16:00 Meeting - PowerPoint PPT Presentation

1 / 2
About This Presentation
Title:

16:00 Meeting

Description:

16:00 Meeting Mon. June 28 Fri. June 25 Thurs. June 24 Wed. June 23 Tue. June 22 Mon. June 21 Fri. June 18 8a-4p 8a-4p Mech. Team Build/install protective cage – PowerPoint PPT presentation

Number of Views:26
Avg rating:3.0/5.0
Slides: 3
Provided by: Larr47
Category:
Tags: daily | meeting

less

Transcript and Presenter's Notes

Title: 16:00 Meeting


1
1600 Meeting
Fri. June 18 Mon. June 21 Tue. June 22 Wed. June 23 Thurs. June 24 Fri. June 25 Mon. June 28
8a-4p Mech. Team Fasten TEM to Mini-CAL TEM-TKR flex cable mates Setup for Single Bay LPT Gary Setup for Van Der Graaff test Elec.Team, Online Single Bay LPT 8a-4p Gary, Mech.Team Repair Van Der Graaff CAL pedestal noise calibration Reset CAL thresholds 8a-4p Gary, Mech.Team Repair Van Der Graaff Mech. Team, QA Transport EM2 TEM/TPS and EGSE to bld 33 Inspection of EM2 TEM/TPS Setup for EM2 TEM/TPS bench test Elec.Team, Online EM2 TEM/TPS safe-to-mate test Mech. Team Swap-in EM2 TEM/TPS Elec.Team, Online Single Bay LPT CAL pedestal noise calibration Set CAL thresholds Test runs 8a-4p Gary, Mech. Team Setup for Van De Graaff Test Test Runs Elec.Team, Online Setup for Van De Graaff data taking Collect test data Offline Van De Graaff data analysis (test runs) 8a-4p Gary, Mech. Team Van De Graaff operations Elec.Team Van De Graaff data taking Offline Van De Graaff data analysis 8a-4p Mech. Team Build/install protective cage Elec.Team Single Bay LPT Mech. Team Ship Mini-Tower assembly to bld 84 ELX lab 8a-4p
4p-8p Gary, Mech.Team Repair Van Der Graaff 4p-8p 4p-8p Offline Cosmic Ray data analysis (test runs) 4p-8p Offline Van De Graaff data analysis (test runs) 4p-8p Offline Van De Graaff data analysis 4p-8p Elec.Team Post-ship Single Bay LPT 4p-8p
2
Action Items
  • Transportation of EM2 TEM/PSU to bld 33 Eliazar
    Ortiz
  • Mechanical inspection of EM2 TEM/PSU connectors
    and standoff holes Eliazar Ortiz, Rich Gobin,
    Tom Borden, Jerry Clinton
  • Proof test of Mini-Tower assembly lift fixture
    Dave Kiehl
  • Manufacture Van de Graaff part Reggie Rogers
  • Repair Van de Graaff Gary Godfrey
  • Prepare for Van de Graaff operations Gary
    Godfrey, Mech. Team
  • Build Mini-Tower assembly cart/cage Mech. Team
  • Setup operator workstations in room 102 John
    Canfield
  • Operator training (Gary, Tune, Larry, Brian,
    John) for data taking Online, Offline
  • Check Cosmic Ray test data Xin Chen
  • Module time-in procedure Brian Horwitz, Larry
    Wai
  • Determine schedule for delivery of EM2 EGSE to
    IFCT Brian Horwitz
  • Setup for EM2 TEM/PSU bench tests Eliazar Ortiz
  • EM2 TEM/PSU Safe-to-mate Test Brian Horwitz
  • Swap-in EM2 TEM/PSU Eliazar Ortiz
  • Setup for Single Bay LPT Eliazar Ortiz
  • Execute Single Bay LPT (w/ EM2 TEM/PSU) Brian
    Horwitz, John Canfield, Jim Panetta, Lester
    Miller
  • CAL pedestal and noise calibration (compare w/
    EM1) Brian Horwitz
  • Execute CAL CPT Brian Horwitz, John Canfield
Write a Comment
User Comments (0)
About PowerShow.com