Title: PowerPoint Presentation Author: City of Cape Town Last modified by: user Created Date: 9/19/2002 5:52:28 AM Document presentation format: 35mm Slides – PowerPoint PPT presentation

Number of Views:51
Avg rating:3.0/5.0
Slides: 19
Provided by: Cityo159
Category:

less

Transcript and Presenter's Notes

Title: Review Flood Mitigation Project Cape Town Metro Informal Settlements Winters 2001 and 2002


1
ReviewFlood Mitigation ProjectCape Town
Metro Informal Settlements Winters 2001 and 2002
  • Nov 2002

2
(No Transcript)
3
Background
  • Winter of 2001 wettest in 40 years.
  • Extensive flooding of informal settlements.
  • Declaration of disaster by State President.

4
Background (contd)
  • National Ministerial task team established and
    inter-alia resolved
  • To institute immediate emergency relief measures.
  • Not to establish temporary settlement areas.
  • In the longer term to develop Greenfield sites to
    accommodate flood victims
  • Provincial/City task Team established to
    develop strategy, manage and co-ordinate flood
    mitigation measures.

5
Strategy for Emergency Relief
  • Strategy developed by Provincial/City Task Team
    and endorsed by Council Exco.
  • Preparedness
  • In-Situ relief measures
  • Temporary settlement areas.
  • Early warning systems.
  • Emergency shelter and social relief

6
Strategy Emergency Relief (contd)
  • Flood reporting
  • Response co-ordination
  • Assessment of flooded areas
  • Beneficiary registration
  • Health and support services
  • Safety and security

7
(No Transcript)
8
Financial PAWC Allocation

PAWC Allocation R 6 486 730 Expenditure Aerial Photography 40 251 Relocation 96 919 Communication 103 803 Sundries 92 325 Consultants 480 726 In-Situ Relief 2 809 505 General 68 827 Total R 3 694 356
9
In-Situ Relief Works
  • Works Comprised of
  • Filling of low lying flood affected areas
  • Grading of access tracks
  • Construction of drainage ditches
  • Construction of Stormwater intakes and allied
    pipework

10
(No Transcript)
11
(No Transcript)
12
(No Transcript)
13
Financial In-Situ Relief Summary

Settlement Value (R) Millers Camp 320 000 Mkhonto Square 190 000 SBDC 250 000 Joe Slovo 800 000 Browns Farm 340 000 Freedom Park Ottery 40 000 Khayelitsha 300 000 Mfuleni 10 000 Wallacedene 225 000 Various 334 505 Total R 2 809 505
14
Greenfield Developments
  • Mfuleni
  • Fedsure (Phillipi)
  • Wallacedene

15
Greenfield Development Status
1) Mfuleni (4461 sites) 1) Mfuleni (4461 sites) 1) Mfuleni (4461 sites)
Contract No. Sites Status
Complete 4461 Earthworks
Ph 1 Township Services 903 541 sites handed over Bal. due for handover mid-Dec 2002
Ph 2 Township Services 1096 Contract awarded 1st sites scheduled for handover 20 Jan 2003
Ph 3 Township Services 963 Contract awarded 1st sites scheduled for end Mar 2003
Ph 4 Township Services 527 Contract awarded 1st sites scheduled for early Mar 2003
Ph 5 Township Services 970 Tenders being adjudicated
16
Greenfield Development Status
2) Wallacedene (5 500 sites) 2) Wallacedene (5 500 sites) 2) Wallacedene (5 500 sites)
Blueridge Farm Farm 20/3 acquired Rezoning approvals now in place Blueridge Farm Farm 20/3 acquired Rezoning approvals now in place Blueridge Farm Farm 20/3 acquired Rezoning approvals now in place
Contract No. Sites Status
Farm 20/3 Bulk Services 620 Tenders advertised
Farm 20/3 Int. Services/Top Structures 620 To be advertised mid-Jan 2003
Ph 1 Blueridge Farm Bulk Services 3200 To be advertised mid-Jan 2004
Ph 1 Blueridge Farm Int. Services 3200 To be advertised end Jan 2003
17
Greenfield Development Status
3) Fedsure ( 1 063 sites) 3) Fedsure ( 1 063 sites) 3) Fedsure ( 1 063 sites)
Land acquired Rezoning subsidies approvals in place Land acquired Rezoning subsidies approvals in place Land acquired Rezoning subsidies approvals in place
Contract No. Sites Status
Earthworks/Det Pond 1000 Works under way Scheduled for completion Feb 2003
Internal Services 1063 To be advertised 22 Nov 2003
18
Financial Greenfield Development Land
Acquisition
Land Parcel Funding Source Funding Source Funding Source Funding Source
Land Parcel CCT (CLF) CCT (SDCF) DLA Total
Philipi Park R2,4m R 2,4m
Blue Ridge Farm R4,1m R8,0m R12,1m
Farm 20/3 R1,1m R 1,1m
Totals R3,5m R4,1m R8,0m R15,6m