WEL COME - PowerPoint PPT Presentation

1 / 35
About This Presentation
Title:

WEL COME

Description:

wel come musaid switch gear factory company ltd. p.o. box : 565 riyadh 11383 new industrial area al kharj road-riyadh-k.s.a telephone: 4984063/4981987 – PowerPoint PPT presentation

Number of Views:200
Avg rating:3.0/5.0
Slides: 36
Provided by: AMJADA
Category:
Tags: come | wel | welding

less

Transcript and Presenter's Notes

Title: WEL COME


1
WEL COME
  • MUSAID SWITCH GEAR FACTORY
  • COMPANY LTD.
  • P.O. BOX 565 RIYADH 11383
  • NEW INDUSTRIAL AREA
  • AL KHARJ ROAD-RIYADH-K.S.A
  • TELEPHONE 4984063/4981987
  • TELE FAX 4982491
  • E-MAIL MUSAIDFACTORY_at_YAHOO.COM

2
INTRODUCTION
3
(No Transcript)
4
(No Transcript)
5
(No Transcript)
6
COMMERCIAL CERTIFICATES AND LICENSES
7
(No Transcript)
8
(No Transcript)
9
(No Transcript)
10
(No Transcript)
11
CERTIFICATES OF COMPLIANCE
12
PLANTS AND MACHINERIES
13
(No Transcript)
14
(No Transcript)
15
B. BUS BAR FABRICATION MACHINES.
S.No. MACHINE DESCRIPTION QTY. MAKE
1. CNC (Programmable) Bus bar Fabrication Machine ,60 Tonnes (Multi Punch) 1 SUNRISE Korea
2. Programmable Hydraulic Bus bar Bending Machines (Multi Punch) 2 NAM SUNG Korea
3. Programmable Hydraulic Bus bar Bending Punching Machine (Multi Punch) 1 EUROMAC Korea
4. Hydraulic Bus bar Punching Press 5 NOVO PRESS Germany
5. Hydraulic Bus bar Cutting Press 2 NOVO PRESS Germany
6. Vertical Drilling Milling Machine (Upto 40 mm) 2 China
7. Vertical Drilling Milling Machine 2 LUNAN Continental Italy
16
C. SURFACE TREATMENT POWDER PAINT COATING
PLANT
S.No. MACHINE DESCRIPTION QTY. MAKE
1. Electric Powered Automatic Conveyer 122 Meter Length ( point load 80 kg, total load 4,500kg) 1 Intech Overseas India
2. Seven Tanks Process Sheet Treatment Plant (By Zinc Phosphastic Chemicals) With electric oven to dry the surface. 1 Intech Overseas India
3. Automatic Polyester Powder Coating Plant (With diesel burner, oven maintained temperature upto 180 Celsius). 1 Italy
4. Polyester Powder Thickness Tester. 1 ----
17
D. LOAD LIFTING FACILITIES.
S.No. MACHINE DESCRIPTION QTY. MAKE
1. Electric Powered Chain Hoist 5 Tonnes, 35 Meter Length 1 KURDONG Korea
2. Hydraulic Mobile Fork Lift 3 Tonnes 2 TOYOTA Japan
3. Trolley Jacks, 2 Tonnes 5 -----
E. TESTING EQUIPMENTS.
S.No. TESTING EQUIPMENTS QTY. MAKE
1. Load Bank for Direct Injection Test (Suitable Upto 600A) 1 CALTROLS Germany
2. AC High Voltage Insulation Tester 2.5 KV 1 SEW Standard
3. DC High Voltage Insulation Tester 1 KV DC 1 KYORITSU
4. AC Break Down Tester 4 KV 1 AVO
5. Mega Ohm Meter (Megger) Tester 1 HIOKI
6. Torque Wrench Tester 1 -----
18
PLANT SURVEY REPORT OF SCECO
19
(No Transcript)
20
SCECO PURCHASE ORDER
21
(No Transcript)
22
SOME PROJECTS AT A GLANCE
23
SOME LATEST COMPLETED PROJECTS DETAIL
S.No. MATERIAL DESCRIPTION PROJECT CLIENT CONTRACTOR
1. 13.8 KV PACKAGE SUBSTATIONS DISTRIBUTION PANEL BOARDS ABHA AIR PORT ROYAL PAVILLION EXTENSION MINISTRY OF DEFENCE (MODA) AL MABANI GEN.CONT.Co.
2. 13.8 KV PACKAGE SUBSTATIONS DISTRIBUTION PANEL BOARDS AL KHARJ AIR BASE MINISTRY OF DEFENCE (MODA AL MABANI GEN.CONT.Co.
3. 13.8 KV PACKAGE SUBSTATIONS DISTRIBUTION PANEL BOARDS YANBU AIR PORT MINISTRY OF DEFENCE (MODA) AL MABANI GEN. CONT. Co.
4. 13.8 KV PACKAGE SUBSTATIONS DISTRIBUTION PANEL BOARDS MADAEN SALEH AIR PORT (Under Construction) MINISTRY OF DEFENCE (MODA) AL MABANI GEN. CONT. Co.
5. 13.8 KV PACKAGE SUBSTATIONS DISTRIBUTION PANEL BOARDS AL KHARJ AIR BASE MINISTRY OF DEFENCE (MODA) AL MABANI GEN. CONT. Co.
6. 13.8 KV PACKAGE SUBSTATIONS DISTRIBUTION PANEL BOARDS NAJRAN AIR PORT (Under Construction) MINISTRY OF DEFENCE (MODA) AL MABANI CONT.Co.
7. 13.8 KV PACKAGE SUBSTATIONS DISTRIBUTION PANEL BOARDS GEANT PLAZA AL HOKAIR MALL FAWAZ AL HOKAIR GROUP AL HOKAIR CONT.Cos.
8. PANEL BOARDS, ATS PANELS CAPACITOR BANKS DAHRAN MALL FAWAZ AL HOKAIR GROUP AL HOKAIR CONT.Co.
9. PANEL BOARDS, ATS PANELS CAPACITOR BANKS HAFOUF MALL FAWAZ AL HOKAIR GROUP AL HOKAIR CONT.Co.
10. DISTRIBUTION PANEL BOARDS TABARJAL HOSPITAL MINISTRY OF HEALTH SETCO CONT. Co.
11. DISTRIBUTION PANEL BOARDS JIZAN POST OFFICE AL TERAIS CONT.Co.
12. DISTRIBUTION PANEL BOARDS POST OFFICE PROJECT AL FADIL EST.
13. DISTRIBUTION PANEL BOARDS PRIMARY HEALTH CARE CENTRERIYADH MINISTRY OF DEFENCE (MODA) AL MABANI GEN. CONT. Co.
14. DISTRIBUTION PANEL BOARDS AND MOTOR CONTROL CENTER PEACE SUN-9 DAHRAN AIR PORT PROJECT MODA RSAF BAUNST NEDAM
15. DISTRIBUTION PANEL BOARD ATS RSNF HEAD QUARTER BUILDING MODA RSNF RIYADH TEST CONT. Co.
24
16. STAR DELTA STARTER PANELS SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPNAY
17. AIR INSULATED BUS DUCT-4000A 90 METER LONG ABB ABB ABB
18. DISTRIBUTION PANEL BOARDS ATS PANELS CRCC- RIYADH SEC-CRB- RIYADH AL ARRAB CONT. Co.
19. AC/DC PANEL BOARDS DIFFERENT SUBSTATIONS SCECO- CENTRAL MEEDCO/ HYUNDAI Co.
20. AC/DC PANEL BOARDS DIFFERENT SUBSTATIONS SCECO- CENTRAL COGILEX ALSTOM
21. AC/DC PANEL BOARDS SUBSTATIONS 8760 SCECO- CENTRAL SIEMENS
22. 132 KV SUBSTATION LIGHTING PANEL BOARDS DIFFERENT SUBSTATIONS SEC-CRB- RIYADH AL BABTAIN CONT. Co.
23. 132 KV SUBSTATION LIGHTING PANEL BOARDS DIFFERENT SUBSTATIONS SEC-CRB- RIYADH AL KADI CONT. Co.
24. 132 KV SUBSTATION LIGHTING PANEL BOARDS DIFFERENT SUBSTATIONS SEC-CRB- RIYADH OSSAIS CONT. Co.
25. DISTRIBUTION PANEL BOARDS AL WASSIL TOWER RIYADH PRIVATE -----
26. DISTRIBUTION PANEL BOARDS RED EX TOWER AL DAFA Co. MOBCO
27. DISTRIBUTION PANEL BOARDS NATIONAL GUARD NATIONAL GUARD AL FOUZAN Co.
28. DISTRIBUTION PANEL BOARDS ZAKAT BUILDING MINISTRY OF FINANCE LAMEEC CONT. Co.
29. DISTRIBUTION PANEL BOARDS JEDDAH HILTON HOTEL HILTON HOTEL HAIF CONT. Co.
30. DISTRIBUTION PANEL BOARDS MADINAH HILTON HOTEL HILTON HOTEL HAIF CONT. Co.
31. DISTRIBUTION PANEL BOARDS GIRLS MEDICAL COLLEGE - RIYADH KING SAUD UNIVERSITY AL ZABAN CONT. Co.
32. DISTRIBUTION PANEL BOARDS CAPACITOR BANK LECTURE HALL BUILDING KING SAUD UNIVERSITY A JA CONT. Co.
33. DISTRIBUTION PANEL BOARDS CAPACITOR BANK PRINTING PRESS PROJECT KING SAUD UNIVERSITY A JA CONT. Co.
25
34. STREET LIGHTING SUBSTATIONS RIYADH MUNICIPALITY RIYADH MUNICIPALITY DIFFERENT CONTRACTORS
35. STREET LIGHTING SUBSTATIONS RIYADH RING ROAD MINISTRY OF TRANSPORT SHIBH AL JAZIRAH Co.
36. STREET LIGHTING SUBSTATIONS MAKKAH RIYADH HIGH WAY MINISTRY OF TRANSPORT SHIBH AL JAZIRAH Co.
37. DISTRIBUTION PANEL BOARDS AL UMAM CENTER UMAM COMMERCIAL MARKET AL FAYHA CONT.Co.
38. DISTRIBUTION PANEL BOARDS BOYS SCHOOL PROJECTS (Regular Business) MINISTRY OF EDUCATION DIFFERENT CONTRACTORS
39. DISTRIBUTION PANEL BOARDS GIRLS SCHOOL PROJECTS (Regular Business) MINISTRY OF EDUCATION DIFFERENT CONTRACTORS
40. DISTRIBUTION PANEL BOARDS SCHOOL UPGRATION PROJECTS (Regular Business) MINISTRY OF EDUCATION ABA HUSSAIN CONT. Co.
41. 13.8 KV PACKAGE SUBSTATIONS AL NAHDA ROAD PROJECT EXPANSION MINISTRY OF TRANSPORT ABA HUSSAIN CONT. Co.
26
TESTING PROCEDURE AND CERTIFICATES
27
TESTING PROCEDURE FOR PACKAGE SUBSTATIONS L.V
PANELS
Following testing procedure from our quality
control department of various factory tests are
being adopted in our factory before finally
dispatching the material. We classify our tests
in three sections. Which include the routine and
acceptance tests asper IEC 439 are as follows
1. Mechaical operation test. 2. Electrical
operation test. 3. Optional accessories test.
After primary stage wise quality inspection
during fabrication, our quality sources checks
the mechanical construction of panels,
Substations, or whatever is being tested, after
assembly asper approved drawings and material
lists from our client which includes visual
checking such as scratches of painting, welding
ends, joints positions of door, placing of
gaskets etc. also visual checking includes others
portions such as top and bottom plates, Position
of metering instruments, positions of main
circuit breaker cubicles, Locks, Keys, Nuts,
Bolts, torque test on busbars, suitable earthing
provision etc. checking of panel dimensions,
required quantity rating of breakers,
contactors or other required electrical
accessories installed, size of busbars according
to the requirement, busbar supporting insulators
according to breaking capacity also be checked
before electrical tests.
At second stage in electrical test includes
checking the easy operation of breakers,
contactors and other electrical accessories
according to the requirements without any
28
abnormalities. Bolt tightening torque of busbars
by torque wrench and in case of control circuit
the connection of each equipment and relays, the
tightness of wire connections in the terminals of
respective equipments are also be checked. The
connection to metering instruments. C.T.
connection, earth leakage relays, voltage relays,
phase relays and other control and monitoring
devices etc, are thoroughly checked asper single
line diagram or material list of drawing.
For insulation test we use meggers (500 V D.C.).
This test includes the insulation resistance
measurement between each phase (RY, RB BY) and
each phase and earth (RE, YE, BE) and from one
experience in most cases this value comes in mega
ohms showing higher insulation resistance.
Dielectric test or high voltage test be conducted
by using high voltage tester for getting high
voltage, this test is conducted by applying 2.5
KV voltage for one minute between each phase,
neutral and earth, to check any flash-over or
puncture with stand capacity of panels at high
voltages.
Injection test also will be perform to test the
real ampere rating of circuit breaker to make
sure the breaker should be trip at the breaker
rated current value.
Continuity test is to be performed by using
multimeter having sound monitors. During testing
the panels should not be energized from any
source and test be carried out on each equipment
and each full circuit, after making respective
equipments in on position.
29
Optional accessories test use to conduct for all
accessories such as motors, releasing coil,
relays before and after assembling these devices
inside the breakers and panels itself. Control
and monitoring relays and measuring instruments
are also checked before arranging these inside
the required panels.
All these visual inspections and electrical,
mechanical tests are performed in the presence of
any authorized person from client or consultant
side for that we inform them before testing
schedule and finally test certificate be issued
to the client, at the time of delivery together
with warranty letter.
- NOTHING FOLLOWS-
30
(No Transcript)
31
WARRANTY LETTERS
32
(No Transcript)
33
LOCATION MAPS
34
(No Transcript)
35
THANKS VISIT AGAIN
DESIGN BY AMJAD ALI KHAN
DIRECTION BY SYED TAUSIF SHAH
Write a Comment
User Comments (0)
About PowerShow.com