1
  • Red River Navigation Committee
  • LC Boggs Lock and Dam Approach Channel Study
  • 18 February 2009

2
Existing Dike Field Hydraulic Model Limits
3
(No Transcript)
4
Scope
  • Add Lower Approach Channel to
  • Existing Model
  • Address Difficult Navigation at the
  • Lower Approach to L.C. Boggs Lock
  • and Dam

5
Added L.C. Boggs Lower Approach
6
(No Transcript)
7
Higher Flows Affect Water Surface Levels over the
Eddy
8
Plans Tested
  • Structure, downstream widening, flow
  • Routing ideas
  • Widening the channel along the east
  • bank seems to be the only significant
  • and feasible improvement at low flows.

9
(No Transcript)
10
(No Transcript)
11
(No Transcript)
12
Widening also removes the whirlpools Navigation
Pothole
13
(No Transcript)
14
(No Transcript)
15
(No Transcript)
16
Questions - Discussion
  • Earthwork for 150 ft widening would be
  • around 322,000 cubic yards. Flow
  • velocities drop by 30 and the
  • widening removes the whirlpool/vortex
  • dip.