Egyptian Experience in Establishment and Application of Safety Conditions for Mobile Base Stations - PowerPoint PPT Presentation

1 / 28
About This Presentation
Title:

Egyptian Experience in Establishment and Application of Safety Conditions for Mobile Base Stations

Description:

Egyptian Experience in Establishment and Application of Safety Conditions for Mobile Base Stations Dr. Bahnasy M. NOSSIER Dr. Hesham M. ELBADAWY, NTI, Egypt – PowerPoint PPT presentation

Number of Views:148
Avg rating:3.0/5.0
Slides: 29
Provided by: Dr1123
Learn more at: http://www.ituarabic.org
Category:

less

Transcript and Presenter's Notes

Title: Egyptian Experience in Establishment and Application of Safety Conditions for Mobile Base Stations


1
Egyptian Experience in Establishment and
Application of Safety Conditions for Mobile Base
Stations
Dr. Bahnasy M. NOSSIER Dr. Hesham M. ELBADAWY,
NTI, Egypt
2
Contents
  • Introduction
  • Egyptian Safety Codes
  • Statistics and Configurations for Macro BTS
  • Statistics and Configurations for Micro BTS
  • Configurations for IR Links
  • Main Achievements
  • Conclusion

3
Introduction
  • The Egyptian Experience for the Mobile BTS safety
    codes has been realized by executing the Egyptian
    national project for auditing and monitoring for
    the mobile base stations.
  • The project has begun since 2001
  • The project is as a result of successful
    cooperation between the National
    Telecommunication Institute (NTI) and the
    National Telecommunication Regulation Authority
    (NTRA)
  • The main objective of this project is to apply
    the certified protocols for both of the old
    installed base stations and newly ones.

4
Egyptian Safety Codes
  • Three Protocols have been issued to regulate the
    installation of micro and macro sites, approved
    by 3 ministries
  • -Communications Information Technology
  • -Environment Affairs
  • -Health and Population
  • Macro, Micro, and IR safety guide lines have been
    issued based on the research studies that had
    been done by the Egyptian research groups from
    NTI and TRA and according to the international
    safety guide lines.
  • The Egyptian safety codes may be summarized as
    follows

5
Summary of the Egyptian Safety Code 1- Macro BTS
  • The Antenna heights (15m to 50m)
  • 6 m in the main beam
  • 2 m in the back beam
  • The antenna is above the surrounding buildings in
    the radius of 10 m
  • The Maximum Permissible Exposure (MPE) Limit is
    0.4 mW/cm2
  • The antenna height of the pylon on the roof top
    is not less than 6 m
  • The antenna must be fixed on the concrete
    structure roof top

6
2- Micro BTS
  • The Antenna heights (not less than 2.5m)
  • 0.5 m in the main beam
  • Small gain antenna
  • The MPE is 0.4 mW/cm2

7
3- IR
  • The unit must be mounted on 3 m pole at the
    middle of the roof top or 6m pole for street
    mounted units
  • the main beam must be directed completely to the
    outer space of the roof top
  • The MPE is 1 mW for the aperture of 7 mm

8
Macro-cells measured in 2001
9
Macro-cells measured in 2002
10
Macro-cells measured in 2003
11
Macro-cells measured in 2004
12
Macrocells measured per Governorate in 2001
(June-December)
13
Macro-cells measured per Governorate in 2002
14
Macro-cells measured per Governorate in 2003
15
Macro-cells measured per Governorate in 2004
(January-March)
16
(Re-measured / New) Macro-cells measured in 2004
1st Quarter
17
Configuration of Macro BTS
  • Roof Top
  • Poles on the boarder of the roof
  • Pylon
  • Penthouse
  • Highway Towers
  • Water Tanks
  • Mobile BTS (Cell on wheels)

18
Measured micro-cells in 2002
19
Measured micro-cells in 2003
20
Measured micro-cells in 2004
21
Micro-cells measured in 2002
22
Micro-cells measured in 2003
23
Configuration of Micro BTS
  • Outdoor
  • Patch on Poles
  • Side arm patch
  • Side arm omni
  • Indoor
  • Ceiling Mounted omni
  • Wall mounted patch

24
Measured IR in 2004
25
Configuration of IR
  • Pole mounted
  • Penthouse mounted
  • Roof top edge mounted

26
Main Achievements
  • Most of installed sites had been measured
  • Establishment of re-auditing program
  • Surveys cover all of the Governorates
  • Measures about 100 sites per month

27
Conclusion
  • Egypt has issued three protocols for Macro,
    Micro, IR sites.
  • Issuing procedure for site acceptance certificate
  • Continuosly revises re-measure of the installed
    sites. In order to check the current situation of
    the site.
  • Updating of our protocols based on the experience
    gained from practical surveys and following new
    researches in this field.

28
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com