INTEGRATED SYNTHESIS OF PERMIAN BASIN DEPOSITIONAL HISTORY AND STRATIGRAPHIC ARCHITECTURE: DATA AND MODELS FOR RECOVERING EXISTING AND UNDISCOVERED OIL RESOURCES - PowerPoint PPT Presentation

1 / 24
About This Presentation
Title:

INTEGRATED SYNTHESIS OF PERMIAN BASIN DEPOSITIONAL HISTORY AND STRATIGRAPHIC ARCHITECTURE: DATA AND MODELS FOR RECOVERING EXISTING AND UNDISCOVERED OIL RESOURCES

Description:

Integrated data will form the basis for new engineering approaches and ... Permian Basin Petroleum ... 0.06 0.05 8.10 2.85 406.00 1.00 7132.00 7133.00 1 ... – PowerPoint PPT presentation

Number of Views:223
Avg rating:3.0/5.0

less

Transcript and Presenter's Notes

Title: INTEGRATED SYNTHESIS OF PERMIAN BASIN DEPOSITIONAL HISTORY AND STRATIGRAPHIC ARCHITECTURE: DATA AND MODELS FOR RECOVERING EXISTING AND UNDISCOVERED OIL RESOURCES


1
INTEGRATED SYNTHESIS OF PERMIAN BASIN
DEPOSITIONAL HISTORY AND STRATIGRAPHIC
ARCHITECTURE DATA AND MODELS FOR RECOVERING
EXISTING AND UNDISCOVERED OIL RESOURCES
PBSS
  • A NEW PERMIAN BASIN INITIATIVE
  • BY THE BUREAU OF ECONOMIC GEOLOGY

2
PROGRAM GOALS
  • Produce a detailed, comprehensive history of
    Paleozoic depositional and reservoir systems in
    the Permian Basin
  • Create spatially integrated data bases of
    depositional, stratigraphic, lithologic, and
    petrophysical properties

3
TARGET RESOURCES
  • Development Target 23 billion barrels of
    mobile oil remaining in existing reservoirs
  • Exploration Target 3.5 billion barrels of
    undiscovered oil and NGL resources

4
VALUE
  • Provide fundamental stratigraphic and
    reservoir-specific data in a readily accessible
    and useable format.
  • Integrated data will decrease the risk and
    increase the efficiency of exploitation
  • Integrated data will define new opportunities for
    drilling.
  • Integrated data will form the basis for new
    engineering approaches and completion practices

5
SOURCE DATA
  • Reservoir studies
  • Cores
  • Wireline logs
  • 3D 2D seismic
  • Outcrop studies
  • Published reports
  • Company data

6
DELIVERABLES
  • Text Written synthesis of history, stratigraphy,
    facies, structural history, and reservoir
    development in Permian Basin.
  • Data ARC/INFO GIS-based regional structure maps,
    facies maps, cross sections, core descriptions
    and data, outcrop descriptions and sections, core
    data, reservoir data, production data,
    publications, etc for each play.

7
TEXT
  • First-year report on depositional history and
    stratigraphy of the Cambrian-Permian
  • Incremental play reports as completed.

8
REGIONAL STRUCTURE MAPS
Woodford Structure
9
FACIES MAPS
10
REGIONAL CROSS-SECTIONS
  • Sequence stratigraphic framework
  • systems tracts
  • bounding surfaces/unconformities
  • Unit correlations
  • Facies correlations
  • Unit correlations
  • Facies correlations
  • Payzone continuity
  • Wireline attributes

11
OUTCROP MODELS
12
DEPOSITIONAL MODELS
13
RESERVOIR MODELS
14
CORE DESCRIPTIONS
15
CORE PHOTOGRAPHS
Ooid/skeletal Lime Grainstone
Separate Vug Porosity
Porosity 23.1 Permeability 17 md
16
CORE ANALYSIS DATA
17
RESERVOIR CROSS-SECTIONS
  • Cycle stratigraphic framework
  • Facies stacking patterns
  • Reservoir architecture
  • Payzone continuity
  • Wireline attributes

18
SEISMIC SECTIONS
NW
SE
Yates
Grayburg reservoir
Queen
Grayburg
Lowstand wedge
Glorieta platform margin
U San Andres
M
L
Clear Fork
19
PRODUCTION DATA
20
PUBLICATIONS
21
DATA DELIVERY FORMATS
  • Written summary reports on each play
  • Digital paper delivery
  • Digital data (GIS ARC-View)
  • CD format
  • Online web-based (ARC-IMS)

22
FUNDING
  • DOE
  • Industry Sponsorship
  • Bureau of Economic Geology Leveraging
  • RCRL
  • State of Texas
  • Other Possible Sources
  • University System
  • NSF
  • Desired Funding Level 1.5 - 2 million (3
    years)

23
BENEFITS OF SPONSORSHIP
  • Exclusive priority access to data products and
    deliverables for minimum of 1 year.
  • Access to data digitally as it becomes available.
  • Input as to focus and deliverables of project.
  • Direct access to project staff.
  • Attendance at annual project meetings.

24
PROJECT START DATE AND TERM
  • Expected Start November 1, 2004
  • Initial term 3 years
  • Continuation based on funding availability.
Write a Comment
User Comments (0)
About PowerShow.com