PNOC plans to undertake 7 hydropower projects - PowerPoint PPT Presentation

About This Presentation
Title:

PNOC plans to undertake 7 hydropower projects

Description:

PNOC plans to undertake 7 hydropower projects Sites being evaluated are: Potential Timbahan, Madalag, Aklan 23 MW Catuiran, Calapan, Or. Mindoro 18 MW Sicopong ... – PowerPoint PPT presentation

Number of Views:96
Avg rating:3.0/5.0
Slides: 17
Provided by: Laurr150
Category:

less

Transcript and Presenter's Notes

Title: PNOC plans to undertake 7 hydropower projects


1
(No Transcript)
2
(No Transcript)
3
Proposed Services of the MSC (Interim and Spin-off) Name of Companies interested in the Service Number of Companies of Sample
1.0 Project Development Services Permits, Licenses and Approvals Processing b. Packaging of proposal for loan application c. Fund Syndication PADISCOR Smith Bell RESCO CMC Ventures Condor Hydro Marketing Edward Marcs Phils. Inc. Enertech Systems Ind. Jover Light Industries Maschinen Tecknik nc. PADISCOR FPEC Smith Bell RESCO PADISCOR FPEC Smith Bell RESCO 2 9 3 14 64 21
2.0 Advisory Services on Business Systems and Process Improvement Edward Marcs Phil. Inc. Enertech Systems Ind. Jover Light industries Maschinen Technik Inc. Solar Electric Co. 5 36
3.0 Promotion and Marketing of RE Products CMC Ventures Condor Hydro Marketing Jover Light industries Maschinen Technik Inc. Miledel Enterprises Solar Electric Co. 6 43
4
PNOC plans to undertake 7 hydropower projects
  • Sites being evaluated are Potential
  • Timbahan, Madalag, Aklan 23 MW
  • Catuiran, Calapan, Or. Mindoro 18 MW
  • Sicopong, Negros Oriental 17.8 MW
  • Villasiga, Antique 25 MW
  • Langogan, Palawan 5.6 MW
  • Babuyan, Palawan 6.8 MW
  • Pasil, Kalinga, Mt. Province 22 MW

5
PNOC plans to undertake 7
hydropower projects (contd.)
  • Catuiran Site
  • Undergoing financial and economic evaluation.
    PNOC is also exploring the possibility of getting
    a private sector partner for the development of
    the site
  • Langogan and Babuyan Sites
  • Recently secured preliminary grant financing
    approval from Spanish Ministry of Industry and
    Trade for the conduct of the project feasibility
    study.

6
PNOC plans to undertake 7
hydropower projects (contd.)
  • Pasil Site
  • State firm is also working on getting a grant
    financing from the Japan External Trade
    Organization for a project feasibility study.
  • Sicopong Site
  • Feasibility study has already been completed.
  • Villasiga Site
  • Project feasibility study is currently being
    conducted.

7
PNOC plans to undertake 7
hydropower projects (contd.)
  • Timbahan Site
  • Certain issues still had to be ironed between DOE
    and DENR Committee on Energy Project under Nipas
    Areas

8
17 Wind Sites for Development
  • Luzon Potential Sites
  • Bani and Bolinao, Pangasinan w/ Potentials of
    40MW each
  • Tagaytay, Cavite with 30MW
  • Donsol-Jovellar, Sorsogon with 70MW
  • Donsol and Pilar, Sorsogon with 40MW
  • Matnog, Sorsogon with 10MW

9
17 Wind Sites for Development
  • Visayas Potential Sites
  • Dumangas, Iloilo with a potential of 50 MW
  • Siquijor with 10MW
  • Carmen and Oslod, Cebu with 20MW and 30MW
    respectively
  • Allen-Lavezares in Northern, Samar with 10MW
  • Tomas Opus, Southern Leyte with 10MW

10
17 Wind Sites for Development
  • Mindanao Potential Sites
  • Gigaquit in Surigao del Sur with a potential of
    30MW the lone wind site in Mindanao to be
    offered to investors.

According to DOE data, the countrys total wind
potential is placed at around 70,000 MW.
11
LIST OF PROJECTS GROUP 1 FOR PRE-FEASIBILITY STUDY, PRE-FEASIBILITY STUDY AND FOR FEASIBILITY STUDY LIST OF PROJECTS GROUP 1 FOR PRE-FEASIBILITY STUDY, PRE-FEASIBILITY STUDY AND FOR FEASIBILITY STUDY LIST OF PROJECTS GROUP 1 FOR PRE-FEASIBILITY STUDY, PRE-FEASIBILITY STUDY AND FOR FEASIBILITY STUDY LIST OF PROJECTS GROUP 1 FOR PRE-FEASIBILITY STUDY, PRE-FEASIBILITY STUDY AND FOR FEASIBILITY STUDY LIST OF PROJECTS GROUP 1 FOR PRE-FEASIBILITY STUDY, PRE-FEASIBILITY STUDY AND FOR FEASIBILITY STUDY
Project Title Project Title Implementing Agency Status Remarks
1. Rural Revitalization Project for the Conservation of Ifugao Rice Terraces LGU Ifugao For FS looking for partners
2. Solar Infrastructure Project (Austrian) DOE Pre FS SHS to be used for brgy elect
3. 5 to 10 MW Wind Power Project on Bayog, Ilocos Norte PNOC-EDC For FS KFW funding (loan)
4. 5 to 10 MW Wind Power Project in Manuk-manuk, Aklan PNOC-EDC For FS KFW funding (loan)
5. 10 to 20 MW Nubenta, Surigao Sur PNOC-EDC For FS KFW Funding (loan)
6. 40 MW Wind Power Project in Pagudpud, llocos Norte PNOC-EDC For FS Spanish protocol
7. 5 MW Wind in Camiguin PNOC-EDC For FS Spanish protocol
8. 5MW in Siargao PNOC-EDC For FS Spanish protocol
9. 5 MW Dinagat PNOC-EDC For FS Spanish protocol
10. Palawan Wind Energy Project PNOC-EDC For pre FS Spanish protocol
11. 42 MW Wind Energy Project PHESI/Breeze Electric For pre FS looking for partners
12. 50 MW Cauayan Neggros GRIPP For FS looking for investors
13. 120 MW off-shore Wind Eneryg Project PMR Holding Corp. Pre FS looking for partners during implementation
14. 25 Sites Wind project Cammon WindSolar Energy Inc. Pre FS looking for partners and market. For details visit www.cammonwindsolar.com
12
LIST OF PROJECTS GROUP 1 FOR PRE-FEASIBILITY STUDY, PRE-FEASIBILITY STUDY AND FOR FEASIBILITY STUDY LIST OF PROJECTS GROUP 1 FOR PRE-FEASIBILITY STUDY, PRE-FEASIBILITY STUDY AND FOR FEASIBILITY STUDY LIST OF PROJECTS GROUP 1 FOR PRE-FEASIBILITY STUDY, PRE-FEASIBILITY STUDY AND FOR FEASIBILITY STUDY LIST OF PROJECTS GROUP 1 FOR PRE-FEASIBILITY STUDY, PRE-FEASIBILITY STUDY AND FOR FEASIBILITY STUDY LIST OF PROJECTS GROUP 1 FOR PRE-FEASIBILITY STUDY, PRE-FEASIBILITY STUDY AND FOR FEASIBILITY STUDY LIST OF PROJECTS GROUP 1 FOR PRE-FEASIBILITY STUDY, PRE-FEASIBILITY STUDY AND FOR FEASIBILITY STUDY
Project Title Project Title Implementing Agency Implementing Agency Status Remarks
15. Tagkiling, Agusan del Norte Wind Project 40 MW PNOC-EDC PNOC-EDC For pre FS looking for partners
16. 1 MW Puerto galera Demonstration Project PNOC-EDC For FS funding from Indian Govt.
17. Four other sites in Mindoro (Alag, Bongabong, Dulangan, Aglubang) NPC-SPUG For FS Spanish protocol (loan/grant)
18. Dapitan (11 MW), Zamboanga del Norte SB RESCO/ LGU ZN For FS requesting assistance
19. Balatok, Kalinga Micro-Hydro Project PMR For pre FS Initial data gathering
20. 10-20 MW Bagasse project PASS, Iloilo WWF For FS talking with a sugar mill
21. 5 MW Ricehull Project in Panay Island WWF For FS talking with a developer
22. 1 MW Ricehull Project in Munoz City LGU of Munoz For FS looking for funds for FS
23. 20-MW Geothermal Project in Dauin, Southern Negros PNOC-EDC Pre FS resource assessment
24. Low Enthalpy Geothermal Utilziation PNOC-EDC Pre FS
25. 22 MW Minihydro Project in Lake Mainit additional info c/o (Dodit)
13
LIST OF PROJECTS GROUP 1 FOR PRE-FEASIBILITY STUDY, PRE-FEASIBILITY STUDY AND FOR FEASIBILITY STUDY LIST OF PROJECTS GROUP 1 FOR PRE-FEASIBILITY STUDY, PRE-FEASIBILITY STUDY AND FOR FEASIBILITY STUDY LIST OF PROJECTS GROUP 1 FOR PRE-FEASIBILITY STUDY, PRE-FEASIBILITY STUDY AND FOR FEASIBILITY STUDY LIST OF PROJECTS GROUP 1 FOR PRE-FEASIBILITY STUDY, PRE-FEASIBILITY STUDY AND FOR FEASIBILITY STUDY
Project Title Implementing Agency Status Remarks
26. 24 MW Dulongan Hydropower Project PNOC for FS FS shall be revalidated by the consultant to be identified by PNOC.
27. 13.6 MW Aglubang Hydropower Project PNOC for FS FS shall be revalidated by the consultant to be identified by PNOC.
28. 28 MW Bongabong Hydrpower Project PNOC for FS FS shall be revalidated by the consultant to be identified by PNOC.
29. 39.5 MW Alag Hydrpower Project PNOC for FS FS shall be revalidated by the consultant to be identified by PNOC.
30. 5.6 MW Babuyan Hydropower Project PNOC for FS Proposal forwarded to NEDA for endorsement to Spanish Ministry.
31. 6.8 MW Langogan Hydropower Project PNOC for FS Proposal forwarded to NEDA for endorsement to Spanish Ministry.
32. Sicopong, Negros Oriental Hydropower Project PNOC for FS requesting funding from Westject for the conduct of FS.
33. For other projects on biomass, consult EDUFI on its COGEN 3 Program
14
(No Transcript)
15
(No Transcript)
16
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com