AA 4362 Astrodynamics - PowerPoint PPT Presentation

1 / 56
About This Presentation
Title:

AA 4362 Astrodynamics

Description:

Oral and Written (Power point) Briefings Due. Final ... McCain, G., USN. Mission 3 (cont'd) Earth I Departure. Problem Set 1. Problem Set 2. Problem set 3 ... – PowerPoint PPT presentation

Number of Views:37
Avg rating:3.0/5.0
Slides: 57
Provided by: tonywh
Category:

less

Transcript and Presenter's Notes

Title: AA 4362 Astrodynamics


1
AA 4362 Astrodynamics
Oral and Written (Power point) Briefings
Due Final Exam Day, Thursday June 20, 800 -
1000 am Room 282 Ingersol, 30 minutes
allotted for each of 4 teams Show as much
detail as you can for a 30 minute brief
2
A Cheesy Movie but a good problem
3
(No Transcript)
4
Feasibility Studies
5
Assemble Giant Spacecraft in Orbit
6
Daedalus II The Right Spacecraft for the Job
7
Stage I Nuclear Propulsion Module
8
Solid Core Fission Reactor (Stage 1)
9
Stage II Crew Module
10
Engine Burn Scenarios
11
(No Transcript)
12
Planetary Data
13
Team 1
Capt. Amber, S. , USA LT. Crowley, P. , USN LT.
Ebert, K. , USN
14
Mission 1
15
Relationship of Launch Plane to Ecliptic
16
Problem Set 1
17
Hint 1
18
Hint 1 (CONCLUDED)
19
(No Transcript)
20
Problem Set II
21
Problem Set III
22
Problem Set III (contd)
23
Will They have Enough To breathe?
24
Problem Set IV
25
Problem Set IV (concluded)
26
Team 2
LT. OKressik, S. , USN LT. Howse, C. USN LT.
Watson, V. , USN
27
Mission 2
28
(No Transcript)
29
Earth I Departure
30
Problem Set 1
31
Problem Set 1 (contd)
32
Problem Set 2
33
Problem Set 3
34
Problem Set 3 (contd)
35
Problem Set 4
36
(No Transcript)
37
Team 3
Capt. Moore, B. , USA LT., McCain, G., USN
38
(No Transcript)
39
Mission 3 (contd)
40
Earth I Departure
41
Problem Set 1
42
Problem Set 2
43
Problem set 3
44
Finally, Problem Set 4
45
Team 4
LT. Lindsey, K., USN LT. Waterman, B. USN
The Away Team
Mission 4 The Reconnaissance Flyby
46
The Reconnaissance Flyby
While the other teams are performing the design
process for the manned mission . And while the
down-select process Is under way team 4 will
design an un-piloted flyby mission to Gather
data relevant to Earth II
47
The Reconnaissance Flyby (contd)
Can we do This? well no .. Because by
the Time we get there Earth II will already be
gone How about if we speed up? then well
catch it for sure
48
The Reconnaissance Flyby (contd)
Dang! That isnt Going to work either How
about if we slow down?
49
The Reconnaissance Flyby (contd)
Oh Yea, Hohmann Transfer with out final DV
burn
Assume Initial LEO (160 km altitude parking
orbit) Assume Dry Spacecraft Mass Of 1000
kg 2000 kg Dry Upper stage Kick Motor with
50
The Flyby Mission
Spacecraft properties
51
The Flyby Mission
52
The Flyby Mission (contd)
OK this is gonna be way too big of a
spacecraft how about a different approach?
Use a much smaller kick motor to put us on an
escape Parabola (minimum escape energy) and
then use a low thrust device to perform our
phasing maneuver
Low Thrust Motor Isp 2500 sec F 100
Nt Dry Weight 200 kg 0 lt Throttle lt 110
Kick Motor Isp 375 sec F 10 kn
Dry Weight 500 kg
53
The Flyby Mission (contd)
54
The Flyby Mission (contd)
Spiral Out for Approximately Half of the Mission
55
The Flyby Mission (contd)
TOFtotal n 1/2 years
Ooops Missed! Gotta Lower Reverse Thrust
Then Spiral Back
56
The Flyby Mission (contd)
TOFtotal n 1/2 years
Determine the Required propellant for 1)
escape from Earth SOI (High Thrust Kick Motor)
2) Trip from edge of Earth I SOI to edge of
Earth II SOI Once you reach Earth
II SOI how long will you have In near-Earth II
Space (within the Earth II SOI) to record data
Write a Comment
User Comments (0)
About PowerShow.com