Title: PUBLIC WORKS ENGINEERING DIVISION


1
PUBLIC WORKSENGINEERING DIVISION
  • HURRICANE RESPONSE RESPONSIBILITIES

2
Todays Agenda
  • Overview - E. Martin
  • Responsibilities
  • Safety - D. Spivey
  • Damage Assessment - D. Dombroski
  • Routes Responsibilities
  • Location Reporting
  • Debris Management - P. Dunn
  • Debris Sites/Contracts
  • Family Preparedness - B. Ellington
  • Questions - E. Martin

3
(No Transcript)
4
2007 Hurricane Forecast
  • Leading storm forecaster, William Gray, predicts
    very active Atlantic hurricane season.
  • 17 named storms predicted.
  • 5 of them predicted to be major hurricanes with
    sustained winds of 111 m.p.h. or greater.
  • The probability of a major hurricane making
    landfall on the U.S. coast this year is 74,
    compared with the average of 52 over the past
    century.

5
PRIMARY DUTIES
  • DAMAGE FORECASTING
  • TRAFFIC SYSTEM MANAGEMENT
  • DAMAGE ASSESSMENT
  • CONTRACT SUPPORT
  • ENGINEERING ANALYSIS and DAMAGE COST ESTIMATES
  • DEBRIS SITE MANAGEMENT
  • ENVIRONMENTAL COORDINATION
  • REAL ESTATE SUPPORT
  • DOCUMENTATION ACCOUNTING

6
(No Transcript)
7
WHERE DO YOU FIT?
  • Check the list for your primary and secondary
    duties
  • Check the map to see where your damage assessment
    area is
  • Check the storm surge / flood map to see where
    your house will be

8
(No Transcript)
9
DAMAGE FORECASTING
  • Drainage engineers contact Lake Wardens for lake
    levels and websites for tidal predictions
  • Monitor Lake Drummond website for lake levels
  • Monitor tidal flooding gages in Elizabeth River
    and AC Canal
  • Monitor weather radar for accumulations of
    rainfall in certain areas
  • Predict flooding based on tidal levels, rainfall,
    lake levels
  • Pass information to EOC and PWOC

10
(No Transcript)
11
TRAFFIC SYSTEM MANAGEMENT
  • Coordinate with Regional Smart Traffic Center and
    VDOT on evacuation plans and status
  • Monitor VDOT traffic control plan implementation
    plan available in PW Emergency Book
  • Modify city traffic signal system to support
    evacuations and disaster response

12
(No Transcript)
13
DAMAGE ASSESSMENT
  • Assignments as per 2007 plan
  • TEAMWORK Damage assessment teams and road
    clearing teams must work together
  • Pre-positioned or on-call it depends
  • Run your routes for practice identify hazards
    and detours
  • Communication expect problems
  • Documentation logs, worksheets, photos

14
(No Transcript)
15
CONTRACT SUPPORT
  • Contact local contractor for support
  • pre-negotiated rates
  • Secure additional Public Works contract support
    as necessary
  • FEMA / Presidential declaration is key

16
(No Transcript)
17
ENGINEERING ANALYSIS and DAMAGE COST ESTIMATES
  • Additional engineering analysis of damaged
    roadways, structures, bridges
  • Developing repair cost estimates immediately and
    compiling for EOC
  • Cost estimate worksheets available for common
    damage (cave-in, washouts, etc).

18
(No Transcript)
19
DEBRIS SITE MANAGEMENT
  • Survey crews man debris sites when activated,
    inspectors follow up later, replaced by
    contractor PBSJ
  • Critical to document amount and type of debris
    log sheets available
  • Separation of debris types on debris site is
    critical site plans are available
  • Separate construction debris, woody debris,
    rubbish, hazardous materials

20
(No Transcript)
21
ENVIRONMENTAL COORDINATION
  • Environmental specialists coordinate with DEQ on
    opening of debris sites
  • Monitor operations of debris sites to include
    before, during and after photography and site
    assessments
  • Assist other City departments as needed

22
(No Transcript)
23
REAL ESTATE SUPPORT
  • Contact private debris site owners to advise of
    activation
  • Support other City departments with Real Estate
    needs bed down locations, temporary housing
    locations, additional debris sites

24
(No Transcript)
25
DOCUMENTATION ACCOUNTING
  • Tracking of man hours and equipment of response
    crews (reg. time vs. OT)
  • Compiling reports to EOC and Accounting
  • Assist in PWOCC and Damage Assessment team admin
    support
  • Maintain communications between DA Team Leader
    and PWOCC
  • Logistical support to Division as needed

26
(No Transcript)
27
(No Transcript)
28
LOTS TO DO!
  • Do it safely first and foremost.
  • Take care of your family by pre-planning so you
    can be here to help the rest of the City recover!
  • Know your job and ask questions
  • Everyone works together or it doesnt work