Department Heads Meeting - PowerPoint PPT Presentation

About This Presentation
Title:

Department Heads Meeting

Description:

Next steps for Work Planning and Control. Identify training requirements and potential 'yellow' or ' ... Bump-bonding machine for 3-d silicon sensor development ... – PowerPoint PPT presentation

Number of Views:26
Avg rating:3.0/5.0
Slides: 13
Provided by: ncr5
Category:

less

Transcript and Presenter's Notes

Title: Department Heads Meeting


1
Department Heads Meeting
  • Steve Kahn David MacFarlane
  • April 16, 2009

2
Agenda items
  • News and updates
  • Next steps for Work Planning and Control
  • Identify training requirements and potential
    yellow or red activities in PPA
  • Reminder about vehicle safety and accident
    reporting
  • Next steps on implementing R2A2s
  • Need to complete PPA R2A2s by May 15

3
Budget and news from DOE
  • Financial Plan for FY2009 updated received April
    6th from DOE following passage of the omnibus
    bill
  • Overall HEP budget as expected (87.5M FACET)
    most BR code changes implemented as agreed at
    March 3 annual budget meeting
  • Exceptions are 1M less for ATLAS (KA11), where
    planned increase is partially implemented pending
    the proton research review, and 500k for LSST
    (KA13) difference parked in detector operations
  • Review of BABAR PEP-II DD plans was held on
    March 23-24
  • BABAR DD plans endorsed with recommendation to
    strengthen project performance and budget
    controls
  • Various scenarios were presented for PEP-II, but
    reviewers concluded no urgent actions are
    required before end of 2010, pending resolution
    of re-use opportunities
  • Reviewers were impressed by progress and plans on
    relief from the metals suspension
  • Comparative reviews of programs at 5 DOE HEP labs
  • June 8-12 for proton-accelerator based research,
    including Tevatron, LHC (SLAC/ATLAS program), and
    accelerator-based neutrino programs
  • July 10-12 for Detector RD program

4
Budget and news from DOE
  • Twelve requests submitted April 6th in response
    to OHEP call for supplemental funding proposals
  1. ATLAS CSC ROD support
  2. Work on SuperB accelerator TDR
  3. RD for fast timing measurements
  4. Supplement for pre-engineering development on
    LSST camera
  5. Exploratory development of role on Super CDMS and
    GeODM
  6. Red cluster replacement for computational
    cosmology
  7. Renovations for Theory Group move to the ROB
  8. TT60 collimator high radiation test facility
  9. X-band rf source development
  10. Bump-bonding machine for 3-d silicon sensor
    development
  11. Development and construction of the End Station
    Test Beam (ESTB)
  12. InSpires development

5
Other PPA news
  • PPA and PPA Faculty are proceeding with
    implementing the staff development plan
  • First group of staff scientists was approached to
    provide material for developing the case for
    promotion to senior or distinguished staff
    scientist
  • Three ad hoc promotion review committees have
    been gathering letters of recommendation and
    first discussions of individual cases are
    beginning
  • FY2010 LDRD program call for proposals
  • Funded by about 2.5 tax against lab budgets
  • Proposals reviewed on yearly basis but can be
    funded for no more than 3 years
  • Meant to support new ideas and strategic
    directions for the laboratory
  • PPA proposals to be submitted to Debbie Tryforos
    by April 24th
  • SPC meeting upcoming on May 1-2
  • PPA presentations on accelerator strategy, ATLAS
    and Fermi science

6
Vehicle damage events
7
Breakdown of cause
8
Breakdown by Directorate
9
Actions in response
Action Who When
Discuss the vehicle damage history with employees that persons operating a government vehicle must Have the skills to operate the vehicle Visually inspect vehicles to ensure safe operation and take malfunctioning vehicles to Fleet Services for maintenance and repair (already in policy) Visually inspect the exterior of the vehicle (360-degree inspection) for any physical damage to the vehicle. If the damage is not already recorded in the vehicle log, such damage must be reported to the vehicle custodian prior to operation of the vehicle. Deliberately inspect surroundings for potential hazards prior to putting the vehicle in motion, and at all times while operating a vehicle, including stationary objects Notify management when vehicles require major repair or modification Immediately notify SLAC Site Security if a government-owned vehicle is damaged or involved in an accident ALDs 4/30/09
10
Status of R2A2 implementation
  • Completion of R2A2s is a SLAC-wide milestone
    built into the PEMP for FY2009
  • PPA has committed to complete all R2A2s by May 15
  • We have been working towards the use of
    individual R2A2s captured as a Job Summary and
    generic R2A2s
  • Has the virtue of focusing in on the specific,
    thereby making the preparation both a simpler and
    more manageable task
  • Leads to greater uniformity in understanding the
    broad set of R2A2 expectations
  • Two example sets are now available
  • Fermi ISOC as an organization, from Department
    Head to individual staff level
  • PPA Department Heads as a group (partially
    complete)

11
Plan from now to May 15
  • Extending these examples to the rest of PPA
  • Departments Heads are requested to work down
    their organizations to produce draft Job
    Summaries for all staff
  • Exclude RAs and graduate students, who are
    reviewed as part of the academic process
  • Exclude PPA Faculty, except in their role as a
    line manager
  • Due date for draft job summaries is Friday, May 1
  • Division Heads will have at best a short period
    to review the resulting department packages,
    provide feedback, and iterate for final set of
    Job Summaries by the hard deadline of May 15
  • Administrative support provided by Kathy Webb
  • Performance reviews
  • Format under discussion, but expect that the job
    summaries will be the basis of future assessment

12
Available examples
  • Department Heads
  • See for example Rob Cameron (Fermi ISOC), Marty
    Breidenbach (EXO SiD), Blair Ratcliff
    (BABAR/SuperB)
  • Supervisor
  • See for example Ric Claus (Fermi ISOC/ATLAS)
  • Staff scientist
  • See for example Tom Glanzman (Fermi ISOC) or Jim
    Panetta (Fermi ISOC/ATLAS)
  • Cases involving multiple projects
  • Job summary will have R2A2s related to different
    functions, that should be worked up with the
    appropriate functional supervisors
  • Administrative supervisor should take overall
    responsibility for coordinating with functional
    supervisors both administrative and functional
    supervisors need to sign-off on job summary

https//www-internal.slac.stanford.edu/ppa/interna
lDocs/R2A2List.htm
Write a Comment
User Comments (0)
About PowerShow.com