1
Airbag Automaton
  • John Bailey
  • Hattie Hiatt
  • Chun Hau Low
  • Jason Harwood
  • Wayne Gallup
  • Jason Canaday

2
Presentation Outline
  • Problem Definition
  • Customer Needs Summary
  • Project Breakdown
  • ME Subteam Designs
  • ECE Subteam Designs
  • How They Fit Together
  • Deliverables
  • Budget
  • Work Plan

3
Problem Definition
  • Problem Statement
  • Autoliv uses a variety of machines to fold and
    package their airbag. These machines take up
    space, capital, and require a new machine design
    for each new folding process.

4
Project Breakdown
  • Customer Needs
  • Plug and play machine that supports airbag
    folding processes
  • 1) SMED tool interface
  • 2) Move interface and tooling
  • 3) Central Hub that supports all operations of
    folding process

5
Tool Interface Concepts
  • Decision Criteria
  • Ease of use
  • In-house manufacturability
  • Cheaper alternative to existing robotic
    interfaces
  • Important Design Aspects
  • Auto connect/disconnect pneumatic connection
  • Rocking docking
  • Lock down mechanism

Design Inspiration
Top to Bottom Switch Step in Snowboard
Bindings Walther Tool Master Robotic Tool
Changer Techno-Sommer Robotic Tool
Changer Robotic Accessories Robotic Tool Changer
Applied Robotics in Use at Autoliv
6
Tool Interface Concepts
  • Functional Requirements
  • Docks tool to machine
  • User Locks/Unlocks tool manually
  • Hands-free connection of utilities
  • Senses secure connection
  • Design Criteria
  • Usability
  • Cost
  • SMED
  • Two Step Connection Procedure
  • Put on
  • Lock in

7
Slider Support Concept
  • Alternatives for Slider Support
  • Roller/Ball Bearings
  • Dovetail ways
  • Triangular ways
  • Closed cylindrical bushings

Slider support using open cylindrical bushings on
precision ground shafts
8
Hub Concept
  • Conceptual Design
  • Actuator attached to 12 Oclock arm
  • Pivot connection depends on arm design
  • Tilt connection mounted to Bobcat (base)

9
ME Budget
Item Cost
Linear Guides
Linear Bushings 200
Precision Shafts 500
Aluminum for brackets 50
Tool Interface
Manufacturing Materials 150
Power/Data/Pneumatic Connections (Male/Female) 500
Stainless Steel Rods 50
Hub
Pivot bushings 150
Steel for Pivot Axles 50
Various Fasteners 150
TOTAL COST 1800
10
Tool Positioning System
Requirements Control position of tool within
1/8th inch resolution Move tool to minimize
cycle time but stay within hardware
specifications
11
Hardware Components
  • Drive
  • Position Sensor
  • Controllers

12
Drive
13
Position Sensor
  • Requirements
  • Minimum velocity of 15 in/s (0.4 m/s)
  • Maximum 1/8th inch (3 mm) resolution
  • Measurement range of 600mm

Sensor Options
14
Controller
Currently researching -Programmable Logic
Controller -Microcontrollers
15
Tool Controller
  • Controls tool movements
  • Tool identification
  • Computer requests tool ID or
  • Tool sends ID at interface connect

16
ECE Budget
Drive 1200 Motor 1000 Controllers 15
0 Position Sensor 500 Cables 300 Other
Discrete Electronics 100___ Total 3250
17
Putting it all Together
18
Team Design Deliverables
  • SMED tool interface
  • Single arm assembly
  • Hub System
  • Accommodates 3 arms, Linak tilt system and
    routes utility cables
  • Tool identification system
  • Proof Of Concept tool recognition and automatic
    program download
  • Tool positioning control

19
Team Documentation Deliverables
  • Complete set of engineering drawings of custom
    parts and product information for manufactured
    parts
  • Repeatability testing
  • Failure and Fatigue analysis with predicted
    machine lifetime
  • Electrical circuit diagrams control models

20
AIRBAG AUTOMATON Design Schedule
21
AIRBAG AUTOMATONOverall Budget
ME Budget 1800
ECE Budget 3250
Miscellaneous Costs 400
Total Cost 5450