EDON Case Study: Old Transformers Replacement - Groningen saves 1.2 million kWh per year - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

EDON Case Study: Old Transformers Replacement - Groningen saves 1.2 million kWh per year

Description:

EDON Case Study: Old Transformers Replacement - Groningen saves 1.2 million kWh per year Piet Staal EDON About EDON Utility company North-East Netherlands 800,000 ... – PowerPoint PPT presentation

Number of Views:48
Avg rating:3.0/5.0
Slides: 13
Provided by: HansD65
Category:

less

Transcript and Presenter's Notes

Title: EDON Case Study: Old Transformers Replacement - Groningen saves 1.2 million kWh per year


1
EDON Case Study Old Transformers
Replacement - Groningen saves 1.2 million kWh
per year
  • Piet Staal
  • EDON

2
About EDON
  • Utility company
  • North-East Netherlands
  • 800,000 clients

3
North Netherlands
4
Project Groningen 1982
  • SAVING ENERGY by replacing old transformers
  • Old transformers still use warm rolled steel
    lt 1955
  • New ones, standard or special design?

5
City of Groningen
6
Old Transformers
  • Constructed before 1940
  • Constructed between 1948 and 1951
  • Constructed between 1951 and 1955

7
Low voltage network
  • Meshed network
  • Cables in closed loops, double feed
  • Transformers in parallel operation

8
Transformer peak loading
  • Individual between 0,4 and 1,1
  • Mean value 0,65
  • Load adapted by exchange schedules

9
Replacement Programme
10
New design 400 kVA
11
(No Transcript)
12
Groningen Choice
  • Type E lowest total owner cost
  • Type C more energy efficient
  • THE QUESTION IS
  • HOW MUCH MORE INVESTMENT FOR HIGHER EFFICIENCY?