TMC Operator Requirements and Position Descriptions, Phase 2, Kickoff Meeting

Description:

TMC Operator Requirements and Position Descriptions, Phase 2, Kickoff Meeting Presented by Dennis J. Folds Disclaimer Georgia Tech is not yet under contract to UMTRI ... – PowerPoint PPT presentation

Number of Views:116
Avg rating:3.0/5.0
Slides: 14
Provided by: HollyH56
Category:

less

Transcript and Presenter's Notes

Title: TMC Operator Requirements and Position Descriptions, Phase 2, Kickoff Meeting


1
TMC Operator Requirements and Position
Descriptions, Phase 2, Kickoff Meeting
  • Presented by Dennis J. Folds

2
Disclaimer
  • Georgia Tech is not yet under contract to UMTRI
    for this task
  • Remaining issues are administrative we expect
    them to be resolved quickly
  • Some planned kickoff meeting items will be
    provided after the contract is in place
  • Draft project fact sheet
  • Project management data

3
Overall Technical Approach
  • Conduct intensive review of Phase 1 material
  • Determine what Phase 1 material to include in
    software tool
  • Identify gaps in Phase 1 material, and develop
    material necessary for tool support
  • Define functional requirements for interactive
    tool
  • Software capabilities
  • User interface features

4
Overall Technical Approach
  • Determine software architecture and requirements
  • Platform requirements
  • Software standards
  • Configuration management
  • Software design, development, and testing
  • Develop preliminary tool design and prototypes
  • Finalize design
  • Develop software
  • Perform software testing

5
Overall Technical Approach
  • Usability testing of tool
  • Develop a usability test plan
  • Perform usability testing
  • Develop usability test report with
    recommendations for modifications
  • Finalize interactive tool
  • Documentation
  • Outreach material
  • Technical support

6
Project Schedule
  • Phase 1 review Day 45
  • Functional Requirements Document Day 75
  • Software Architecture and Software Requirements
    Documents Day 120
  • Usability Test Plan Day 120
  • Preliminary design and prototypes Day 150

7
Project Schedule
  • Software Test Plan Day 180
  • Detailed Design Document Day 210
  • User Quick Reference Guide Day 250
  • Ready for testing software Day 280
  • Phase 1 revision material Day 320

8
Project Schedule
  • Summary project report Day 340
  • Usability Test Report Day 360
  • Final tool Day 400
  • Detailed plan available in Microsoft Project

9
Staffing Plan
  • Dr. Dennis J. Folds Task Order Lead
  • Dana Stocks Software Development Lead
  • Jerry B. Ray, Jr. User Interface Design Lead
    will also develop prototype tool
  • Tonya M. Whaley Usability Testing Coordinator
  • Above personnel were all involved in the TMC
    simulator project and the ErgoTMC website

10
Plan for Tracking Comments
  • Use of change tracking in Microsoft Word
  • Will provide electronic versions of revised
    deliverables so that reviewer can see revisions
  • Will provide summary documentation of responses
    to comments in table format in the transmittal
    letter for the revised deliverable

11
Plan for Stakeholder Involvement
  • Expect project advisory board to consist of
  • TMC managers (will also participate in usability
    testing task)
  • Contractor personnel experienced in TMC
    operations
  • Individuals directly involved with development of
    Phase 1 material
  • Other individuals named by FHWA

12
Plan for Project Outreach
  • Project presentation
  • Issues/challenges in current practice
  • Purpose of project
  • Outcome and findings
  • Products developed
  • Intended audiences
  • Project fact sheet (draft to be provided)

13
Mechanisms for Technical Interchange
  • Teleconference Calls (monthly?)
  • Net Meetings (quarterly?)
  • VTC (?) if all parties have access
  • One major TIM at TFHRC