Download Presentation File

File to download:

    PROJ 586 RANK Introduction Education--proj586rank.com PowerPoint PPT Presentation

Title: PROJ 586 RANK Introduction Education--proj586rank.com - PowerPoint PPT Presentation

Description: FOR MORE CLASSES VISIT www.proj586rank.com PROJ 586 Final Exam Set 1 1. (TCO A) In the _____ organization structure, the project manager is responsible for the project results, whereas the functional manager is responsible for providing the resources needed to achieve the results. 2. (TCO H) What is the longest phase of the project life cycle? 3. (TCO B) The lowest level item of any one branch of the WBS is called a(n) _____. – PowerPoint PPT presentation

Download instruction:

When the PPT version of this presentation was uploaded to PowerShow.com, it was checked for
viruses. That said, we cannot guarantee that the PPT file is safe for you to download. But if you
whish to download it, just check that you are not a robot and then click the download button.