Twin Groves Wind Farm Bloomington Moraine McLean County, Illinois A Strong Beginning for Illinois Wind Robert Nagel robertn84_at_gmail.com Project Overview Phase 1: 120 ... – PowerPoint PPT presentation

Number of Views:165
Avg rating:3.0/5.0
Slides: 12
Provided by: Robert2150
Category:

less

Transcript and Presenter's Notes

Title: Twin Groves Wind Farm Bloomington Moraine McLean County, Illinois


1
Twin Groves Wind FarmBloomington Moraine McLean
County, Illinois
  • A Strong Beginning for Illinois Wind
  • Robert Nagel
  • robertn84_at_gmail.com

2
Project Overview
  • Phase 1 120 Turbines
  • As of 4/28/07 64 Operational Turbines
  • Phase 2 120 Turbines
  • Totals 240 Turbines 400 Megawatts 120,000
    homes
  • Spans 50 square miles
  • 1,500 ft from living spaces
  • 500 ft from highways
  • 450 ft from county roads
  • 700 Million Project Cost
  • About 12 year Payback period

3
(No Transcript)
4
Tools for Project Estimates
  • Wind Class
  • Local Wind Rose
  • Site Specific Measurements
  • Turbine Details
  • Economic Climate of Illinois Electricity Markets

http//www.iira.org/pubsnew/publications/IVARDC_Re
ports_614.pdf
5
2002-2007
  • Horizon Launches Idea to Landowners
  • Informational Dinners Private Meetings
  • Authorize Test Towers at proposed sites
  • Federal Production Tax Credit
  • 1.8 cents per KWh for 10 years
  • Positive Test Data
  • 17 mph _at_ 80 m
  • Capacity Factor 35-39 means producing the rated
    power that of time
  • Make some sort of electricity over 91 of the
    time

6
Vestas V-82 1.65 MW
  • Denmark
  • Blades, Nacelle, and Rotor
  • Flown to Louisiana, Railed to Bloomington,
    Trucked to Sites
  • Hub Height 80 m
  • Blade Diameter 82 m
  • Cut In 7-9 mph
  • Cut Out 55 mph
  • Active Pitch Control
  • Yaw Mechanism

7
Transmission
  • New Construction
  • 103 Miles Underground
  • Cables
  • 12 Miles Surface Cables
  • 1 Million per Mile
  • 2 Step Up Substations
  • Local Transmission
  • Regional Transmission
  • ComEd Lines

8
Down on the Farm
  • Warren and Betty
  • 6 Turbines
  • Receive Lease Payments
  • 5,100 per turbine, per year
  • payments increase with Consumer Price Index
    Inflation
  • Land Options
  • Leasing Similar to a fuel cost
  • Buying Higher Capital Cost
  • Limited Liability Corporation (LLC)

9
Illinois 2006 Electricity Generation 16,444
GWh 2007 Electricity Generation 18,251 GWh 11
Increase
Energy Information Administration Table 1.6.A.
Net Generation by State by Sector, January 2007
and 2006
http//www.eia.doe.gov/oiaf/aeo/pdf/trend_2.pdf
10
Political Conditions
  • Renewable Portfolio Standards (RPS)
  • Non-mandatory Goal of 8 in 2013
  • Solar Water Heat, Solar Thermal Electric,
    Photovoltaics, Landfill Gas, Wind, Biomass,
    Hydroelectric, CHP/Cogeneration
  • 75 from Wind

11
Conclusions
  • Pursuit Yankee Ridge
  • Land Owners
  • Site Specific Data
  • Proximity to Grid Transmission
  • Politically Encourage Wind Power
  • Mandatory Renewable Portfolio Standard
  • Federal Tax Reduction Credit
  • Carbon Tax