Sustainable Energy Ireland - PowerPoint PPT Presentation

1 / 22
About This Presentation
Title:

Sustainable Energy Ireland

Description:

Fuel Trucks Unloading. 16. Fibrogen - MBM Conversion. 17. Inside the ... Particularly the Power Sale arrangements. Consistent and broad political support ... – PowerPoint PPT presentation

Number of Views:18
Avg rating:3.0/5.0
Slides: 23
Provided by: ninabu8
Category:

less

Transcript and Presenter's Notes

Title: Sustainable Energy Ireland


1
Sustainable Energy Ireland
  • Exploiting the Resource
  • David Raubenheimer
  • March 2004

2
Fibrowatt Overview
  • Developer owner operator
  • Power from agricultural residues
  • 65 MW operational
  • 2,650,000 MWh produced, 3.7 million tonnes fuel
  • Overview of Fibrowatts plants

3
The Carbon Cycle
CARBON (CO2)
Flue Gases
ENERGY
BEDDING FEED
ELECTRICITY
MANURE
BIOMASS
Ash
NUTRIENTS
4
Power Stations
5
Fibropower
Commissioned Jul 1992 Design output 12.7MW Burns
150,000 t/yr of poultry litter other biomass
6
Fibropower - Operational Experience
  • Development of know-how
  • Fuel characterisation difficult
  • Biomass knowledge fragmented
  • No available standards
  • Now runs exceptionally well
  • New fuels trialled

7
Fibrogen
Commissioned Nov 1993 Design output 13.5MW 3-5
yr Govt contract for 85,000 t/yr of meat bone
meal
8
Fibrogen
  • Commercially similar to Fibropower
  • 8 larger
  • New fuel handling design trials
  • Technically very successful
  • Achieves 90 100 availability
  • Converted to burn MBM

9
Fibrothetford
Commissioned 1998 Design output 38.5MW Burns
460,000 t/yr of poultry litter other biomass
10
Fibrothetford
  • Significant scale up 3x
  • New fuel storage design trial
  • Environmentally sensitive site
  • Environmental standards changed
  • Construction contractors more cautious
  • Scale up caused technical problems
  • Now running well

11
How it Works in the plant
12
Technology Current Plants
13
Fuel Pits at Fibrogen
14
Thetford Fuel Hall
15
Fuel Trucks Unloading
16
Fibrogen - MBM Conversion
17
Inside the Boiler
18
Technology - Results
  • Poultry litter burns very well
  • Characterisation is difficult
  • Handling needs care
  • Combustion performance
  • Certain arrangements excluded

19
Technologies Reviewed
  • Have reviewed a number
  • Stepwise development strategy
  • Fluidised Bed
  • Gasification
  • Digestion
  • High tech may be counterproductive

20
What a Project Needs
  • Available, contactable characterised fuel
    supply
  • Affordable electrical connection
  • 4 million to develop
  • 2 - 5 yrs development, 2 yrs construction
  • Incentivised construction contractors
  • Available land and local support

21
What a Project Needs (2)
  • Power Purchase Agreement
  • Bankable
  • Long term (construction 15 years)
  • Technology specific
  • Ash fertiliser sales routes
  • Abundant political support

22
Summary
  • 2,650,000 MWh
  • 3,700,000 tonnes of fuel
  • Significant teething problems overcome
  • Structure new market with care
  • Particularly the Power Sale arrangements
  • Consistent and broad political support
Write a Comment
User Comments (0)
About PowerShow.com