UK-Jlab-TechX Designs for the LHC Crab Cavity - PowerPoint PPT Presentation

About This Presentation
Title:

UK-Jlab-TechX Designs for the LHC Crab Cavity

Description:

... 35.00 7823.43 8637063.00 25916.81 0.01 0.80 3.31 9.06e-04 234.97 93.80 70.00 90.00 40.00 40.00 35.00 7836.52 8347000.00 25653.81 0.01 0.80 3.27 9.39e-04 237.38 ... – PowerPoint PPT presentation

Number of Views:26
Avg rating:3.0/5.0
Slides: 20
Provided by: bur82
Category:
Tags: lhc | techx | cavity | crab | designs | jlab

less

Transcript and Presenter's Notes

Title: UK-Jlab-TechX Designs for the LHC Crab Cavity


1
UK-Jlab-TechX Designs for the LHC Crab Cavity
  • Dr G Burt
  • Lancaster University / Cockcroft Institute

2
Cavity Design Team
  • G Burt (CI-Lancs)
  • B Hall (CI-Lancs)
  • J Smith (CI-Lancs)
  • P Goudket (CI-ASTeC)
  • P McIntosh (CI-ASTeC)
  • H Wang (JLab)
  • B Rimmer (JLab)
  • J Delayen (Jlab)
  • J Cary (Tech X)
  • P Stoltz (Tech X)
  • C Nieter (TechX)

3
Non-dominated optimisation
  • Optimisation is based on a non-dominated
    technique where optimal solutions lie on the
    Pareto front and sub-optimal solutions lie in
    front of it.

Simulation results
Pareto Front
100 mT _at_ 3 MV
Multipactor studies may change the optimal
solutions.
Pareto Front
4
Cavity Shape
Cavity was given a small angle on the wall to
simplify acid removal. The angle can be doubled
decreasing the equator rounding with little
effect on Bmax
Cavity Dimensions mm
Cavity Length 187.50
Beampipe Radii 90.00
Iris Curvature 45.00
Iris Radii 70.00
Equator Radii 230.00
Equator Curvature 40.00
Mag B plot
VT/cBmax 0.128 m 
VT/Emax 0.102 m
RT/Q 86.5 Ohms
The cavity is not squashed and relies on the
waveguide dampers to polarise the cavity.
5
Damping Scheme
Input Coupler
SOM and LOM Coupler
Vertical couplers only to meet the tight
horizontal space requirements.
HOM Damper
Waveguides are directly coupled to the cavities
to provide significant damping. The coupling
slots are placed at the field nulls of the
crabbing mode to avoid high fields.
6
Crabbing Mode
The crabbing mode is unaffected by the waveguide
dampers in the equator. This design has a lower
peak E field (29 MV/m) than the SLAC design and a
peak B field of half the BNL design (57 mT) at
6.6 MV/m. It does however have a lower R/Q.
Mag B plot
VT is in volts
freq (GHz) Q RT/Q VT/cBmax VT/Emax
0.800 2.11x106 78.68 0.145 0.088
0 mode is 4 MHz away and has a Q of 9x105. This
may be a problem.
7
SOM
Mag E plot
The SOM is at a frequency 17 MHz below the
crabbing mode.
freq (GHz) Q
0.7833 35.68
0.778 30.52
The SOM is very strongly damped.
8
LOM
Mag B plot
The LOM is effectively damped by the on-cell
waveguide coupler.
f (GHz) Q R/Q(0)
0.5867 311.5 15.2
0.5843 325.4 116.7
9
HOMs (monopole)
Mag B plot
f (GHz) Q R/Q(0)
1.214 6.066 1.44233
1.218 1078 1.30734
One of the monopole HOMs has a relatively high Q
but it has a small R/Q.
10
HOMs Dipole
Mag E plot
  • Horizontal
  • Vertical

freq (GHz) Q
0.932 149
0.989 296
freq (GHz) Q
0.921 2408
0.9663 125.6
Mag E plot
11
Modelling in VORPAL
Modelling in VORPAL has commenced and this will
be used for multipactor analysis (see Chets
talk).
12
Compact CC Constraints
  • Three key LHC constraints
  • Transverse beam-line separation (19 - 25 cm)
  • Bunch length 7.55 cm, 800 MHz ok (400 MHz
    preferred!)
  • Transverse beam size requires at least 10 cm
    aperture
  • Local crab crossing scheme preferred to avoid
    problems with collimation impedance issues.
  • Parallel RD for compact CCs along with
    elliptical cavity development.
  • Find best substitute for elliptical cavities
    among the several ideas.
  • Copper and/or Niobium prototype to test SRF
    features.

13
Initial Studies for a Compact CC
  • CEBAF separator cavity is
  • 499 MHz,
  • 2-cell, 8 rods
  • ? long
  • ?0.3 m diameter,
  • can produce 600kV deflecting voltage (on crest)
    with 1.5kW input RF power.
  • Qcu is only 5000 (structure wise), the stainless
    steel cylinder only takes less than 5 of total
    loss.
  • The maximum surface magnetic field at the rod
    ends is 8.2 mT.
  • Water cooling needed on the rods.
  • If Nb used for this type of cavity, the V? is ?
    KEKB CC.
  • Microphonics and fabrication issues to be
    resolved.

14
JLab Rod Cavity (SRF)
  • Use p mode for separating three beams in CEBAF.
  • Can a SRF version be made to work?
  • Need to reduce the surface magnetic field at the
    rod ends.
  • Need high B/E field near the beam path.
  • Using cone shape electrodes can certainly reduce
    rod vibration and microphonics.
  • Since there is a low loss on the cylinder can
  • could make cavity cylinder in low RRR Nb, with
    rods in high RRR Nb?
  • There are both magnetic and electric fields
    providing deflecting kick, E?? B?.
  • The cavity tuner is in low field region. No field
    enhancement there.
  • As rod separation increases, the Bx and Ey fields
    drop quickly.

15
Initial Modified 2-Rod Design
  • Modification of existing CEBAF 2-rod separator
    cavity (collaboration with H Wang at JLab)
  • Has 200 MHz and 400 MHz options,
  • Has a 10 cm diameter beampipe,
  • Has 40 cm diameter for both frequencies.
  • At 400 MHz, and V? 3 MV
  • single cell (length 30 cm)
  • R/Q 700 Ohms
  • Emax 90 MV/m
  • Bmax 120 mT

B fields
E fields
16
Solid Works Models
Peak fields were found to be in locations that
were hard to optimise in CST.
Solid works allows more complex shapes to be
constructed, avoiding sharp edges that occur in
CST.
17
Improved 2-rod design
  • Improved conical rod shape and removing sharp
    edges on the beampipe has achieved much lower
    surface fields.
  • We still have a lot of parameter space to cover
    for optimisation (may possibly use an
    evolutionary algorithm).
  • At 3 MV we now achieve
  • Emax40 MV/m
  • Bmax53 mT

18
Parallel Bar Cavity
Jean Delayens parallel bar structure could
potentially lead to much lower magnetic fields as
there are very low surface currents at the
beampipe. Current design has a field of 65 mT
when the cavity has a 3 MV transverse gradient
19
Cavity Prototype
  • UK have some funding for a cavity prototype.
  • UK and Jlab have significant expertise in cavity
    measurements and verification.
  • Beadpull and wire tests could be performed, as
    well as coupler verification and possibly even
    microphonic studies.
  • It is unclear if the funding will stretch to a
    Niobium cavity.
  • It is also undecided if the elliptical or compact
    cavity should be constructed. Will likely depend
    on results of the down select of elliptical
    cavities.
Write a Comment