ERCOT Nodal ICCP Communication Handbook - PowerPoint PPT Presentation

1 / 7
About This Presentation
Title:

ERCOT Nodal ICCP Communication Handbook

Description:

Ultimately to enable the ERCOT EMS SCADA system to provide Market and Reliability functions required by the Texas Nodal Protocols. ICCP handbook organization ... – PowerPoint PPT presentation

Number of Views:40
Avg rating:3.0/5.0
Slides: 8
Provided by: BillBl3
Category:

less

Transcript and Presenter's Notes

Title: ERCOT Nodal ICCP Communication Handbook


1
ERCOT Nodal ICCP Communication Handbook
  • Bill Blevins
  • Frank Kendall

2
Handbook Activities
  • Feb 28th TPTF approved SCADA requirements
    document.
  • ERCOT discussed ICCP codes with AREVA, ERCOT
    Operations, NMMS, MMS, ICCP beta testing group
    (EDS), EIP(Texas Nodal Enterprise Integration
    External Interfaces Specification), EMS groups,
    and the Network Data Support Working Group.
  • ERCOT discussed ICCP codes with TPTF March 22nd.
  • April 18th posted for TPTF comments thru May
    2nd.
  • May 2nd thru May 7th ERCOT staff modify based on
    comments.
  • May 7th-8th review with TPTF.
  • May 14th post for Nodal Market Participants.
  • June 1st EDS phase delivery 2 starts point to
    point check out with TSP Market Participants.

3
Audience of the handbook is
  • Market Participants ICCP Vendor.
  • ERCOT ICCP Vendor.
  • ERCOT technical staff.
  • ERCOT Market Participant technical staff.
  • ERCOT Market Participant business
    representatives.
  • ERCOT business staff.

4
Goal of the ICCP handbook
  • Inform ERCOT and Market participant ICCP vendors
    and technical staff on methods and processes to
    uniformly configure and implement a high
    availability ICCP data transfer.
  • Ultimately to enable the ERCOT EMS SCADA system
    to provide Market and Reliability functions
    required by the Texas Nodal Protocols.

5
ICCP handbook organization
  • Section 1, Introduction describes the purpose and
    scope of the ERCOT Nodal ICCP Communication
    Handbook
  • Section 2, Connecting to the ERCOT Wide Area
    Network.
  • Section 3, ICCP Conventions provides details on
    the ICCP client/server architecture and describes
    parameters necessary for all Market Participants
    to successfully establish communication with
    ERCOT using ICCP.
  • Section 4, QSE Connection requirements.
  • Section 5, TSP Connection requirements.
  • Section 6, Data Available to All Market
    Participants describes data produced by ERCOT
    available to all Market Participants with ICCP
    nodes.
  • Section 7, Data Calculated Locally by ERCOT
    describes values that ERCOT calculates from TSP
    telemtered information.

6
New Information
  • Document.
  • Title changed
  • Added in reference to EIP (Texas Nodal Enterprise
    Integration External Interfaces Specification.
  • ERCOT Equipment diagram.
  • New equipment delivered by ERCOT (Fig-2).
  • ERCOT architecture for high availability.
  • New ERCOT architecture will support both Taylor
    and Austin communication nodes live.
  • SCADA will receive information from first primary
    and will shift to second primary Node on a loss
    of first primary.(Fig-3).
  • Section 3.4 Quality Code and Source details
  • ICCP domain convention
  • Table 4-6 to describe code translations.
  • Section 3.4.1 illustrated examples of ICCP code
    handling for MP and ERCOT.
  • TSP information
  • Table 39 naming convention examples.
  • QSE information
  • Table 22-24 naming convention and examples.
  • SCED and Nodal LFC information.
  • Data available to all market participants
  • ICCP point naming convention.

7
Unresolved
  • Sign Convention.
  • Some comments from MPs are that the current sign
    convention is confusing.
  • ERCOT Block 4 messages.
  • Free form text reasons for operation beyond HSL,
    LSL and Ramp Rates.
Write a Comment
User Comments (0)
About PowerShow.com