Title: Simulation


1
Simulation
  • Prepared by
  • Akhid Yulianto, SE, MSC (Log)
  • Based on Anderson, Sweeney, and Williams

2
Simulation
  • Kebaikan dan kelemahan menggunakan simulation
  • Modeling
  • Random Variables and Pseudo-Random Numbers
  • Time Increments
  • Bahasa Simulation
  • Validation and Pertimbangan Statistik
  • Contoh contoh.

3
Simulation
  • Simulation salah satu hal yang sering digunakan
    sebagai teknik science manajemen.
  • Secara khusus untuk memodelkan proses random yang
    terlalu kompleks dengan model analitis.

4
Advantages of Simulation
  • Kemampuan untuk mendapat gambaran mendalam dari
    solusi model.
  • Sebuah laboratorium experiment yang memudahkan
    dalam analisa "what if" and sensitivity.

5
Disadvantages of Simulation
  • Memerlukan waktu yang banyak dalam pengembangan.
  • Solusi yang didapat bukan nilai optimal.
  • trial and error method

6
Simulation Modeling
  • Membangun pernyataan matematika dari masalah.
  • Model harus realistis tetapi dapat dipecahkan
    dalam batas kecepatan dan kapasitas penyimpanan
    sistem komputer yang digunakan.
  • Nilai input untuk model serta estimasi
    probability untuk variabel random harus
    dinyatakan.

7
Random Variables
  • Nilai random variable menggunakan simulasi Monte
    Carlo.
  • Setiap random variabel adalah satu set angka
    dengan model sehingga jika satu angka random
    dihasilkan maka angka input yang dalam model juga
    akan berubah.

8
Pseudo-Random Numbers
  • Komputer menghasilkan bilangan random dengan
    formula yang sama sehingga bilangan random bukan
    dihasilkan secara real.
  • Tetapi, menggunakan test statistics standard,
    angaka dapat ditampilkan dari process random.
  • These numbers are called pseudo-random numbers.

9
Time Increments
  • Dalam model simulasi waktu tetap, priode waktu
    ditambahkan dengan jumlah tetap. Untuk satu
    periode waktu sebuah set data yang berbeda dari
    urutan input digunakan untuk menghitung efek pada
    model.
  • Dalam model simulasi next event, Periode waktu
    tidak ditetapkan tetapi di turunkan dengan nilai
    data dari urutan input.

10
Simulation Programs
  • The computer program that performs the simulation
    is called a simulator.
  • Flowcharts can be useful in writing such a
    program.
  • While this program can be written in any general
    purpose language (e.g. BASIC, FORTRAN, C, etc.)
    special languages which reduce the amount of code
    which must be written to perform the simulation
    have been developed.
  • Special simulation languages include SIMSCRIPT,
    SPSS, DYNAMO, and SLAM.

11
Model Verification/Validation
  • Verifikasi/validasi baik model atau metode yang
    digunakan pada komputer untuk perhitungan sangat
    penting.
  • Model yang tidak merefleksikan perilaku dunia
    nyata tidak diharapkan menciptakan hasil yang
    bermakna.
  • Sama, kesalahan dalam pemrograman dapat
    menghasilkan hasil yang tidak bermakna.

12
Model Verification/Validation
  • Validasi secara umum dikerjakan oleh ahli review
    model dan ahli kode komputer untuk kesalahan.
  • Secara ideal, simulasi seharusnya berproses
    menggunakan data lampau yang benar benar terjadi.
  • Prediksi dari model simulasi seharusnya di
    bandingkan dengan hasil masa lalu.

13
Experimental Design
  • Desain experimental adalah pertimbangan sangat
    penting dalam proses simulasi.
  • Isu isu seperti panjang waktu dari simulasi dan
    penanganan dari output data dari model harus di
    lakukan dalam pengumpulan dan penganalisaan data
    output.
  • Normally one is interested in results for the
    steady state (long run) operation of the system
    being modeled.
  • The initial data inputs to the simulation
    generally represent a start-up period for the
    process and it may be important that the data
    outputs for this start-up period be neglected for
    predicting this long run behavior.

14
Experimental Design
  • For each policy under consideration by the
    decision maker, the simulation is run by
    considering a long sequence of input data values
    (given by a pseudo-random number generator).
  • Whenever possible, different policies should be
    compared by using the same sequence of input data.

15
Analisa Resiko
  • Melibatkan prediksi outcome sebuah keputusan yang
    menghadapi ketidakpastian
  • Contoh adalah Pengembangan produk baru.
  • Analisa dapat menggunakan simulasi atau tidak
  • Simulasi menghasilkan analisa yang lebih
    komprehensif.

16
Portacomp Project
  • Memproduksi PC dan peralatan yang terkait
  • Mmbangun sebuah prototype untuk printer portable
    model baru kualitas tinggi
  • Membutuhkan analisa pasar
  • Ditemukan data awal (nilai konstan, parameter
    dari model )
  • Selling price 249 perunit
  • Administrative cost 400,000
  • Advertising Cost 600,000
  • Input probabilistics (not known certainly)
  • Direct labor/unit 45 15,000 units for the
    for the first year demand Part cost/unit 90

17
Portacomp Project
  • Situasi kebijakan cash flow yang ketat jadi
    fokus pada kerugian potensial

18
What if Analysis
  • Profit ( 249 Direct labor cost/unit Part
    cost/unit)(Demand) ( 400,000 600,000)
  • Profit ( 249 c1 c2)(x) ( 10,000)
  • Skenario kasus dasar
  • Profit ( 249 45 90)(15000) ( 10,000)
    710,000
  • Data juga memperlihatkan bahwa direct labor cost
    antara 43-47 part cost antara 80-100 Permintaan
    tahun pertama 15000-28500
  • The worst case scenario Profit ( 249 47
    100)(15000) ( 10,000) -847,000
  • The best case Scenario Profit ( 249 43
    80)(28500) ( 10,000) 2,591,000

19
Results of What if Analysis
  • Keuntungan berkisar antara kerugian 847,000 -
    keuntungan 2,591,000 dengan skenario kasus
    dasar bernilai 710,000. jadi tetap ada potensi
    kerugian.
  • Tetapi, probabilitas keuntungan dan kerugian
    tidak tergambar dengan baik.

20
Simulasi
  • Tambahan keterangan adalah melalui data awal
    biaya probabilitasnya dapat diketahui . Yaitu
    melalui penggambaran diagram atau uji distribusi
    (pelajari cara pembuatan histogram)
  • Direct Labor cost 43-47 dengan pola distribusi
    discrete

Direct Labor Cost/unit Probability
43 0.1
44 0.2
45 0.4
46 0.2
47 0.1
21
Simulasi
  • Part cost 80-100 and follows uniform
    probability

100
80
90
22
First Year Demand
  • Mengikuti Normal probability

23
Simulation
  • Parts costs a r(b-a) 80
    r(100-80)
  • Direct Labor cost

Direct Labor cost/unit Probability Interval of Random Number
43 0.1 0.0 but lt0.1
44 0.2 0.1 but lt0.3
45 0.4 0.3 but lt 0.7
46 0.2 0.7 but lt0.9
47 0.1 0.9 but lt 1.0
24
Makna Tabel Excel
  • Angka 1-500 menunjukkan jumlah percobaan
  • Kolom direct Labor cost B20-B519 masing masing
    cell membaca tabel secara vertikal dari direct
    labor cost bagian bilangan random (A10-B14)
    dikaitkan nilai random untuk menetukan cost per
    unit (kolom ke tiga)
  • Kolom part cost per unit C20-C519 menggunakan
    rumus slide no 23 yang memakai bilangan random
  • Kolom Demand (first year demand)
    D20-D519menghasilkan bilangan random ynag
    mengikuti distribusi normal dari mean 15000 dan
    standar deviasi 4500
  • Kolom Profit (E20-E519) Ingat rumus Profit

25
Makna Tabel Excel
  • Mean profit rata rata keuntungan E20-E519
  • Standar deviasi simpangan baku dari E20-E519
  • Minimum Profit Keuntungan minimum dari E20-E519
  • Selanjutnya tinggal anda pahami dengan melihat
    langsung excelnya