Transcript and Presenter's Notes

Title: more


1
moreWhy We Need to be Proactive
  • David F King
  • Deputy Chief Inspector of Air Accidents
  • Air Accidents Investigation Branch
  • United Kingdom
  • Measuring Safety Culture
  • a Maintenance Human Factors Perspective
  • 26th April 2004

2
BAC 1-11
3
BAC 1-11
4
Airbus A320
5
Boeing 737
6
Boeing 737
7
COMMON FEATURES
  • Night shift - Circadian lows - Much Maintenance
    at night.
  • Supervisors tackling long, hands-on involved
    tasks.
  • Interruptions.
  • Failure to use the Maintenance Manual - IPC
  • Confusing -misleading difficult manuals
  • Shift handovers - poor briefing - no detailed
    stage sheets
  • Time pressures
  • Staff shortages
  • Limited preplanning paperwork, equipment, spares
  • Determination to cope with all challenges.

8
Boeing 757 Nosewheel Axle failure
  • Birmingham to Malaga - uneventful landing.
  • Exit via rapid taxiway - 20kts vibration.
  • Aircraft stopped - passengers evacuated via
    steps.
  • Inspection - right nose wheel canted over -
  • Outer Bearing disintegrated.

9
Boeing 757 Nosewheel Axle failure
  • 1725hrs Operator informed - Duty Engineer
  • Right nosewheel bearing collapsed.
  • Telecon Commander
  • OK towed slowly - consequential damage? Axle
    change anyway!
  • Telecon contract maintenance company
  • Two engineers to go to Malaga -
  • no can do!

10
Boeing 757 Nosewheel Axle failure
  • Another co aircraft due take-off for Tangier
    1800hrs
  • Held for divertion malaga with wheels and change
    kit.
  • Certifying engineer (LAE) rings in - to check
    shifts!
  • Aircraft full of passengers - is he available?
  • Feeling tired been Flying microlight - Agrees to
    go.
  • 1730hrs Told he is going.
  • Duty Engineer copies extracts from AMM
  • Torque loading for wheel change
  • NOT Time Limits/Maintenance Checks - mandatory
    borescope inspection after bearing failure!

11
Boeing 757 Nosewheel Axle failure
  • 1815hrs LAE arrives at Airport
  • Asks for mechanic to go with him - Only one seat
    on aircraft!
  • 1825hrs Aircraft departs for Malaga
  • No opportunity for LAE to check AMM not one on
    aircraft.
  • Only authorised procedure for nosewheel axle -
  • repair by replacement.
  • 1830hrs Duty Eng told aircraft jacked
  • Wheel was off axle was not too bad.
  • 1900hrs Avionics Eng takes over as Duty Eng.
  • 2115hrs LAE arrived in Malaga

12
Boeing 757 Nosewheel Axle failure
  • 2115hrs LAE in Malaga - asked about length of
    delay?
  • Damaged wheel already loaded - unaccessible.
  • Saw bush and axle nut damaged - elected to
    re-use.
  • Identified axle damage
  • Between bearing lands - 11/2 long 1/16 deep.
  • Could see no bluing or overheat on outside of
    axle.
  • Decided aircraft OK return Birmingham after
    blending
  • Informed Duty Eng at Manchester.
  • Duty Eng concerned no repair limits in Manual.
  • Contacted Boeing 24 hr desk - go to AMM/provide
    sketch?

13
Boeing 757 Nosewheel Axle failure
  • LAE used torch in attempt to see inside axle
  • Could not see 7 as Borescope inspection
    required.
  • Missed evidence of overheating.
  • Blended damage
  • Using half round file and emery paper.
  • Did not raise ADD but regarded as temporary
    repair
  • no drawings or blend limits to work to - no
    blending allowed.
  • During inspection distracted
  • Tangier aircraft having refuelling problem -
    gave advice.
  • During blending distracted
  • Refuelling problem again - went to assist.

14
Boeing 757 Nosewheel Axle failure
  • LAE replaced right wheel without problem
  • Changed left hand wheel.
  • 2215hrs (1 hour after arrival Malaga)
  • Contacted Duty Eng
  • brief description of damage
  • Aircraft satisfactory for service
  • Axle change should be planned when schedule
    allowed.
  • 2259hrs Aircraft Took off.
  • 0121hrs Aircraft landed at Birmingham
  • Slowed to 12kt when axle failed.

15
Discolouration 400C
Region dressed since mechanical damage - before
fracture.
16
Fracture initiation in dressed region
17
COMMON FEATURES
  • Night shift - Circadian lows - Much Maintenance
    at night.
  • Supervisors tackling long, hands-on involved
    tasks.
  • Interruptions.
  • Failure to use the Maintenance Manual - IPC
  • Confusing -misleading difficult manuals
  • Shift handovers - poor briefing - no detailed
    stage sheets
  • Time pressures
  • Staff shortages
  • Limited preplanning paperwork, equipment, spares
  • Determination to cope with all challenges.

18
Thats All Folks
19
WINDSCREEN CHANGE
  • Short staffing - Night shift of 7 down by 2.
  • Shift Manager does job himself, alone.
  • A/C remote - took Manager away from his other
    duties.
  • Time pressures - AM shift short - aircraft to be
    washed.
  • Task between 0300-0500 hrs - time of Circadian
    lows.
  • Manager was on his 1st night work for 5 weeks.
  • MM only used to confirm Job straight forward.
  • IPC was not used - IPC was misleading.
  • The safety raiser used provided poor access.

20
WINDSCREEN CHANGE - SHIFT MANAGER
  • assumed bolts fitted OK - incorrect bolts 4 years
    before.
  • chose bolts by matching - stores below min stock
    level.
  • ignored advice of storeman on bolt size.
  • bolts from open AGS Carousel - faded labels -
    dark corner.
  • did not use his reading glasses at any time.
  • increased torque from 15 lb in to 20 lb in.
  • didnt notice excessive countersink or next
    window different.
  • didnt recognise different torque for corner
    fairing.
  • rationalised use of different bolts next night
    doing same job

21
FLAP CHANGE
  • LAE and team were new to the task.
  • LAE authorised but A320 rarely seen - 3rd party
    work.
  • Planning was a job card - 'change flap' some
    tooling.
  • Maintenance Manual in AMTOSS format.
  • Tooling deficient or incorrect - no collars for
    spoilers.
  • LAE requested experienced help - none available.
  • Other tasks during delays - changes in tasking.
  • Task worked in early hours - time of Circadian
    lows.
  • Tried task without disabling spoilers - couldn't
    do.
  • Spoilers disabled no collars/flags - deviation
    from MM.

22
FLAP CHANGE
  • Shift hand over verbal, paperwork incomplete -
    misunderstanding over spoilers.
  • Spoilers were pushed down during flap rigging.
  • Familiarity with Boeing aircraft where spoilers
    auto reset.
  • Flaps functioned - spoilers not - a deviation
    from the MM.
  • Duplicates were lead by day shift engineer.
  • Failure to follow Maintenance Manual.
  • During flight crew Walk round nothing amiss.
  • Pre-flight check, 3 seconds mismatch
    control/surface position required to generate
    warning.
  • Engineers demonstrated a willingness to work
    around problems without reference to design
    authority - including deviations from Maintenance
    Manual.

23
BORESCOPE INSPECTION
  • Inspections not in accordance with Task Cards or
    MM-
  • HP rotor drive covers not refitted.
  • Ground idle engine tests not
    conducted.
  • Tech Log wrongly signed
    completed as in MM
  • Work originally planned for Line, transferred to
    base.
  • Line and Base staff shortages - three Base
    supervisors.
  • Minimal preplanned paperwork - Line Maintenance.
  • To keep authorisation Base Controller did
    inspections.
  • A/C remote - took Controller away from other
    duties.

24
BORESCOPE INSPECTION
  • Line Engineer gave verbal handover to Base
    Controller.
  • Inadequate reference to Maintenance Manual.
  • Use of an unapproved reference source - school
    notes.
  • Poor lighting.
  • Many interruptions.
  • Early hours of morning - Circadian lows.
  • 9 previous occurrences.
  • Borescope Inspections routinely non procedural.
  • Quality Assurance system had not identified
    deviations.
  • Regulators monitoring had not corrected lapses.

25
  • Although many ingredients are demonstrated to
    have come together to create these incidents,
    what if some are there all the time?

Fatal Accidents
1
The Heinrich Ratio
Accidents
10
Reportable Incidents
30
Incidents
600
Tye/Pearson Bird