Title: WP5.5. Railway solutions for the North-South and East-West flows
1WP5.5. Railway solutions for the North-South
and East-West flows
ILIM contribution
Leszek Andrzejewski
Project Part-financed
by the European Union
WP5.5. kick-off meeting - Oslo , 02.12.2009
2 Scope of ILIM works
- Inventory of the INTEREG,FRAMEWORK and
national - research projects aiming at connections
linking Poland - with Scandinavia.
- Deeper analysis of the bottlenecks and barriers
in the - projects focused on train connections of the
West part of - Poland with Scandinavia via port of Szczecin
/ - Swinoujscie.
- The findings will be confronted with container
train - connections recently established
- Ferry Train ex Poznan via Swinoujscie to Malmö
- Baltic Train ex Wroclaw via Swinoujscie to
Malmö
WP5.5. kick-off meeting - Oslo , 02.12.2009
3Milestone 1 Selection of transport corridors
- Transport corridor
- West Poland -The Nordic Triangle
- Existing connections
- Wroclaw (PL) - Malmö (SE)
- Poznan (PL) - Malmö (SE)
- Extensions under analysis
- Malmö - Stockholm (SE)
- Malmö - Oslo (NO)
- Modal shift
- Rail / Ferry / Rail
- vs.
- Truck / Ferry / Truck
WP5.5. kick-off meeting - Oslo , 02.12.2009
4 Identified Research Projects
-
- SEBTrans - South East Baltic Transport Link
- Baltic Gateway
- Baltic Gateway Plus
- Adriatic Baltic Landbridge
- Logchain Polcorridor
WP5.5. kick-off meeting - Oslo , 02.12.2009
5 SEBTrans - South East Baltic Transport Link
- Webside www.sebtrans.com
- Starting ending date 1999 Summer 2001
- Main objectives
- The main objective of the SEBTrans project is to
promote the use of transport corridors, modes and
technologies, which support a sustainable
regional, as well as an economic and social
development of the regions involved in the
project.
WP5.5. kick-off meeting - Oslo , 02.12.2009
6 Baltic Gateway
- Webside www.balticgateway.se
- Starting ending date March 2003 completed
in June 2006 - Main objectives
- BALTIC GATEWAY was a transnational Interreg
IIIB-project which involved 38 partners from 7
countries. The project promoted a comprehensive
system of high quality transport and transport
related services in the South Baltic Sea area,
aiming at regional development and sustainable
growth. The project was structured in four work
packages. -
WP5.5. kick-off meeting - Oslo , 02.12.2009
7 Baltic Gateway
Work package 1 dealt with the South Baltic Sea
area in a European and global perspective, as a
sustainable region relying on maritime transport.
The work included the following tasks. Work
package 2 worked with improved cohesion in the
area through improved accessibility. Selected
corridors and bottlenecks were investigated and
concrete investments prepared. The work included
a) Analysis of the corridor Copenhagen-
Blekinge-Klaipeda-Minsk,b) Analysis of the
corridor Copenhagen-Gedser-Rostock-Berlin-Prague,
c) Analysis of the corridor Copenhagen-Malmö-Ystad
-Szczecin-Wroclaw ,d) Planning a new rail link
Lund-Kristianstad.
8 Baltic Gateway Plus
- Webside www.balticgateway.se
- Starting ending date January 2006 completed
in December 2007 - Main objectives
- Baltic Gateway PLUS is a follow-up project to the
Baltic Gateway project. - The project has the following aims- Develop an
implementation Plan for priority investments in
intermodal transport infrastructure and services
in the South Baltic Sea area (SBSa) as identified
in the Baltic Gateway project,- Provide a base
for capacity building among the actors involved
in intermodal transport and sustainable spatial
development in SBSa,- Contribute to the
development of implementation measures for
trans-national projects,- Strengthen the
political transport co-operation in the South
Baltic Sea area,- Facilitate implementation of
selected transport infrastructure investements
and intermodal transport services. -
9 A-B LANDBRIDGE ADRIATIC-BALTIC LANDBRIDGE
- Webside www.ablandbridge.eu
- Starting ending date
- 06/2006 - 04/2008
- Main objectives
- Besides east/west connections and transport
corridors, the enlarged EU also needs an
improvement in the transport routes connecting
the Mediterranean and Baltic countries. The
Adriatic-Baltic land bridge project will conduct
a pre-feasibility analysis and develop a
deployment roadmap for north/south intermodal
transport connections which link Europe and the
Mediterranean countries with global markets.
10 Logchain POLCORRIDOR
- Webside
- Starting ending date 2002 - 2005
- Main objectives
- Study to develop , commercially validate an
intermodal system for trans European freight
transfer between nordic region and South East
Europe whose central building block will be
Blue Shuttle Train connecting two intermodal
centres of Szczecin/Swinoujscie and Gdynia/
Gdansk with Vienna.
WP5.5. kick-off meeting - Oslo , 02.12.2009
11 Scope of ILIM works
- Establishment of the transnational working
- group
- Rail transport operators
- Ferry operators
- Sea ports operators
- Shippers
WP5.5. kick-off meeting - Oslo , 02.12.2009
12 Working group focus
- The working group will study the case study of
established train connections - taking into consideration the following aspects
- Identification of good practices (the
bottlenecks and obstacles surmounted during
implementation of the above container train
connections) - Identification of still existing bottlenecks
and barriers requiring improvements - Drawing up the action plan of short-term and
low-budget issues - Identification of investments required as
recommendations to the regional - transport strategic plan
- Analysis of competitiveness of the container
train connection with road - alternatives
- Analysis of possibility to enlarge
connection from Malmö to Stockholm - and Oslo basing on potential volumes and
alternative freight calculation. -
WP5.5. kick-off meeting - Oslo , 02.12.2009
13 Scope of co-operation with the WP5.5.
partners
-
- analysis of containerised cargo flows
- between Scandinavia and Poland
- specification of container trains
- connections between Malmoe and
- Stockholm / Oslo
- time tables
- freight / handling rates
WP5.5. kick-off meeting - Oslo , 02.12.2009
14Thank you for your attention
Instytut Logistyki i Magazynowania
Leszek Andrzejewski ul. Estkowskiego 6 61-755
Poznan Phone 48 61 850 48 79 Fax 48
61 852 63 76 leszek.andrzejewski_at_ilim.poznan.pl
WP5.5. kick-off meeting - Oslo , 02.12.2009