3D Mine Plan
www.deeptec.in info_at_deeptec.in 91 9860280233
2
CREATE 3D CONTOURS FROM THE SURVEY
3
CREATE 3D CONTOURS FROM THE SURVEY
72 MTRS
4
ENTIRE MINE TO BE DIVIDED INTO 10 MTR BENCHES
5
EXISTING ROAD AND CLIFF OF 72 MTRS HEIGHT
72 MTRS
6
CROSS SECTIONS OF ROAD DESIGNED WITH 116
MOTORABLE SLOPE
7
PHOTO REALISTIC (TO THE SCALE GRAPHIC DESIGN )
72 MTRS
8
FLAT GROUND 50 x 200 MTRS ON THE TOP OF 72 MTRS
CLIFF
START OF EXCAVATION
72 MTRS
9
EXCAVATIONS IN 10 MTR BENTCHES
10
AS PER THE SUITABILITY OF EXCAVATOR AVAILABLE
11
FLAT GROUND DESIGNED FOR TWO OPTIONS
OPTION 2 INSTALL PRIMARY CRUSHER CONVEY 200mm
CRUSHED AGGREEGATE FROM 72 MTRS HEIGHT
OPTION 1 DOZE BLASTED MATERIAL DIRECTLY FROM 72
MTRS HEIGHT
12
SHORTEST, SAFEST, MOTORABLE ROAD DESIGN
13
FIRST BENCH OF 10 MTRS HEIGHT
58292 cum
14
SECOND BENCH..
218744 cum.
15
THIRD BENCH..
393812 cum.
16
EVERY BENCH PRE-DESIGNED
605086 cum.
17
EVERY CO-ORDINATE IN THE DESIGN IS KNOWN
822805 cum.
18
EVERY STEP PRE-CONFIGURED IN THE MINE PLAN WHICH
WILL GO FOR YEARS
1032266 cum.
19
CAN VISUALISE ANY COMPLICATION WHICH MAY ARISE
AFTER SOME YEARS
1263592 cum.
20
VOLUME CALCULATIONS ARE ACCURATE AS ITS A CAD
DESIGN
1507198 cum.
21
SLOPE STABILIZATION AND DEWATERING POINTS ARE
DEFINED
1703947 cum.
22
EASY TO UNDERSTAND, EASY TO CONVINCE, EASY TO
UPDATE FOR YEARS
23
ONE SINGLE DRAWING START TO END
24
GOOGLE EARTH IMAGES
THANK YOU