Title: Building Order


1
Lecture was elaborated with the help of grant
project of Ministry of Education, Youth and
Sports, FRVŠ n. 2005 Innovation of Subject
Financing of Building Order
  • Building Order

2
Subject of a Building Activity
  • Activity of a building company is based on a
    realization of building orders
  • Building order
  • Supply of outputs, works and services for purpose
    of creating of new building object or adapting of
    an existing object
  • A result of a building order realization can be
  • New building newly created building object
    having a character of long-term tangible property
    and creating a compact or at least technically
    separate part of a building
  • Reconstruction of an object construction work
    including interference with building
    constructions
  • Modernization of an object construction work
    substituting existing parts of an object by more
    modern parts and increasing availability and
    usability of an building object
  • Extension of an object additional building

3
Kinds of Building Production
  • Building production it is possible to divide into
    following kinds
  • Basic structural production
  • Includes supplies of building works realized own
    workers or sub suppliers
  • These supplies it is possible next to divide into
    following kinds of production
  • Main building production
  • Includes supplies of building works realizes
    mainly on fabric (foundations, horizontal and
    vertical constructions etc.)
  • Associated building production
  • Includes professions and handcrafts
  • Subsidiary production
  • Includes preparation of resources and facilities
    needed for basic structural production, e.g.
    production of intermediate products and
    production of building materials

4
Kinds of Building Orders According to the Investor
  • From the aspect of a investor character (or
    sources of financing)
  • it is possible to distinguish following kinds of
    works
  • Public order (state or institutions of public and
    self administration (towns, regions) or other
    organizational parts of the state)
  • Private order
  • Individual orders (investors are usually in a
    form physical persons that dont realize the
    order in the frame of own business activity)
  • Orders in the frame of a business sphere
    (investor is in the form of private person that
    realize the order in the frame of own business
    activity)

5
Public Order
  • Law n. 137/2006 Coll., about public orders
  • Public order is realized based on agreement
    between submitter (public institution) and one or
    more contractors. Subject of public order is the
    delivery of supplies, services or realization of
    building works. Public order is based on the
    written agreement (7).
  • The submitter can be public, endowed or sector
  • Public submitter the state, municipal
    authorities or allowance organizations financed
    by state
  • Endowed submitter physical person or
    corporation, which submits the public order
    financed from more then 50 by public sources
  • Sector submitter person, which realizes one of
    relevant activities (e.g. gas industry, power
    supply, supply of heat or water)

6
Classification of Public Orders according to the
Subject
  • According to the subject are divided into
  • PO for supplies 8
  • PO for services 10
  • PO for building works 9
  • Public order for supplies
  • Its subject is the purchase of goods
  • Public order for building works
  • Its subject is the realization of building works
    including relevant project works and engineering
    activity
  • Public order for services
  • - PO, which is not PO for supplies or PO for
    building works

7
Classification of Public Orders According to the
Supposed Value
  • According to the supposed value are public order
    classified in following way
  • PO exceeding the limit
  • PO not exceeding the limit
  • PO of low extension
  • Financial limit in the case of public orders is
    defined by implementing regulations, which
  • define the financial limit according to the
    particular categories of submitters and according
  • to the kind of public order.
  • PO not exceeding the limit
  • Supplies and services min. 2 000 000 CZK without
    VAT, building works min. 6 000 000
    CZK without VAT not reaching the financial limit
  • PO of low extension
  • Less then 2 000 000 CZK without VAT in the case
    of supplies and services, less then 6 000
    000 CZK without VAT in the case of building works
  • No duty to award this kind of order according to
    the law
  • The public order must not be divided into small
    parts with smaller extension

8
Procurement of Public Orders
  • Law about Public Orders defines these kinds
  • awarding procedures
  • Open proceedings 27
  • Close proceedings 28
  • Parley proceedings with declaration 29
  • Parley proceedings without declaration 34
  • Competition dialog 35
  • Simplified proceedings 38

9
Kinds of Awarding Procedures
  • Kinds of procurement proceedings
  • Open proceedings
  • Submitter calls on unlimited amount of applicants
    for the submitting of an offer
  • Close proceedings
  • Submitter calls on unlimited amount of applicants
    for the submitting of an application and for the
    presentation of a qualification, applicants
    fulfilling defined conditions are called for
    submitting of offers
  • Parley proceedings with declaration
  • Submitter announces to unlimited amount of
    applicants the idea to submit the public order in
    this kind of proceedings
  • Parley proceedings without declaration
  • Submitter announces to limited amount of
    applicants the idea to submit the public order in
    this king of proceedings
  • Competition dialog
  • Submitting of difficult orders, where the
    submitter is not able directly to define
    technical conditions or legal or financial
    requirements
  • Simplified proceedings
  • Submitting of public orders not exceeding the
    financial limit (in the case of building works
    deliveries not exceeding 20 mil. CZK)

10
Qualifying Criteria
  • Qualifying criteria are
  • Basic qualification criteria
  • No arrears of taxes
  • Clean conduct-book
  • No arrears of health and social insurance
  • Not to be in the bankruptcy
  • Professional qualification criteria
  • Extract from Company Register
  • Business license
  • Economic and financial qualification criteria
  • Balance sheet from past periods
  • Amount of returns
  • Insurance agreement (insurance of responsibility
    for lost caused to another person)
  • Technical qualification criteria
  • Reference buildings

11
Criteria for Submitting of Public Order
  • Basic criterions for valuation of particular
    offers
  • Economic merit of the offer
  • The lowest offering price
  • The decision making according to the economic
    merit of the offer
  • The offer is valuated according to the particular
    criterions solved by submitter
  • The submitter must define for each criterion
    scales usually expressed in
  • One of the criterion must be every time the
    offering price, next criterions are
  • mostly
  • Operating costs
  • Requirements for the maintenance
  • Technical, quality, ecological and functional
    characteristics of the subject of the order

12
Submitting of Private Orders
  • Tender, which features (the process, criteria,
    etc.) are chosen by investor (submitter) on his
    own
  • For trouble free process of the (building) order
    must be concluded the contract for work created
    according to the Civil or Business Code

13
Contract for Work
  • Price is agreed in the agreement about price
    mentioned in the contract for work
  • Parties to contract are investor (buyer) and
    supplier
  • Contract is agreed in the sense of the business
    code (law n. 513/1991 Coll.)
  • Terms of contract for work
  • I. Parties to contract investor, supplier
  • II. Subject of delivery building object,
    building work
  • III. Time of delivery time of finishing of the
    delivery
  • IV. Price of delivery
  • V. Payment conditions the way of paying for
    deliveries
  • VI. Qualitative and technical conditions
  • VII. Realization of work
  • VIII. Handover and takeover of building object
    way of handover
  • IX. Responsibility for defects, guarantee,
    warranty claims
  • X. Avoidance of contract
  • XI. Sanctions
  • XII. Next agreements

14
Financial Difficulty of the Building Order, Budget
  • Costs for building part are calculated as a sum
    of costs
  • for particular building works
  • materials not included in the building work
    (valuated as a specification)
  • shift with materials
  • For calculation is prepared the item budget

15
Overview of Groups of Building Sections
Number Title of group of building sections
0 General construction and works
1 Earthworks
2 Foundations, special foundations
3 Vertical and complete constructions
4 Horizontal constructions
5 Communications
6 Construction of surfaces, floors
7 Associated building production (handcrafts, installations)
8 Pipage, conduction
9 Finishing works, demolitions
16
Item of Budget of Building Part
  • Numeral code of item (Classification of Building
    Constructions and Works)
  • Description of item
  • Measure unit
  • Amount of item in measure unit
  • Unit price in e.g. CZK per measure unit
  • Totally per item
  • Unit weight in tons
  • Weight in tons totally per one item

17
(No Transcript)
18
Costing Model (Formula)
  • Unit price of building work
  • Direct costs (DC)
  • Direct material (M)
  • Direct wages (W)
  • Other direct costs (ODC)
  • Machines and machinery (S)
  • Indirect costs (IC)
  • Overhead product costs (OPC)
  • Overhead administrative costs (OAC)
  • Profit (P)
  • Price totally