Title: KCM


1
KCMProterra
  • WSTA Vehicle Maintenance
  • Meeting
  • October 7, 2014

2
Electric Bus Project
  • Project Goals
  • Could a battery bus replace the 40 diesel
  • Little or no impact on current service
  • R D project

3
Electric Bus Project
  • Design Expectations
  • Heavy-duty transit bus
  • Not connected to an external power supply
  • Minimal or no interruption to regular 40 service
  • Minimal or no interruption to regular base
    maintenance operation

4
Criteria
  • Operations
  • Typical layover time 10 15 min
  • Distance per trip 25 30 miles
  • Charging can not interrupt service
  • Minimal driver interaction to recharge

5
(No Transcript)
6
Routes 226 241
  • These two routes are interlined and operate in a
    circular pattern between Eastgate PR and the
    Bellevue Transit Center.
  • 18.25 mile loop
  • Layover at Eastgate PR

7
Route 221 248
  • Route 221 operates between Eastgate PR and
    Redmond Transit Center.
  • 18.9 miles one way
  • Layover at Eastgate PR
  • Layover at Redmond Transit Center
  • Route 248 could operate out of Redmond Transit
    Center
  • Layover timing with other routes

8
Criteria
  • Vehicle Maintenance
  • Twelve year bus
  • No fossil fuels APU, auxiliary heater etc.
  • Operate all hotel loads
  • Little impact to vehicle servicing
  • Base infrastructure requirements

9
Two Battery Philosophies
  • Long Range Slow Charge
  • Pros Cons
  • Operation
  • Maintenance
  • Short Range Fast Charge
  • Pros Cons
  • Operation
  • Maintenance

10
Other Section Impacts
  • Design Construction
  • On street charging
  • Base charging
  • Scheduling
  • Change layover locations
  • Service Development/Planning
  • Other groups?

11
Proposers
  • BYD Long range, slow charge
  • New Flyer Long range, slow charge
  • Proterra Short range, fast charge
  • All others dropped out
  • Design Line, E-Bus, Nova, Skoda

12
Selection
  • Experience operating battery buses
  • Base infrastructure
  • Impact operating 25 to 100 buses/base/Rts
  • Impact operating 100 to 250 buses/base/Rts

13
Base Charging
  • Long Range Slow Charge
  • Pro Mileage
  • Con Slow charge, 50 KW to 300 KW
  • Bus fleet of 100 would need 5 MW to 30 MW
  • Impact to service development
  • Short Range Fast Charge
  • Pros Fast charging, minor base impact
  • Cons Limited range, charge station no.
  • Impact to service development

14
(No Transcript)
15
(No Transcript)
16
(No Transcript)
17
(No Transcript)
18
TPI Builds the Body
  • Providence, Road Island
  • Start with a plug (mold)
  • Kits are laid out
  • Different sheets of fiberglass, carbon fiber,
    Kevlar balsa wood
  • Vacuum sealed and resin is drawn into the
    fiberglass structure.

19
Body Structure
20
Composite Body Strength
21
Axle Mounts
22
Axle Mounts
23
ProDrive/Air System
24
Pro-drive
25
ProDrive/Air System
26
(No Transcript)
27
KCM Battery Bus