Maggie Alvarado - PowerPoint PPT Presentation

1 / 13
About This Presentation
Title:

Maggie Alvarado

Description:

Title: Trigeneration System Author: Chiang Shih Last modified by: Natalie Levings User Created Date: 10/16/2006 11:32:20 PM Document presentation format – PowerPoint PPT presentation

Number of Views:90
Avg rating:3.0/5.0
Slides: 14
Provided by: Chia164
Category:

less

Transcript and Presenter's Notes

Title: Maggie Alvarado


1
Tri-generation System Scope Progress Report
  • Maggie Alvarado
  • Diego Azevedo
  • Raphael Santos Cavalcanti
  • Natalie Levings
  • Richard Robards
  • Bruno Vieira

2
Overview
  • Status at End of Fall Design Choices Solidified
  • Current Status
  • Scope of Work for Spring
  • Heat Regulation
  • Water-heating Unit
  • Alternative Fuels Engine Conversion
  • Expansion
  • Testing
  • Collaboration with Brazil Expansion
  • Major Difficulties
  • Schedule/Plan
  • Spring Schedule
  • Conclusion

3
Status at End of Fall
  • Heat Regulation for Refrigeration Unit
  • The heat bypass for the refrigerator to be
    automated and determined by refrigerator
    temperature
  • Water Heating Unit
  • Bypass water-heating unit and distiller to be
    added.
  • Alternative Fuel
  • A conversion kit to be added that will allow the
    engine to run off of compressed natural gas (CNG)
    and gasoline.
  • Gas Expansion
  • The expanding gas from the natural gas tank to
    be used to aid in cooling the current cool space.

4
Current Status
  • Design choices have been made
  • All component have been ordered except for the
    natural gas tank.
  • 80 of the components have been received.
  • Preliminary expansion calculations from Brazilian
    teammates have been completed.
  • Design of second cool space.

5
Scope of Work for Spring Heat Regulation
Late January- Early Febuary
Tasks Machine Valves, install Piping and Install
Electronic Components for Automation.
Bypass Piping
Valve
Rotary Actuator
6
Scope of Work for Spring Water Heating Unit
Late January- Early Febuary
Tasks Install Bypass Piping, machine valve, add
distiller and heating element.
Location of Distiller Unit
Bypass Piping
Copper Heating Element
Copper Piping
Insulated Sides
Water Distiller
7
Scope of Work for Spring Alternative Fuels
Engine Conversion
Late January- Early Febuary
Tasks Install conversion kit and piping for
natural gas supply Obtain natural gas
Engine
8
Scope of Work for Spring Expansion
Febuary
Tasks Route expanding gas to cool distiller
collection container.
See Video
9
Scope of Work for Spring Testing
March
?
?
?
  • Temperature K-type thermocouples
  • Flow Velocity Flow-meter
  • Data Collection LabVIEW

?
?
?
?
?
Locations of Thermocouples
Legend 1. Water Reservoir Inlet 2. Water
Reservoir Outlet 3. Refrigeration Space 4.
Conduction Circuit End 5. Exhaust 6. Bypass
Piping Inlet to Distiller 7. H/X Exhaust Inlet 8.
H/X Exhaust Outlet
10
Collaboration with Brazil Expansion
  • The team has accomplished the following via
    weekly video conferences, e-mails and file
    exchange
  • Preliminary calculations for cooling effects of
    rapidly expanding gas
  • Design of second cool space around distiller
    collection unit.

11
Major Difficulties
  • Electronic Components
  • CNG
  • Assembly
  • Scheduling

12
Schedule/Plan Proposed Spring Schedule
13
Conclusion
  • Status at End of Fall Design Choices Solidified
  • Current Status
  • 80 of components in house ready to be assembled
  • Change to how expansion will be used
  • Scope of Work for Spring
  • Assembling and modification to take place in
    January and February
  • Testing to begin in March
  • Collaboration with Brazil
  • Expansion will be used to cool water from
    distiller
  • Schedule/Plan
Write a Comment