Rehabilitation and Extension of the Water Supply and Sewerage Systems for Bistrita Catchment Area - PowerPoint PPT Presentation

1 / 15
About This Presentation
Title:

Rehabilitation and Extension of the Water Supply and Sewerage Systems for Bistrita Catchment Area

Description:

... the Bacau sewerage system - applying to the damaged sections of the trunk mains ... HIGH INVESTMENT COSTS FOR NEW TRUNK MAIN - 60 milion Euro ... – PowerPoint PPT presentation

Number of Views:194
Avg rating:3.0/5.0
Slides: 16
Provided by: pellfrisch
Category:

less

Transcript and Presenter's Notes

Title: Rehabilitation and Extension of the Water Supply and Sewerage Systems for Bistrita Catchment Area


1

-1-Name of the Project
Rehabilitation of the Sewerage Network and
Wastewater Treatment Plant in Bacau
2
State of Application Documents
  • Feasibility Study - Made by MIPLAN - Belgium in
    2001
  • Application - ready now January 2002
  • Financial Gap Analisys - ready now January 2002
  • Institutional Analisys - ready now January 2002
  • Economical Analisys - ready since December 2001
  • Romanian formal EIA - 80 ready - to be
    delivered in February 2002 to the Ministry of
    Waters and Environmental Protection with the
    necessary authorised stamp
  • Drawings and Annexes - to be delivered in
    February 2002

3
-1- Localisation of the Project
BACAU
4
- 2 - PRESENT SITUATION
  • Sewerage
  • Several sections of large main collectors are in
    bad shape, collapsed and leaking
  • Groundwater is lower than the sewers so
    exfiltration leads to groundwater pollution and
    high contamination risks
  • Some areas are frequently flooded due to
    insufficient sewer capacity
  • One of the neighbourhoods across the river uses
    a wastewater pumping station that needs urgent
    rehabilitation.
  • No investment in sewerage in MUDP2.

5
- 2 - PRESENT SITUATION
  • Waste Water Treatment Plant
  • The plant can treat only 50 of the incoming
    flow the rest is send directly to the
    Bistrita River
  • Siret River
  • The treatment efficiency is less than 36
  • The inlet works are not functioning properly -
    40 efficiency
  • The biological treatment is way below EU and
    national standards - 25 efficiency
  • The sludge management is not proper.

6
- 2 - EU DIRECTIVES
  • The measure is intended to cover for 240,000 PE
    for compliance with EU Directives
  • surface water quality 75/440/EEC
  • urban waste water 91/271/EEC
  • hazardous waste 91/689/EEC
  • civilised sewerage for 180,000 inhabitants

7
- 3 - PROJECT DESCRIPTION
  • rehabilitation of the Bacau sewerage system -
    applying to the damaged sections of the trunk
    mains
  • rehabilitation of a wastewater pumping station
  • rehabilitation of the Waste Water Treatment Plant
    to fully treat the incoming flow at required
    parameters
  • introduction of a proper sludge management

8
City of Bacau
Bistrita River
Main Collectors
Pumping station
WWTP
Siret River
9
- 4 - PROJECT OBJECTIVES
  • Stop polluting the Bistrita and Siret Rivers and
    offer a good quality surface water quality to
    1,400,000 inhabitants downstream
  • Stop polluting the groundwater in Bacau and
    surrounding areas - benefit for 200,000
    inhabitants in the city
  • Eliminate the sludge management bottleneck
  • Make the city compliant with EU Directives (at
    least on the sewerage and treatment side)

10
- 6 - Bodies Responsible
Body responsible for the Application The City of
Bacau Municipal Council Body responsible for
the implementation RAGC Bacau
11
- 7 - Population Served
  • For the sewer rehabilitation
  • direct - 180,000 inhabitants connected to the
    main sewers to be rehabilitated
  • indirect - 220,000 inhabitants of the city by
    decontamination of groundwater
  • For the WWTP
  • will serve in the future at least 240,000
    inhabitants industry

12
- 9 - Financing the Bacau Project
TOTAL COSTS 17, 748, 000 EURO ISPA
12,778,000 EURO Structural
Loan 4,900,000 EURO
13
- 10 - TARIFF Policy
Water tariff 0.171 EURO/cu.m. Sewerage
tariff 0.065 EURO/cu.m. A 10-15 increase
in both tariffs is necessary to pay for the
proposed investment
14
- 12 - Implementation
15
- 16 - Specific Problems
  • NOT ENOUGH WATER for 24 Hour Distribution
  • POOR QUALITY WATER
  • HIGH INVESTMENT COSTS FOR NEW TRUNK MAIN - 60
    milion Euro
  • Bacau will expand in 2003 to 300,000 inhabitans
Write a Comment
User Comments (0)
About PowerShow.com