FLRC BLISS - PowerPoint PPT Presentation

1 / 61
About This Presentation
Title:

FLRC BLISS

Description:

FLRC BLISS – PowerPoint PPT presentation

Number of Views:201
Avg rating:3.0/5.0
Slides: 62
Provided by: mikefra4
Category:
Tags: bliss | flrc | ung

less

Transcript and Presenter's Notes

Title: FLRC BLISS


1
FLRC - BLISS
  • Field Installation Readiness Support Team
    (FIRST)
  • Contract
  • INDUSTRY DAY
  • BRIEFING

POC Mike Frankland (915) 568-0802 DSN
978 Mike.frankland_at_us.army.mil
2
POCs
  • COR PM
  • Mike Frankland Dean Smith
  • (915) 568-0802 (404) 464-5318
  • mike.frankland_at_us.army.mil dean.smith3_at_us.army.mil
  • Ordering Officer Ordering Specialist
  • Betty Parker Jennifer Zielinsky
  • (910) 907-5103 (910) 907-4750
  • Betty.parker1_at_us.army.mil jennifer.zienlinsky_at_us.a
    rmy.mil

3
Supporting ARFORGEN
Resetting the Force
Sustaining the Force
LOGFORGEN
National Level Reset Work
Left Behind Equipment (LBE)
Available 3
APS
New Equipment
Reconstitute APS
Contractor Logistics Support
Depots
LOGCAP
Depots
Director of Logistics
Director of Logistics
FLRC
Technology Insertion
Theater Provided Equipment (TPE)
FLRC
Life Cycle Mgmt Commands
Reestablish Ammo War Reserves
Life Cycle Mgmt Commands
Sustainment Brigades
Sustainment Brigades
Joint Logistics Integration
Army Field Support Brigades
Army Field Support Brigades
Distribution Management
Repair IAW TMs (10/20)
Training Sets
Reset/ Training 1
Ready 2
Current Missions
Army Materiel Command Logistics Synchronizer
and Integrator for ARFORGEN
11
4
  • FLRC Relationships
  • On Installations
  • Have local mission focus regional missions as
    assigned by FLRD
  • Have a long-standing role and relationship with
    local commanders
  • Provide mutual reciprocal support to LSE Cdr and
    his/her Face to the Commander mission
  • FLRC Project Officers determine how their
    missions will be accomplished
  • Are supported by an FLRD Program Manager for
    Funding and Contract Management
  • Project Officers are CORs for Task Orders
    supporting FLRC / FLRD missions
  • Must know and understand LSE CDR missions
  • Can leverage each others strength to support
    on-post customers

4
5
CURRENT MISSIONS
6
What We Are Doing
  • Left Behind Equipment (LBE)
  • Pre-Deployment Training Equipment (PDTE)
  • Field Level REST
  • RECAP (AMCOM) TCM-1 Program
  • Organizational Contractor Augmentation Teams
    (OCAT)
  • WSMR DOL Tactical Maint. Support

7
Current Activity
  • LBE 4th BCT 1st BCT
  • SVC RTN 10/20/30 for WSMR, JTF-N
  • RECAP AMCOM/LTPO TCM-1 Shelter
  • RESET MPP local ECP Region
  • RETROFIT ASV FRAG Kits
  • PDTE Bliss McGregor
  • Flyaway Pkg Ft. Lewis and others

8
WHERE WE DO IT AT
  • Ft. Bliss, TX
  • McGregor Range Base Camp, NM
  • Biggs Army Air Field, TX
  • White Sands Missile Range, NM

9
ADMIN OFFICES
Production Control
RM 113
RM 114
Budget Analyst
RM 108 FCMF-BLISS
Sr QAR
RM 115
Assistant Project Officer
Project Officer
RM 116
ENTRANCE
BLDG 515-B RM 108, FT BLISS TX
10
THE DUNGEON
Currently Remodeling
Contractors office
Storage
SWO
SWO
BUILDING 515-B BASEMENT AREA
11
FLRC Capacity Capability
12
FLRC Capacity Capability
13
(No Transcript)
14
FLRC Capacity Capability
OPERATIONAL STOCK 3340 LINES
VALUED OVER 2.6 MILLION
15
FLRC Capacity Capability
16
FLRC Capacity Capability
17
FLRC Capacity Capability
18
FLRC Capacity Capability
  • Capacity One facility on McGregor Range Base
    Camp 18,000 sq. ft.
  • Fenced, lighted w/sentry gate
  • W/ 25K Crane 2 15K external
  • Wash rack w/ oil/water separator
  • 3 inspection pits
  • Closed bay vehicle exhaust system
  • ASL/PLL storage 8.5K sqft
  • Wield, HVAC, HYD, CRP

19
Field Logistics Readiness Center (FLRC)
PDTE
Restores Equipment to a Completely Fault-Free
Condition
20
PDTE
  • Pre-Deployment Training Equipment
  • Two sites McGregor Bliss
  • McGregor 125 weapons 75 vehicles
  • Bliss 300 vehicles to include ASV MRAPs
  • Growth Increase to 800 Density in FY10
  • ASV Support
  • MRAP Support

21
PDTE McGregor
22
BLISS PDTE
23
(No Transcript)
24
FLRC Capacity Capability
  • Capability 450 Wrench Turners wherever needed.
    Binds resources together.
  • Flyaway packages to Irwin, Hood, Lewis, Bragg,
    Hawaii, Kentucky, Arizona
  • Can lease what is not available on installation
  • Can SUB if required
  • Can SURGE to meet short and long missions
  • Test equipment to meet the 10/20/30 missions
  • Programmed ASL/PLL
  • Welding, HVAC, HYD, CCRP

25
FLRC Capacity Capability
  • Capability Test and Repair Capability for
  • Armored Personnel Carrier (APC) M113A3
  • Hercules (M88)
  • And upcoming programs
  • ATLAS II
  • HMEE
  • Lightweight Prime Mover (LWPM)
  • Internally Transported Vehicle (ITV)
  • M1A2 and Bradley upgrades
  • HMMWV
  • Stryker
  • Palletized Loading System (PLS)
  • Heavy Expanded Mobility Tactical Truck (HEMTT)
  • Heavy Equipment Transporter (HET)
  • Family of Medium Tactical Vehicles (FMTV)
  • Medium Tactical Vehicle Replacement (MTVR)
  • HIPPO
  • Light Equipment Transporter (LET) M915, M916, M917

26
FLRC Capacity Capability
  • Capability Sub-Components that can be onboard
    Tested and Repaired

Detroit Diesel - DDEC II - DDEC III -
DDEC IVCaterpillar - 3126A - 3126B -
C12 - C7
WABCO ABSEaton - ABS - CTIS GM
4L80Allison - ATEC - WTEC
27
WSMR SUPPORT
28
WSMR DOL SUPPORT
29
FLRC - WSMR
FLRC LIGHT MAINTENANCE FACILITY B-1794
11
1
5
12
6
7
13
10
9
8
  • Latrines / Locker Room 7. Inspection Section
  • DOL Fast Maintenance 8. Break Area
  • DOL Fast Maintenance 9. SAMS-E Office
  • DOL Fast Maintenance 10. Supply Office
  • Production Control Section 11. Site Supervisor
    Office
  • Tool Room Cage 12. Break Room

  • 13. Team Leader
    Office

FLRC AO
DOL AO
30
FLRC - WSMR
B-1794 Capability This maintenance area has 8
medium size bays with the capability for light
vehicle maintenance with approximately 7000sf of
space There is outside storage for equipment
processing The administrative area for WMMS and
QA are approximately 700sf The parts storage area
is approximately 700sf to include shelving The
equipment wash area is located 200yds east of the
facility There is no overhead lift in this
facility There is no QA or Lube pit
31
(No Transcript)
32
Organizational Contract Augmentation Teams (OCAT)
Provide on-site maintenance assistance, tailored
to the specific needs of our customer
Scheduled Services
Supply Support
10/20/30 Repairs
PATRIOT Systems
Power Generation
A/C and Heaters
33
FLRC Past Performance
WE WORK WELL WITH OTHERS
  • OIF-1, PATRIOT RESET in concert with LCOE,
    Raytheon TYAD
  • DOL MOB 211th TRANS 29th BCT
  • DOL AETF Surge w/ CLIN Established
  • OCAT within the FORSCOM ADA BDEs, TRADOC 6th
    ADA BDE, 4th BCT
  • FLYAWAYS working with other contracts for a
    common goal
  • CCRP with 4th BCT for Track Element
    refurbishment.
  • MWOs TACOM HEMTT Wheels Oil Cooler, CECOM A/C
    Conv.

34
AMCOM PATRIOT RESET
TEAM OF TEAMS
  • Tobyhanna Army Depot for COMMO
  • Raytheon for PAC III
  • Letterkenny Army Depot for PAC II
  • FLRC-Bliss for all Prime Movers

4 BDEs 7 BNs
35
Operation Iraqi Freedom Redeployment Recovery Plan
FORSCOM initiative to restore units to pre-war
readiness
On-site maintenance support
36
PATRIOT RESET
Restoring the PATRIOT fleet to pre-deployment
condition
Intensive Inspection
Complete Service
Repair and Return
10/20 Minus
37
Trailer Rebuild Program
A complete rebuild and refurbishment program for
PATRIOT maintenance and parts trailers
38
Maintenance and Parts Trailer Rebuild Program
BEFORE
Seam Damage
Poor Paint
Old Repairs
Water Damage
Corrosion
Frame Damage
Insulation Damage
39
Maintenance and Parts Trailer Rebuild Program
AFTER
Structure Repaired
New Floor
Interior Paint
All Electrical Works
Interior Like New
Complete Exterior Paint
Frame Repaired
40
FLRC TCM-1 Project
41
TACOM 5 TON RESET
42
(No Transcript)
43
(No Transcript)
44
INITIAL
45
FINAL
46
INITIAL
47
FINAL
48
FINAL
49
31ST BDE
50
11TH BDE
51
FINAL
52
FINAL
53
CECOM PWR GEN RESET
FINAL
54
FLRC TRACK CCRP
HARDWARE USED IN 10-20 TRACK REFURBISH
TRACK TENSION TABLE
55
FLRC TRACK CCRP
EVAPO RUST TRACK CLEANING SOLUTION
TRACK WORK TABLE BEFORE
56
FLRC TRACK CCRP
Cost savings 50
CODE B TRACK FINISH PRODUCT
57
FUTURE OPS
  • 1/1 AD RESET/LBE
  • Army Reserves M870 FOV 10/20/30
  • NM National Guard M870 FOV 10/20/30
  • TACOM FMX
  • 32nd AAMDC M901 LS 10/20/30 excess
  • DOL AETF Surge SPT

58
ISSUES CONCERNS
  • AMC Footprint Growth Affect on DRM and DOC AMC
    not core to the departments for support.
  • FLRC Facilities Current size designed to support
    ADA, 10K Troops. BRAC Modularity will bring it
    to 40K by 2011 or sooner. 1391 is ready to submit.

59
CLOSING
  • FLRC On Time! At Quality! Within Cost!!!
  • You pay for only what you want and you get what
    you pay for!
  • FLRC Versatile, Applicable Thinks outside the
    box! NO is not in vocabulary.
  • FLRC Ties the resources together accomplish the
    overall mission.
  • No Excuses with the RIGHT Results.

60
TOTAL COMBAT READINESS
61
  • DEEDS NOT WORDS
Write a Comment
User Comments (0)
About PowerShow.com