Title: Orbital November 7


1
Science Working Team (SWT)
Mission Operations Status Dean Hawes
OrbitalNovember 7 8, 2007
2
Our Spacecraft
3
Mission Operations Org-Chart
4
Ground Segment Architecture
5
IBEX Ground SystemFunctional Elements and
Interfaces
CMDs Table Loads
Ground Network Universal Space Network (USN)
TLM Playback Data
Raw Science Data S/C SOH TLM Back Orbit TLM
S/C P/L Commands Table Loads
Pass Coverage Requests
USN Remote Tracking Station (RTS)
IBEX Science Operations Center (ISOC)
Mission Operations Center (MOC)
STF, ATS Load Confirm
  • MAESTRO/On-Line
  • Real Time Command And Telemetry
  • Ground Equipment Configuration
  • Archive And Analysis (Short Term)
  • Mission Planning System
  • Constraints Checking
  • Schedule Generation
  • Spin Axis Pointing
  • Generate Rotes

Real Time telemetry
Science Data
Playback Data and Files
  • MAESTRO S/C Data Analysis
  • Data Review
  • Trend Analysis
  • Performance Evaluation

Planning Files and Data
  • Archive
  • Long Term

Flight Dynamics Group (FDG)
Tracking Data Relay Satellite System (TDRSS)
  • Flight Dynamics Orbit Determination
  • Orbit Determination
  • Ephemeris Generation
  • Thruster Calibration
  • Orbit Maneuver Verification

S/C SOH TLM CMDS
NASA Closed Network
6
Ground Segment Development
7
Status of Facilities
  • MOC 3 Is Now Assigned As The Ground Station For
    IBEX
  • Both long term operations (LTO) launch early
    operations (LEOPs)
  • Original plan called for MOC 1 or MOC 2 for LEOPs
  • Changes in GEO launch schedules created conflicts
    with IBEX schedule
  • Addition of MOC 3 de-conflicts IBEX from other
    programs
  • MOC 3 Integration
  • LTO side is now being configured
  • IBEX program asset
  • LTO MOC testing from 11/13/07 to 1/04/08
  • Components and furniture for LEOPS side are now
    in procurement
  • Orbital capital asset
  • LEOPs MOC testing from 1/17/08 to 2/12/08
  • Back Up MOC
  • Back up MOC is a laptop that can be transported
    to USNs facility should the MOC at Orbital go
    off-line for any reason
  • Laptop is in-house
  • MAESTRO application is loaded

8
MOC 3 Schedule
9
Long Term Operation Center
  • Located in Building 2
  • Room is divided into two halfs
  • MOC 3 - LEOPS (Not shown)
  • MOC 3 - LTOC
  • LEO Programs
  • Dawn
  • IBEX
  • Each Program receives a horse shoe console for
    Daily Satellite Activities
  • IBEX Console contains
  • Mission Planning System (MPS)
  • Primary Commanding String (CMD1)
  • Backup Commanding String (CMD2)
  • NASA Commanding String (CMD1)

10
MOC Network Connectivity
MOC 3
Closed
Open
11
MOC Equipment Status
  • MOC Workstations Computers
  • V240 servers are ready
  • Network equipment is in
  • User interface PCs are in procurement
  • Mission Planning System
  • Computer is in, and the MPS core software is now
    loaded
  • Balance of MPS software due in January
  • Have successfully completed STF interface tests
    with ISOC
  • Secure FTP Server
  • Server has been delivered
  • Configuration is progressing
  • VPN Network
  • Components are in-house
  • Configuration is progressing
  • Furniture And Fixtures
  • In procurement
  • Due in December

12
LTO MOC Server Configuration
  • Open Network (USN)
  • Two synchronized V240 servers
    (Primary Backup)
  • PC with dual displays connected to each server
    provides the user interface
  • Both servers are synced to the archives
  • Closed Network (NASA)
  • TDRSS interface
  • Single V240 server
  • PC with dual displays connected to the server
    provides the user interface
  • Server has a local archive

13
Ground Segment Status
  • MAESTRO
  • Current revision is at M009CF4R1
  • Used throughout spacecraft CPT 2
  • Loaded onto ground station machines
  • MAESTRO validation test mid-November
  • Mission Planning System
  • Requirements analysis and Design completed
  • MOC/ISOC STF Integration Test completed
  • ACS Simulation ready for integration with MPS
  • Beta version on schedule for 12/5/07 delivery to
    the MCC
  • Final version on schedule for 1/4/07 delivery to
    the MCC
  • Flight Dynamics Group
  • Processing real tracking data received from
    Goddard FDF (Themis), which is a high
    eccentricity orbit similar to IBEX during the
    orbit raising.
  • Reviewing Pegasus launch analysis to incorporate
    into initial orbit acquisition and orbit
    determination
  • Universal Space Network
  • Contract is in place ICD is signed
  • CTV testing begins 12/4
  • Network interface testing begins in late November

14
Mission Operations Metrics
15
Operations Test Flow
  • Tests described in
  • S/C IT Plan (S924-PP6100)
  • Ground Segment Test Plan (S924-PP1220)
  • ISOC Test Plan
  • Order of tests can be altered to accommodate
    schedule changes

16
Flight Ops Team Participation In IT
  • Flight controllers will be allocated time on the
    spacecraft
  • Gain exposure to ground station and spacecraft
    operations
  • Exercise routine and contingency operations
    procedures
  • Goal is to provide flight controllers with 100
    hours of exposure to spacecraft and ground system
  • Specific activities during spacecraft and ground
    system integration and test provide good learning
    opportunities