Title: What is your IST Organizational Culture like? by NextEra Energy Seabrook Station LLC Bob Parry, Tim Couture, and Debbie Masters
1What is your IST Organizational Culture
like?byNextEra Energy Seabrook Station LLCBob
Parry, Tim Couture, and Debbie Masters
Inservice Test Owners Group (ISTOG)
Meeting December 2010
2Safety Culture
- Organizational Culture
- the shared basic assumptions that are developed
in an organization as it learns and copes with
problems. - the basic assumptions that have worked well
enough to be considered valid are taught to new
members of the organization as the correct way to
perceive, think, act, and feel. - Safety Culture
- An organizations values and behaviors modeled
by its leaders and internalized by its members
that serve to make nuclear safety the overriding
priority. - INPOs Principles for a Strong Nuclear Safety
Culture
3IST Culture IssuesA Team Effort?
- Who owns the IST Issues?
- IST Engineer?
- Component Engineer?
- System Engineer?
- Maintenance Engineering or even from a Broke/Fix
standpoint, Maintenance? - Each site will have their own unique issues, or
culture. - Work in progress, constantly evolving as we
address issues - Detailed Program Documents will help improve your
IST Culture - IST Program Bases Document (LAN) to show what
is/what is not/and why. - IST Database (LAN) with adequate depth of
content. - IST Implementing Procedures Generic, Pump,
Valves. - Visible Interface with other key groups on site.
4IST Culture Some Seabrook issues where we are
working to get ahead of the issue
- Instruments used for IST out of tolerance
Adverse trend? What is the interval? First time
event? - Stroke Time What is the trend? How to know
when it is adverse what rules are applied? - IST Pump - Close to ALERT value, or fails
surveillance test What was the trend? What/who
is tracking the issue? - Relief Valve fails setpoint test Repeat?
Contingency? Expanded Scope? What other valves
are impacted? What S/N is involved? - Relief Valve not tested within required timeframe
How and who is tracking? Change in model? - Check Valves How to describe Check Valve
Condition Monitoring activities Forward,
reverse, interval, PMT issues?
5IST Culture IssuesInstrumentation
- Pumps
- Recent IC Design calculations for Accuracy
- IC Maintenance Procedures or PM Tasks scheduled
in Work Management process - Protected steps for key attributes MTE,
intervals, when to adjust, etc. - Known locations for this info.
- Reviewed by IST Group for acceptability.
- Adequate Technical Rigor used in these reviews?
Partnering with Pump and System Engineer for
margin issues? (KPIs) - Database feature select by instrument,
historical sheet showing AF/AL results, past ARs
and corrective actions. - OX1456.86 contains all relevant acceptance
criteria info used as the technical bases for
Operations.
6(No Transcript)
7(No Transcript)
8IST Culture IssuesStroke Time Variations
- What has the historical trend been? Slow and
gradual?, versus sudden step? Margin issue? - How determined? At- a-glance, or graphical, or
statistical analysis? - When does troubleshooting begin? Some valves,
like AOVs, require partnering with Program
Engineer (KPIs) - Immediate retest performed?
- Control Room or local?
- Database feature graphical presentation
- OX1456.81 contains all relevant acceptance
criteria information used as our technical
bases for Operations.
9(No Transcript)
10(No Transcript)
11(No Transcript)
12(No Transcript)
13(No Transcript)
14(No Transcript)
15IST Culture IssuesPump Issues
- Hydraulic Condition
- what is the bases?
- Degradation taken in long term view (e.g. stair
step versus basement view), Head curve as
original test bases? (KPIs) - Scatter issues used to improve test methodology?
- Mechanical Condition
- Smooth running pumps and use of analysis being
identified as margin issue? - Design issues identified with corrective actions?
- Operations interface ON LINE versus Outage
- Baseline procedure protocols
- Shop head Curve test with vibrations as practical
- In situ Head Curve performed with IST (patience)
- CBM taking vibrations and performing analysis
16IST Culture IssuesPump Issues
- IST Database features
- Reference Values
- Test Results
- Instrumentation
- OX1456.86
- SS-EE-98-006 Engineering Systems Minimum
Performance
17From Program Plan
18(No Transcript)
19(No Transcript)
20(No Transcript)
21IST Culture IssuesRelief Valve Issues
- Database demonstration
- Spreadsheet Concept
- Group,
- Model,
- AF/AL,
- S/N,
- when tested,
- Contingency and outage sequencing
22(No Transcript)
23(No Transcript)
24(No Transcript)
25IST Culture IssuesRelief Valve Issues
- RV Issues
- Some Design changes to replace obsolete valve
designs - Change in trending
- Standardization of tail pipe to permit
interchangeability - Outage Planning for failures train rolls,
additional testing. - Not much expanded acceptance criteria (PZRs,
MSSVs for AF testing) - Hot/Hot Testing
- ES1850.011 Procedure, EX1804.044 for IST Valves
- Tracking of AL post refueling Outage??
- In house AR
- PZRs shipped
26IST Culture IssuesCheck Valve Condition
Monitoring Issues
- Two separate databases
- One on LAN and one in Group Drive
- Needed increased visibility
- Database Demonstration
- Analysis bases
- Forward Activity by activity/interval
- Reverse Activity by activity/interval
- Technical Rigor
- Two person review next outage focus.
- Instrumentation issues
- instrument accuracy
27IST Culture IssuesCheck Valve Condition
Monitoring Issues
IST Database denotes the valve is in Check Valve
Condition Monitoring
Active button opens the Check Valve Condition
Monitoring Database for information on the Check
Valve
28IST Culture IssuesCheck Valve Condition
Monitoring Issues
Initial Grouping of the valve including the date
for inclusion
29IST Culture IssuesCheck Valve Condition
Monitoring Issues
Valve Information future enhancements may
include link to valve picture and location map
30IST Culture IssuesCheck Valve Condition
Monitoring Issues
Maintenance History to review
31IST Culture IssuesCheck Valve Condition
Monitoring Issues
Maintenance and Test History has been reviewed as
well as operating experience from the industry
and vendor.
32IST Culture IssuesCheck Valve Condition
Monitoring Issues
Reverse Test done during PIV testing on a
refueling (18 month) frequency
Instrumentation Information
33IST Culture IssuesCheck Valve Condition
Monitoring Issues
Recorded Test Results future enhancement to
graph test results.
34IST Culture IssuesCheck Valve Condition
Monitoring Issues
Test Interval looks both past and future
35IST Culture IssuesCheck Valve Condition
Monitoring Issues
Forward Flow Activity Frequency, OPS activity
and OPS procedure
Instrumentation Information
36IST Culture IssuesCheck Valve Condition
Monitoring Issues
Recorded Test Results
37IST Culture IssuesCheck Valve Condition
Monitoring Issues
Test Interval looks at the past as well as
scheduling in the future
38IST Culture IssuesCheck Valve Condition
Monitoring Issues
- Post Maintenance Testing issues
- Planner Interface
- Component Engineer interface
- Outage Planning correct sequencing
- Performance Monitoring
- PWR PIV testing performance based
- Trending for next outage issues
- Transfer to OPS for SI Test Header Operation
- Not just getting to SAT
- Sequencing of the testing test second outs
before first outs get seated by RCS Pressure.
39IST Culture IssuesTrending vs. Data Entry
- Data Entry does not equal trending
- Technical Specification compliance verification
of the activity and that it meet acceptance
criteria - Performance Monitoring review - multi layered
- Identify adverse trend
- Focus on next outage activities
- Adjust knowledge of component performance
- Interface with System, Component, or other
Program Engineers
40IST Culture IssuesSummary
- Evolving effort
- Highlights only could not get into all of the
details - Welcome comments or questions
- Welcome recommendations