): 1.4s loading time (at least ... a design for a new booster RF system. Larger aperture, higher gradient ...