2European CommunityCouncil Directive 96/61/EC on
IPPC24. 9. 1996
- Czech Republic
- Act No. 76/2002 Coll. on IPPC
- 1. 3. 2002
3Act on IPPC in the CR - 1. January 2003
4Act on IPPC in the CR - 1. January 2003
- Installations in operation 30. October 2007
- New installations 1. March 2003
- Integrated pollution register IPR
- Agency of integrated prevention AIP
- changes in 10 Czech Acts
535 days
- What has been achieved so far?
- applications and simulation decisions are ready
- BREF translations
- Agency of Integrated prevention
- What is missing?
- implementing law regulations
- the list of authorized persons
- people and financial sources in regions
6IPPC
- application of Best Available Techniques /BAT/
- integrated permitting /in contradiction to
sectoral permitting/ - public access to information
7System for Exchange of Information
- EU
- EC DG XI.
- Forum
- European IPPC Office
- Technical Working Groups
- CR
- MoE
- Czech IPPC Forum
- Czech IPPC Office
- Czech Working Group
8Institutions of Czech exchange system
- The National IPPC Forum
- The National IPPC Office
- National Working Groups
9Institutions of state administration
- Ministry of Environment
- Ministry of Industry and Trade
- Ministry of Agriculture
- Ministry of Health
- Regions
- Czech Environmental Inspectorate
- Regional Hygiene Officer
10Procedure on granting an integrated permit
- EIA
- receiving of the application
- to check all prescribed requirements
- disclosure of the application to the public
- statement of participation of other authorities
- discussing the objections
- final decision on the application
11Permitting procedure- Preparing an application
of the integrated permit from a company
- Summary of environmental aspects
- Selection of important aspects and setting the
final values of indicators - Analysis of production processes from the point
of view of raw material and energy flows - Draft of possible solutions to prevent the
origins of waste production and the sources
pollution (BAT) - Evaluation of possibilities and suggestion of
integrated solution in production technologies - Draft of end technologies in a case of prevention
of the sources pollution wasnt achieved - Draft of the whole solution and the description
of the emission monitoring
12Permitting Procedure- Granting the Integrated
permit
- The company submits the application
- Disclosure of information about submission of the
application - Evaluation of the suggested measures
- Preparation of decision and discussion with the
operator of the installation about permission
requirements and about the best solution - Disclose the decision draft
- Comments from the public
- Granting the integrated permit, which includes
justification of public comments
13Operating the installation
- monitoring and reporting
- controls and disclosure of monitoring results
- renewal of the integrated permit
14Basic obligations of the operator of an
installation
- to operate the installation in accordance with
the integrated permit - to notify the Authority of a planned change in
the installation - to cooperate with the relevant administrative
authorities in controlling compliance with the
conditions of the integrated permit - to notify the Authority without delay of all
unusual situations, accidents at the installation
and accidental releases of pollutants from the
installation into the environment - keep records of information on compliance with
the binding conditions for operation of the
integrated permit -
- The operator of an installation must not operate
the installation without an integrated permit
15The Czech Environmental Inspectorate
- inspect compliance with obligations laid down by
this Act or the integrated permit - limit or stop the operation of an installation or
its part, if its further operation would cause or
could cause serious environmental damage or
considerable material damage - impose fines
- submit to the Region the results of a completed
control, if this control reveals breach of
obligations for which the Region imposes fines - evaluate applications of the best available
techniques and submit - information on trends therein to the relevant
administrative authorities - not participate on the procedure on granting an
Integrated Permit - not perceive as an affected body of state
administration.
16Ministry of the Environment
- execute supreme state supervision and shall be
the central body of state administration - make decisions on applications for integrated
permit for installations whose operations could
significantly detrimentally affect the
environment of an affected state - within its competence, evaluate the application
of the best available techniques - submit the results of the evaluation of the best
available techniques application to the
administrative authorities and the relevant
bodies of the European Communities - establish and maintain the integrated pollution
register - provide methodical support in the area specified
by this Act - fulfil tasks following from the relation to the
European Communities in the area specified by
this Act
17Ministry of Industry and Trade
- shall, within its competence, evaluate
application of the best available techniques - 1.Energy industries
- 2.Production and processing of metals
- 3.Processing of minerals
- 4.Chemical industry
- 6.1.Industrial plants for production
- 6.2.Plants for the pre-treatment or dyeing of
fibres or textiles - 6.3.Plants for tanning of hides and skins
- 6.7.Installations for the surface treatment of
substances, objects or products using organic
solvents - 6.8.Installations for the carbon production or
electrographite by means of incineration or
graphitization - shall ensure the system for exchange of
information on the best
available techniques
18Ministry of Agriculture
- shall, within its competence, evaluate
application of the best available techniques - ? 6.4 a) Slaughterhouses with a car case
production capacity greater than 50
- tonnes per day
- b) Treatment and processing installations
intended for the production of food or feed
products - c) Treatment and processing installations for
milk with received quantity of milk exceeding 200
tonnes per day - 6.5. Installations for the disposal or recycling
of animal car cases and animal waste with a
treatment capacity exceeding 10 tonnes per day - 6.6. Installations for intensive rearing of
poultry or pigs
19Regions
- make decisions on application for an integrated
permit with the exception of installations whose
operation could significantly detrimentally
affect environment of an affected state - these
decisions makes the MoE - carry out control of an integrated permit or
operation of an installation - impose fines request the operator of an
installation to submit an application for
granting an integrated permit - evaluate application of the best available
techniques and submit information on their
development to the relevant administrative
authorities
20Regional Hygiene Officer
- in procedures on granting an integrated permit,
the officer shall lay down the binding conditions
for operation of a source of noise or vibrations
if the hygiene limits cannot be met - from the standpoint of protection of the public
health, the officer shall check the integrated
permit or operation of the installation - the hygiene officer shall limit or terminate the
operation of an installation or its part, if
further its operation would or could cause
serious damage to human health - the officer shall impose fines
21Participants in the Procedure
- the operator of the installation
- the municipality, in whose territory the
installation is or is to be located - the region, in whose territory the installation
is or to be located - - civic associations
- public benefit societies
- federations of employers or chamber of commerce
- municipalities
22Participation of the Authorized person
- statement on application
- by other Authorised person
- by the Agency of Integrated Prevention
- within 5 days
- within 75 days
- disclosure for a period of 30 days
23Oral Discussion of the Application
- Decision on the Application
- - within 45 days
- - prolongation 45 days
24Application for granting an Integrated Permit
- identification of operator of an installation
- description of the installation and related
activities - description of raw materials and preparations,
related materials and energy - emission sources from the installation
- characterization of the place where the
installation should be located - description of emissions amount from the
installation in water, air, soil - description of technologies which prevent the
emission formation and reduce them - description of measures that prevent waste
production or serve to the use of waste produced
by installation - localization and types of emission monitoring is
needed - characterization of measuring instruments
- supplements
25Pilot project system
- ? preparation of Regions for the Integrated
Permit granting according to the IPPC directive
requirements - ? to prepare workshops for the clerks from the
Regions who are responsible for issuing permits - ? to create a flexible system of BREF documents
and other BAT sources - ? to support MoE in establishing and of to
educate personal about related issues - ? to support the Czech working group in
monitoring - ? to prepare documents
26Institutional strengthening of the Czech
Environmental Inspectorate Implementation of
the IPPC Directive
27Institucional strengthening of the Czech
Environmental Inspectorate Implementation of
the IPPC Directive
- Introduction of permitting according to the
EU-IPPC Directive in selected pilot metal
foundries in the Czech republic - Institutional strengthening of the Czech
Environmental Inspectorate /CEI/ - Improvement of smog monitoring and control in
the surroundings of 2 metallurgical companies in
Ostrava
28Institucional strengthening of the Czech
Environmental Inspectorate Implementation of
the IPPC Directive
- Outputs
- an agreement between the Czech government and the
Czech foundry sector on a future emissions value
framework - a Company Environmental Plan /CEP/ for the
selected pilot foundries - demonstration permits
- a database and documentation centre on clean
technology and BAT in the foundry sector - 2 seminars on IPPC, BAT, self/regulation and
integration - a work plan for the CEI regarding implementation
of IPPC - a seminar on clean production
- 3 study visits of stakeholders to meet colleague
organisations in the Netherlands - installation of additional hardware and software
to improve smog monitoring
29Institucional strengthening of the Czech
Environmental Inspectorate Implementation of
the IPPC Directive
- project manager - DHV in the Netherlands
- deputy project manager - DHV CR
- air quality management expert - DHV in the
Netherlands - environmental expert - DHV CR
- Environmental Department of Dutch environmental
permitting body - Dutch steel mill
- The Netherlands Environmental Inspectorate
- Czech Environmental Inspectorate
- Ministry of Environment
- Ministry of Industry and Trade
- Ministry of Regional Development
- selected pilot foundries
- Czech Foundry Union
- steel mills involved
- NGOs STUZ
30Institucional strengthening of the Czech
Environmental Inspectorate Implementation of
the IPPC Directive
- smog monitoring equipment track
- permitting track
- application format
- preparation of application
- IPPC permit
- study visit to the Netherlands
- Dutch Foundry Union
- permitting authorities
- Environmental inspectorate
- companies
31The pilot IPPC project in paper industry
enterprise (paper mill)
- Simulation Game 2000 2001
- The Frantschach Pulp Paper, a.s.
- Sweden 1969
32The pilot IPPC project in paper industry
enterprise (paper mill)
- Environmental Management System
- EN ISO 14001
- to increase using of renewable energy sources
- to reduce the water consumption
- to reduce the waste water burden
- to limit the origins of underground water
contamination - to meet the emission limits for air and water
33The pilot IPPC project in paper industry
enterprise (paper mill)
- VIII/2000 Elaborating the integrated permit
application form - IX X/2000 Elaborating and handing in the
Frantschach's integrated permit application - 8. 9. 11. 2000 Discussing the application
- 8. 12. 2000 Written comments of the authorities
on the completed application - 15. 2. 2001 Elaborating the standpoints of the
authorities, NGOs and the public on the completed
application - 20. - 22. 3. 2001 Public hearing
34The pilot IPPC project in paper industry
enterprise (paper mill)
- Ministry of Environment
- Czech Environmental Inspectorate
- District Hygiene Station
- District Office
- Municipal Office
- Centre For a Cleaner Production
- Society for Sustainable Living
- Swedish Agency For Environment
- Swedish Environmental Court
35The pilot IPPC project in paper industry
enterprise (paper mill)
- BAT - 90
- public hearing on the application
- process of integrated permit granting
- administrative management
- ? applicants
- ? permit granting authorities
36The Chicken Farming
- 6.6. Installation for the intensive rearing of
poultry or pigs with more than 40 000 places for
poultry - Capacity 609 000 places
- The model discussion of the application
- Integrated permit 31 . March 2003
37The Chicken Farming
- Czech Inspection of Environment
- Regional Hygienic Officer
- NGOs - Children of the Earth
- vets
- relevant administrative authorities
- comments
- problem - Integrated Permit
- more operators
- one operator
38internet
- IPPC
- http//www.env.cz
- http//www.cizp.cz
- http//www.ceu.cz
- http//www.ceu.cz/IPPC/Podniky/Default.htm
- http//www.ceu.cz/IPPC/Podniky/Formular.htm
39THANK YOU
40IPPC Installations in the Czech Republic