Whse Stormwater Basin 4 LEED Site Boundary 25.7 ac. Project Site 88.7 ac. Stormwater Basin 1 Master Plan of the Facility Structured Parking Lab/Office Central ... – PowerPoint PPT presentation

Number of Views:79
Avg rating:3.0/5.0
Slides: 14
Provided by: ScottWhi9
Category:

less

Transcript and Presenter's Notes

Title: 2nd Annual Low Impact Development Conference and Vendor Fair


1
2nd Annual Low Impact Development Conference and
Vendor Fair
EXPANDING HORIZONS
Progress in Massachusetts and New England Case
Studies
  • June 23, 2008

2
Industrial Case Study
  • Bristol-Myers Squibb Company
  • Large Scale Cell Culture Facility
  • Devens, MA

Presented By Lauren DeVoe, LEED AP Michael
Seluga, LEED AP
3
Devens, Massachusetts
  • 4,400 acre currently self-contained community set
    on Former Army base in Central Massachusetts
  • The entire site is managed by MassDevelopment
  • Expedited permit process through the Devens
    Enterprise Commission (DEC)

4
Devens Reuse Plan
  • Goals - Development must be sustainable, which
    means achieving a balance of economic, social,
    and environmental needs, while maintaining and
    enhancing the natural resource base.

Bristol-Myers Squibb
  • BMS Corporate Sustainable Mission -
    Sustainability at Bristol-Myers Squibb means
    delivering on our mission to extend and enhance
    human life in a way that supports the capacity of
    future generations to meet their needs. We do
    this by focusing on the economic, social, and
    environmental impacts of our businesses and
    operations.

U.S. Green Building Council
  • Guiding Principle 1 - USGBC will pursue robust
    triple bottom line solutions that clarify and
    strengthen a healthy and dynamic balance between
    environmental, social and economic prosperity.

5
Devens Enterprise CommissionDevelopment Rules
and Regulations (974 CMR)
  • Bicycle storage facilities required on site
  • Required to minimize Topographic Alterations and
    Preservation of Existing Vegetation
  • Landscape treatments encouraged to preserve and
    enhance wildlife habitat
  • Design of stormwater management facilities
    compared to an existing green field condition

6
LEED Certification of Large Scale Cell Culture
Facility (Phase 1)
  • LEED-New Construction with Application Guide for
    Multiple Buildings and On-Campus Building
    Projects

7
Existing Site Conditions
8
Phase I of the Facility
Main Entry at Jackson Rd.
Substation
LEED Site Boundary 25.7 ac.
Back-Up Power
Stormwater Basin 5
WWPTF
Structured Parking
Chemicals Storage
Stormwater Basin 4
Raw Matl. Whse
Lab, Office Cafeteria
Stormwater Basin 1
LSCC 1 Building
Utility Yard
Central Utilities
Project Site 88.7 ac.
9
Master Plan of the Facility
Structured Parking
Main Entry at Jackson Rd.
Lab/Office
Devens Substation
Cafeteria
WWPTF
Chemical Storage
LSCC1
P1
2
3
2
LSCC2
P2
2
Raw Matl. Warehouses
3
P3
LSCC3
Central Utilities
Structured Parking
10
Site Development
  • Protect Habitat (SSc5.1)
  • Maximize Open Space (SSc5.2)

June 2008
11
Stormwater Basin 5
  • Protect Habitat (LEED - SSc5.1)
  • Maximize Open Space (LEED - SSc5.2)
  • Stormwater Quantity Control (LEED - SSc6.1)

May 2007
November 2007
12
Stormater Basin 1
  • Provides stormwater containment
  • Groundwater Recharge
  • Stormwater Quantity Control (LEED - SSc6.1)