Title: IMO Transmission Assessment Criteria


1
IMO Transmission Assessment Criteria
Bonnie Rose IMO
2
Transmission Assessment Criteria
  • Identifies the technical criteria the IMO uses
    for
  • Connection Assessments
  • Assessment of the adequacy of existing and
    planned transmission facilities to meet the
    current and future electricity needs of Ontario

3
Contents
  • Study Guidelines
  • Study Period
  • Base Case
  • Load
  • Power transfer capability
  • Contingency Based Assessment
  • Study Conditions

4
Contingency Based Assessment
  • IMO identifies Bulk Power System
  • IMO assumes no facilities are bulk
  • Apply NPCC contingencies throughout the ICG and
    examine results
  • The bulk power system is that portion of the ICG
    that can have a significant adverse impact
    outside the local area
  • Apply NPCC design criteria contingencies

5
Contingency Based Assessment
  • Local Areas
  • Local areas are those portions of the ICG where
    the consequence of faults or disturbances is well
    understood and restricted to a clearly defined
    set of facilities on the ICG.
  • Apply single element contingencies

6
Contingency Based Assessment
  • The IMO will apply bulk power system design
    criteria contingencies to local areas in cases
    when
  • voltage problems propagate to higher voltage
    levels
  • the net load impacted exceeds 1,000 MW

7
Contents
  • System Conditions
  • Generation Dispatch
  • to stress the system
  • Exports and Imports
  • to stress the system
  • Stability Conditions
  • 10 margin on most critical parameter

8
Contents
  • System Conditions
  • Permissible Control Actions, following a
    contingency, to respect loading, voltage, and
    stability limit requirements
  • Generation redispatch
  • Automatic tripping of generation (G/R)
  • Connectivity changes to change flow
  • Trip or redispatch dispatchable load
  • Switch reactors/capacitors

9
Contents
  • System Conditions
  • SPS
  • G/R post single contingency need for
    reinforcements

10
Contents
  • Pre and Post System Conditions
  • Identifies acceptable pre and post contingency
    response on the ICG

11
Pre and Post Contingency System Conditions
  • Power Transfer Capability
  • Congestion allowed
  • Not allowed to lower power transfer capability
  • Pre-Contingency Voltage Limits
  • Transmission System Code

12
Pre and Post Contingency System Conditions
  • Voltage Change Limits
  • Based on historical planning criteria
  • 10 following contingencies
  • 4 following reactive or capacitive switching
  • Transient Voltage Criteria
  • New
  • Based on CMP and WSCC criteria

13
Pre and Post Contingency System Conditions
  • Steady State Voltage Stability
  • PV curves (10 margin on Power)
  • Damping factor
  • Identify Congestion
  • Line and equipment loading
  • Equipment owners rating
  • Transmission line at 4km/hr, 0/30
  • Short Circuit Levels

14
Contents
  • Transmission Connection
  • New or Modified Facilities
  • Predominantly section 1.6 from MM2.10
  • Effect on Existing Facilities
  • Predominantly section 1.6 from MM2.10

15
Contents
  • Generation Connection
  • Voltage Change
  • Additional criteria - 5 on generator switching
  • Wind Power
  • Start-up
  • Peaking units for transmission assessment
  • Transmission line rating at 15km/hr within 50km
    radius

16
Generation Connection
  • Transmission Facilities
  • Generating station gt500MW requires double circuit
    breaker 1/3 or breaker 1/2 network station
    layout

17
Contents
  • Station Layout
  • Provides guidelines for desirable station layouts
    for switching and transformer stations
  • Acceptability ultimately driven by design
    contingencies and their impact on the ICG

18
Stakeholder Input
  • Whats Next?
  • Stakeholder this document at the Forecasts and
    Assessment Sub Committee