San Francisco-Oakland Bay Bridge East Span Seismic Safety Project - PowerPoint PPT Presentation

1 / 18
About This Presentation
Title:

San Francisco-Oakland Bay Bridge East Span Seismic Safety Project

Description:

Self-Anchored Suspension Span consists of a 160-meter single steel tower with a ... The workshop will concentrate on identification of Constructability issues for ... – PowerPoint PPT presentation

Number of Views:89
Avg rating:3.0/5.0
Slides: 19
Provided by: pcho7
Learn more at: https://dot.ca.gov
Category:

less

Transcript and Presenter's Notes

Title: San Francisco-Oakland Bay Bridge East Span Seismic Safety Project


1
San Francisco-Oakland Bay BridgeEast Span
Seismic Safety Project
2
SAS Constructability Workshop 04-012064
  • Self-Anchored Suspension Span consists of a
    160-meter single steel tower with a main cable
    and inclined suspenders supporting two steel
    orthotropic decks of a 385-meter main span and a
    180-meter back span. The workshop will
    concentrate on identification of Constructability
    issues for the tower and orthotropic boxes.

3
Participants
  • Contractors that plan to bid 04-012064 SAS/YBI
    contract
  • steel, fabrication firms that plan to submit
    estimates
  • steel plate suppliers, and
  • Caltrans Project Manager

4
Purpose is to identify
  • the capacity of the domestic steel market to
    produce plate steel for orthotropic boxes and
    tower
  • what is fabricators ability to fabricate and
    transport pieces
  • what affects contractors ability to bid the
    project due to the above issues

5
Purpose is to identify
  • contractors Constructability concerns
  • concerns with the tower pick

6
Constructability?
  • a noun
  • Constructibility?

7
What can Constructability achieve?
  • public and construction safety improvements
  • cost reductions and enhanced quality
  • improved and shortened project schedule

8
Constructability
  • Construction planning and Constructability
    analysis which integrates the diverse and quite
    often conflicting criteria into a coherent
    solution

9
Constructability
  • optimum use of construction knowledge and
    experience in planning, design, procurement
    field operations to achieve overall project
    objectives (Caltrans Project Engineer Academy)

10
Constructability
  • bid process design - bid - build
  • considered throughout project delivery up to award

11
Constructability is consideration and resolution
of barriers to bids open
  • no bidders
  • risk
  • financing
  • no materials or cost prohibitive materials
  • environmental permitting

12
Constructability is consideration and resolution
of barriers to bids open
  • are there responsible bidders
  • is there a competitive bidding process bid
    process design - bid - build
  • what do we do to make our PSE package attractive
    to the bidder?

13
SAS Constructability Workshop 04-012064bids open
January 2003 , advertises September 2002, and
open for westbound traffic in 2006
14
where are we on May 13, 2002?
15
BUY AMERICA WAIVER APPROVED BY FHWA
  • Tower Saddle (Upper Portion)
  • S-Wire Cable Wrapping
  • MacAlloy Bars

16
What are the necessary production rates for
  • delivery of plate steel,
  • fabrication,
  • erection?

17
lessons learned on other projects that might
relate to Constructability of the tower and
orthotropic boxes?
18
What next
  • use the roster to keep in touch
  • keep up to date by webpages, dbe, tollbridge,
    office engineer
  • bullets and power point presentations on toll web
    page
  • BID IT, BUILD IT