Act on IPPC in the CR - 1. January 2003. Act on IPPC in the CR ... a Company Environmental Plan /CEP/ for the selected pilot foundries. demonstration permits ... – PowerPoint PPT presentation

Number of Views:60
Avg rating:3.0/5.0
Slides: 41
Provided by: evaku
Category:

less

Transcript and Presenter's Notes

Title: Experience with an introduction of IPPC Directive in an AC IMPEL member country


1
Experience with an introduction of IPPC Directive
in an AC IMPEL member country
  • Czech Republic
  • Czech Enviromental Inspectorate

2
European CommunityCouncil Directive 96/61/EC on
IPPC24. 9. 1996
  • Czech Republic
  • Act No. 76/2002 Coll. on IPPC
  • 1. 3. 2002

3
Act on IPPC in the CR - 1. January 2003
4
Act on IPPC in the CR - 1. January 2003
  • Installations in operation 30. October 2007
  • New installations 1. March 2003
  • Integrated pollution register IPR
  • Agency of integrated prevention AIP
  • changes in 10 Czech Acts

5
35 days
  • What has been achieved so far?
  • applications and simulation decisions are ready
  • BREF translations
  • Agency of Integrated prevention
  • What is missing?
  • implementing law regulations
  • the list of authorized persons
  • people and financial sources in regions

6
IPPC
  • application of Best Available Techniques /BAT/
  • integrated permitting /in contradiction to
    sectoral permitting/
  • public access to information

7
System for Exchange of Information
  • EU
  • EC DG XI.
  • Forum
  • European IPPC Office
  • Technical Working Groups
  • CR
  • MoE
  • Czech IPPC Forum
  • Czech IPPC Office
  • Czech Working Group

8
Institutions of Czech exchange system
  • The National IPPC Forum
  • The National IPPC Office
  • National Working Groups

9
Institutions of state administration
  • Ministry of Environment
  • Ministry of Industry and Trade
  • Ministry of Agriculture
  • Ministry of Health
  • Regions
  • Czech Environmental Inspectorate
  • Regional Hygiene Officer

10
Procedure on granting an integrated permit
  • EIA
  • receiving of the application
  • to check all prescribed requirements
  • disclosure of the application to the public
  • statement of participation of other authorities
  • discussing the objections
  • final decision on the application

11
Permitting procedure- Preparing an application
of the integrated permit from a company
  • Summary of environmental aspects
  • Selection of important aspects and setting the
    final values of indicators
  • Analysis of production processes from the point
    of view of raw material and energy flows
  • Draft of possible solutions to prevent the
    origins of waste production and the sources
    pollution (BAT)
  • Evaluation of possibilities and suggestion of
    integrated solution in production technologies
  • Draft of end technologies in a case of prevention
    of the sources pollution wasnt achieved
  • Draft of the whole solution and the description
    of the emission monitoring

12
Permitting Procedure- Granting the Integrated
permit
  • The company submits the application
  • Disclosure of information about submission of the
    application
  • Evaluation of the suggested measures
  • Preparation of decision and discussion with the
    operator of the installation about permission
    requirements and about the best solution
  • Disclose the decision draft
  • Comments from the public
  • Granting the integrated permit, which includes
    justification of public comments

13
Operating the installation
  • monitoring and reporting
  • controls and disclosure of monitoring results
  • renewal of the integrated permit

14
Basic obligations of the operator of an
installation
  • to operate the installation in accordance with
    the integrated permit
  • to notify the Authority of a planned change in
    the installation
  • to cooperate with the relevant administrative
    authorities in controlling compliance with the
    conditions of the integrated permit
  • to notify the Authority without delay of all
    unusual situations, accidents at the installation
    and accidental releases of pollutants from the
    installation into the environment
  • keep records of information on compliance with
    the binding conditions for operation of the
    integrated permit
  • The operator of an installation must not operate
    the installation without an integrated permit

15
The Czech Environmental Inspectorate
  • inspect compliance with obligations laid down by
    this Act or the integrated permit
  • limit or stop the operation of an installation or
    its part, if its further operation would cause or
    could cause serious environmental damage or
    considerable material damage
  • impose fines
  • submit to the Region the results of a completed
    control, if this control reveals breach of
    obligations for which the Region imposes fines
  • evaluate applications of the best available
    techniques and submit
  • information on trends therein to the relevant
    administrative authorities
  • not participate on the procedure on granting an
    Integrated Permit
  • not perceive as an affected body of state
    administration.

16
Ministry of the Environment
  • execute supreme state supervision and shall be
    the central body of state administration
  • make decisions on applications for integrated
    permit for installations whose operations could
    significantly detrimentally affect the
    environment of an affected state
  • within its competence, evaluate the application
    of the best available techniques
  • submit the results of the evaluation of the best
    available techniques application to the
    administrative authorities and the relevant
    bodies of the European Communities
  • establish and maintain the integrated pollution
    register
  • provide methodical support in the area specified
    by this Act
  • fulfil tasks following from the relation to the
    European Communities in the area specified by
    this Act

17
Ministry of Industry and Trade
  • shall, within its competence, evaluate
    application of the best available techniques
  • 1.Energy industries
  • 2.Production and processing of metals
  • 3.Processing of minerals
  • 4.Chemical industry
  • 6.1.Industrial plants for production
  • 6.2.Plants for the pre-treatment or dyeing of
    fibres or textiles
  • 6.3.Plants for tanning of hides and skins
  • 6.7.Installations for the surface treatment of
    substances, objects or products using organic
    solvents
  • 6.8.Installations for the carbon production or
    electrographite by means of incineration or
    graphitization
  • shall ensure the system for exchange of
    information on the best
    available techniques

18
Ministry of Agriculture
  • shall, within its competence, evaluate
    application of the best available techniques
  • ? 6.4 a) Slaughterhouses with a car case
    production capacity greater than 50
  • tonnes per day
  • b) Treatment and processing installations
    intended for the production of food or feed
    products
  • c) Treatment and processing installations for
    milk with received quantity of milk exceeding 200
    tonnes per day
  • 6.5. Installations for the disposal or recycling
    of animal car cases and animal waste with a
    treatment capacity exceeding 10 tonnes per day
  • 6.6. Installations for intensive rearing of
    poultry or pigs

19
Regions
  • make decisions on application for an integrated
    permit with the exception of installations whose
    operation could significantly detrimentally
    affect environment of an affected state - these
    decisions makes the MoE
  • carry out control of an integrated permit or
    operation of an installation
  • impose fines request the operator of an
    installation to submit an application for
    granting an integrated permit
  • evaluate application of the best available
    techniques and submit information on their
    development to the relevant administrative
    authorities

20
Regional Hygiene Officer
  • in procedures on granting an integrated permit,
    the officer shall lay down the binding conditions
    for operation of a source of noise or vibrations
    if the hygiene limits cannot be met
  • from the standpoint of protection of the public
    health, the officer shall check the integrated
    permit or operation of the installation
  • the hygiene officer shall limit or terminate the
    operation of an installation or its part, if
    further its operation would or could cause
    serious damage to human health
  • the officer shall impose fines

21
Participants in the Procedure
  • the operator of the installation
  • the municipality, in whose territory the
    installation is or is to be located
  • the region, in whose territory the installation
    is or to be located
  • - civic associations
  • public benefit societies
  • federations of employers or chamber of commerce
  • municipalities

22
Participation of the Authorized person
  • statement on application
  • by other Authorised person
  • by the Agency of Integrated Prevention
  • within 5 days
  • within 75 days
  • disclosure for a period of 30 days

23
Oral Discussion of the Application
  • Decision on the Application
  • - within 45 days
  • - prolongation 45 days

24
Application for granting an Integrated Permit
  • identification of operator of an installation
  • description of the installation and related
    activities
  • description of raw materials and preparations,
    related materials and energy
  • emission sources from the installation
  • characterization of the place where the
    installation should be located
  • description of emissions amount from the
    installation in water, air, soil
  • description of technologies which prevent the
    emission formation and reduce them
  • description of measures that prevent waste
    production or serve to the use of waste produced
    by installation
  • localization and types of emission monitoring is
    needed
  • characterization of measuring instruments
  • supplements

25
Pilot project system
  • ? preparation of Regions for the Integrated
    Permit granting according to the IPPC directive
    requirements
  • ? to prepare workshops for the clerks from the
    Regions who are responsible for issuing permits
  • ? to create a flexible system of BREF documents
    and other BAT sources
  • ? to support MoE in establishing and of to
    educate personal about related issues
  • ? to support the Czech working group in
    monitoring
  • ? to prepare documents

26
Institutional strengthening of the Czech
Environmental Inspectorate Implementation of
the IPPC Directive
27
Institucional strengthening of the Czech
Environmental Inspectorate Implementation of
the IPPC Directive
  • Introduction of permitting according to the
    EU-IPPC Directive in selected pilot metal
    foundries in the Czech republic
  • Institutional strengthening of the Czech
    Environmental Inspectorate /CEI/
  • Improvement of smog monitoring and control in
    the surroundings of 2 metallurgical companies in
    Ostrava

28
Institucional strengthening of the Czech
Environmental Inspectorate Implementation of
the IPPC Directive
  • Outputs
  • an agreement between the Czech government and the
    Czech foundry sector on a future emissions value
    framework
  • a Company Environmental Plan /CEP/ for the
    selected pilot foundries
  • demonstration permits
  • a database and documentation centre on clean
    technology and BAT in the foundry sector
  • 2 seminars on IPPC, BAT, self/regulation and
    integration
  • a work plan for the CEI regarding implementation
    of IPPC
  • a seminar on clean production
  • 3 study visits of stakeholders to meet colleague
    organisations in the Netherlands
  • installation of additional hardware and software
    to improve smog monitoring

29
Institucional strengthening of the Czech
Environmental Inspectorate Implementation of
the IPPC Directive
  • project manager - DHV in the Netherlands
  • deputy project manager - DHV CR
  • air quality management expert - DHV in the
    Netherlands
  • environmental expert - DHV CR
  • Environmental Department of Dutch environmental
    permitting body
  • Dutch steel mill
  • The Netherlands Environmental Inspectorate
  • Czech Environmental Inspectorate
  • Ministry of Environment
  • Ministry of Industry and Trade
  • Ministry of Regional Development
  • selected pilot foundries
  • Czech Foundry Union
  • steel mills involved
  • NGOs STUZ

30
Institucional strengthening of the Czech
Environmental Inspectorate Implementation of
the IPPC Directive
  • smog monitoring equipment track
  • permitting track
  • application format
  • preparation of application
  • IPPC permit
  • study visit to the Netherlands
  • Dutch Foundry Union
  • permitting authorities
  • Environmental inspectorate
  • companies

31
The pilot IPPC project in paper industry
enterprise (paper mill)
  • Simulation Game 2000 2001
  • The Frantschach Pulp Paper, a.s.
  • Sweden 1969

32
The pilot IPPC project in paper industry
enterprise (paper mill)
  • Environmental Management System
  • EN ISO 14001
  • to increase using of renewable energy sources
  • to reduce the water consumption
  • to reduce the waste water burden
  • to limit the origins of underground water
    contamination
  • to meet the emission limits for air and water

33
The pilot IPPC project in paper industry
enterprise (paper mill)
  • VIII/2000 Elaborating the integrated permit
    application form
  • IX X/2000 Elaborating and handing in the
    Frantschach's integrated permit application
  • 8. 9. 11. 2000 Discussing the application
  • 8. 12. 2000 Written comments of the authorities
    on the completed application
  • 15. 2. 2001 Elaborating the standpoints of the
    authorities, NGOs and the public on the completed
    application
  • 20. - 22. 3. 2001 Public hearing

34
The pilot IPPC project in paper industry
enterprise (paper mill)
  • Ministry of Environment
  • Czech Environmental Inspectorate
  • District Hygiene Station
  • District Office
  • Municipal Office
  • Centre For a Cleaner Production
  • Society for Sustainable Living
  • Swedish Agency For Environment
  • Swedish Environmental Court

35
The pilot IPPC project in paper industry
enterprise (paper mill)
  • BAT - 90
  • public hearing on the application
  • process of integrated permit granting
  • administrative management
  • ? applicants
  • ? permit granting authorities

36
The Chicken Farming
  • 6.6. Installation for the intensive rearing of
    poultry or pigs with more than 40 000 places for
    poultry
  • Capacity 609 000 places
  • The model discussion of the application
  • Integrated permit 31 . March 2003

37
The Chicken Farming
  • Czech Inspection of Environment
  • Regional Hygienic Officer
  • NGOs - Children of the Earth
  • vets
  • relevant administrative authorities
  • comments
  • problem - Integrated Permit
  • more operators
  • one operator

38
internet
  • IPPC
  • http//www.env.cz
  • http//www.cizp.cz
  • http//www.ceu.cz
  • http//www.ceu.cz/IPPC/Podniky/Default.htm
  • http//www.ceu.cz/IPPC/Podniky/Formular.htm

39
THANK YOU
  • for your attention

40
IPPC Installations in the Czech Republic
Write a Comment
User Comments (0)
About PowerShow.com