Title: CONCESSIONS OF RAILROADS


1
CONCESSIONS OF RAILROADS CLEILSON
QUEIROZ VALEC-ENGENHARIA,CONSTRUÇÕES E FERROVIAS
S.A.
2
NORTH - SOUTH RAILROAD (EF 151)
  • THE SUB-CONCESSION OF THE SECTION PALMAS (TO)
    ESTRELA DOESTE (SP)

WEST - EAST INTEGRATION RAILROAD(EF 334)
  • THE SUB-CONCESSION OF THE SECTION FIGUEIRÓPOLIS
    (TO) ILHÉUS (BA)

3
VALEC - Engenharia, Construções e Ferrovias S.A.
  • Public company of the Ministry of Transport .
  • Purpose construction and operation of
    Brazilian
  • railway infrastructure .

4
 RAILWAY CONCESSIONS OF VALEC
BELÉM
EF 151
BOQUEIRÃO DA ESPERANÇA
FIGUEIRÓPOLIS
EF 334
ILHÉUS
EF 234
PORTO MURTINHO
EF 267
PANORAMA
LITORAL DO RIO DE JANEIRO
5
NORTH - SOUTH RAILROAD CURRENT STAGE OF
CONSTRUCTION
BELEM
DESIGNED
ACAILANDIA
CONCLUDED
COLINAS DO TOCANTINS
UNDER CONSTRUCTION
ANAPOLIS
DESIGNED
ESTRELA DOESTE
6
NORTH - SOUTH RAILROAD SUB-CONCESSION SECTION
Belém
SÃO LUIS
Palmas
EF 151
TOTAL EXTENSION OF THE SECTION TO
BE GRANTED 2,600 MILES
Estrela DOeste
RIO DE JANEIRO
ESTIMATED INVESTMENT R 3,5 bilhões
SANTOS
7
WEST- EAST INTEGRATION RAILROAD SUB-CONCESSION
SECTION
Belém
SÃO LUÍS
ESTIMATED INVESTMENT R 3 BILHÕES
FIGUEIRÓPOLIS
EF 334
TOTAL EXTENSION OF THE SECTION TO
BE GRANTED 2,384 MILES
ILHEUS
EF 151
8
AREA OF INFLUENCE OF THE NORTH - SOUTH RAILROAD
BRAZILIAN SAVANA
EXTENSION OF SAVANA 1,8 milhão km2
9
PRODUCTIVE POTENTIAL OF SUB-CONCESSIONS AREA
OF INFLUENCE 
  • Fertilizer
  • Alcohol
  • Derived from petroleum
  • Containers
  • Iron ore
  • Bauxite
  • Soybeans and derivatives
  •    Soybean meal
  •   Soybean oil
  •    Maize
  •    Fertilizer
  •    Sugar
  •    Cotton

10
ESTIMATED DEMAND FOR TRANSPORT (TON.MIL)
11
THE SUB-CONCESSION PROCESS
  • Term of sub-concession 30 years
  • Provides resources fully paid for the VALEC,
    as stipulated in the contract schedule and the
    announcement of the sub-concession.

12
THE LEGAL FRAMEWORK OF THE SUB-CONCESSION PROCESS
  • Law nº 8.987 ( February 13, 1995)
  • Law nº. 9.074, (June 7, 1995 )
  • Article 175 of the Federal Constitution
  • Law nº 8.666 ( June 21, 1993)
  • Law nº 9.648 ( May 27, 1998)
  • Announcement of the sub-concession, and annex

13
REQUISITES FOR THE PARTICIPATION OF COMPANIES
  • The participation of individual Brazilian and
    Foreign Companies is
  • permitted.
  • The participation of consortiums between
    Brazilian and / or Foreign
  • Companies in one Consortium is also
    permitted.
  • Acquisition of the Bidding Documents.
  • The presentation of a commitment to form a
    consortium indicating
  • the participation of each member of the
    consortium and the leader.

14
STAGES OF THE BIDDING PROCESS
  • FIRST STAGE OF THE BIDDING PROCESS
  • PRE-QUALIFICATION
  • (Special Bidding Committee of VALEC)
  • Legal Qualification
  • Technical Qualification
  • Economic and Financial Qualification
  • Clean Fiscal Standing

15
STAGES OF THE BIDDING PROCESS
Delivery of the BOVESPAs instructions   to the
pre-qualified companies
16
STAGES OF THE BIDDING PROCESS
  • SECOND STAGE OF THE BIDDING PROCESS AUCTION IN
    THE BOVESPA(The Sao Paulo Stock Exchange)
  • Deposit of the Bid Guarantee (two days prior
    to the Auction)
  • Proceedings in accordance with the BOVESPA
    Manual
  • Adjudication of the result based on the
    Highest Payment offered
  • for the grant of the Concession
  • Disqualification of Proposals below the Minimum
    Value established
  • for the grant of the Concession
  • Confirmation of the Winning Bid by the
    auctioneer
  • Publication of the Result of the Auction
    indicating the winning company
  • Creating a Specific Purpose Society for signing
    the contract

17
SUB CONCESSION PAYMENT
  • NORTH - SOUTH RAILROAD ( EF 151)
  • 1st installment - 50 of the winning bid of the
    auction upon financial settlement - the signing
    of the sub concession - in conclusion of
    construction of the of the section Palmas (TO)
    Anápolis (GO), scheduled for December 2010.
  • 2nd installment - 25 of the winning bid in
    conclusion of construction of the Ouro Verde de
    Goias (GO) - Rio Verde (GO), scheduled for July
    2011.
  • 3rd installment - 25 of the winning bid in the
    auction in conclusion of construction of the
    section Rio Verde (GO) Estrela DOeste (SP),
    scheduled for December 2011.

18
SUB CONCESSION PAYMENT
  • WEST- EAST INTEGRATION RAILROAD ( EF 334)
  • 1st installment - 40 of the winning bid of the
    auction upon financial settlement - the signing
    of the sub concession - in conclusion of
    construction of the section Ilhéus (BA) - Caetité
    (BA), scheduled for July 2011.
  • 2nd Tranche - 30 of the winning bid in
    conclusion of construction of the section Caetité
    (BA) - Correntina / Barriers (BA), scheduled for
    July 2012.
  • 3rd installment - 30 of the winning bid in the
    auction in conclusion of construction of the
    section Figueirópolis (TO) - Correntina /
    Barreiras (BA), scheduled for December 2012.

19
VALEC Engenharia, Construções e Ferrovias
S.A. SAN Quadra 3 Sala 1100 Edifício Núcleo
dos Transportes Brasília DF www.valec.gov.br
20
THANKS !