Mr. Alan Robertson, Facilities Management Coordinator ... have already begun discussing the Pony position, where the position should be ... – PowerPoint PPT presentation

Number of Views:25
Avg rating:3.0/5.0
Slides: 24
Provided by: Beck4
Category:

less

Transcript and Presenter's Notes

Title: Efficiency Review: Final Report Section 7'0 Facilities Use and Management Submitted by MGT of Americ


1
Efficiency Review Final ReportSection 7.0
Facilities Use and ManagementSubmitted by MGT of
America
Staff Presentation to the School Board December
20, 2005. Mr. Bob Becker, Assistant
Superintendent for Operations Mr. Tony Brown,
Custodial Services Coordinator Mr. Ed Qualtrough,
Maintenance Supervisor Mr. Alan Robertson,
Facilities Management Coordinator
2
Efficiency Review Final Report as of June 23,
2005 The WJCC Administrative Response to
Section 7.0, Facilities Use Management
  • Seek mutual understanding of findings/recommendati
    ons from ER.
  • Seek mutual understanding of the Administrations
    response to findings/recommendations from ER.
  • Seek sufficient consensus among School Board
    members as to WJCC Actions related to ER.
  • a. Accept Administrations Recommendation to
    Affirm, Modify, or Reject recommendations of
    ER.
  • b. Ask the Administration to Amend its Response
    to ER
  • in some specified manner.
  • c. Gain mutual understanding among School Board
    members and Administration as to actions in
    the
  • future
  • (1) Those actions requiring Board approval
  • (2) Those actions allowing Administrative
    Discretion

3
Operations Department Roster
4
ER COMMENDATIONS
  • Williamsburg-James City County Public Schools is
    commended for having a suitable organization for
    the conduct of life-cycle costing in the
    procurement, operation, and maintenance of its
    facilities, and for having a simultaneous
    financial and administrative services authority
    where building services needs and priorities can
    be heard, considered, and advocated.
  • Williamsburg-James City County Public Schools is
    commended for exercising due diligence by using
    the professional services of an outside
    Construction Management (CM) firm to represent
    its interest with architects, engineers, and
    contractors hired by the WJCC School Board.

5
ER COMMENDATIONS
  • WJCC is commended for working cooperatively and
    diligently with the City and County in a
    four-step site selection process.
  • Williamsburg-James City County Public Schools is
    commended for implementing a well-organized,
    thorough, and exceedingly competent custodial
    program.
  • Williamsburg-James City County Public Schools is
    commended for a janitorial services program that
    provides excellent customer service to principals.

6
ER RECOMMENDATION ADMINISTRATIVE RESPONSE
  • 7-1 Work towards a community dialogue on the
    need for a formal Interlocal Agreement between
    the City of Williamsburg. James City County, and
    Williamsburg-James City County Public Schools for
    the pursuit of a joint, ongoing, and
    comprehensive planning process for all growth and
    development, including public school facilities,
    in the Williamsburg-James City County Area.
  • Response Accept the recommendation for a joint,
    ongoing, comprehensive planning process. To date
    we have implemented the following steps to that
    end
  • Included representatives from the City County
    early in the CIP Process
  • Met with representatives from James City County
    on Field Usage
  • Initiated a comprehensive planning process for
    all development related to school growth with
    City County Staffs
  • Invited City and County participation in our
    Monthly construction meetings for the new High
    School and Elementary School

7
ER RECOMMENDATION ADMINISTRATIVE RESPONSE
  • 7-2 Consider addressing the space needs in the
    Central Office and Operations Center should the
    division continue to grow.
  • Response 1 Accept the recommendation that the
    space needs of our Central Office and Operations
    Center need to be evaluated to meet the needs
    brought on by continued growth of our student
    population and the support needs to meet them.
  • Response 2 Modify. We believe the
    recommendation to perform this study in the
    2007-08 school year is a year too late and should
    be performed early in the 2006-07 school year.
  • The proposed fiscal impact is 30,000 and will be
    proposed in the upcoming CIP cycle.

8
ER RECOMMENDATION ADMINISTRATIVE RESPONSE
  • 7-3 Prepare guide specifications, in addition to
    the educational specifications now being
    finalized, for use by the school architects in
    the design of new facilities and for renovation
    and rehabilitation, as well as additions to
    existing facilities.
  • Response Accept the recommendation to provide
    guide specifications to guide the construction of
    new and renovation of existing facilities. To
    date we have accomplished the following to the
    achievement of this recommendation
  • Completed the compilation of Project Standards
    for Design Construction for Operational Issues
    such as Sitework, Concrete, Masonry. Metals,
    Equipment, etc..
  • Completed Standards for Division Athletic
    Practice Competition Fields.
  • Completed division School Furnishing Standards
    For All Major Building Spaces.
  • In progress on Educational Project Standards for
    Design Construction. Currently 70 complete
    and under division review.

9
ER RECOMMENDATION ADMINISTRATIVE RESPONSE
  • 7-4 Establish a life cycle cost analysis policy
    within the Building Services Directorate of WJCC.
  • Response Accept the recommendation to establish
    a policy to utilize life cycle cost analysis as a
    requirement for pertinent mechanical and
    structural systems (roofing) purchases.

10
ER RECOMMENDATION ADMINISTRATIVE RESPONSE
  • 7-5 Establish a policy whereby the seven-year
    upgrade and preventive maintenance cycle is
    identified, detailed, and incorporated in all
    future updates.
  • Response 1 Accept the recommendation that WJCC
    establish a policy formalizing the seven-year
    upgrade, preventive cycle and accompanying
    budgetary implications.
  • Response 2 Modify the seven-year upgrade and
    preventive maintenance cycle from current time
    frame to a ten-year cycle. Operations is
    currently combining replacement cycles for
    building envelope, mechanical systems, and
    scheduled upgrades into the ten-year cycle.

11
ER RECOMMENDATION ADMINISTRATIVE RESPONSE
  • 7-6 Hire an additional plumber and plumbers
    helper, one electricians helper, two HVAC
    helpers, and two carpenters helpers.
  • Response Modify as follows
  • 2005/2006 one (1) Plumber hired
  • 2006/2007 hire three (3) General Maintenance
    (Helper)
  • According to the 34th Annual M O Cost Study
    done by American School University maintenance
    employees service apx. 87,900 square feet. Given
    that standard the three (3) General Maintenance
    hires in 06/07 will provide us with adequate
    staffing.

12
(No Transcript)
13
(No Transcript)
14
(No Transcript)
15
(No Transcript)
16
ER RECOMMENDATION ADMINISTRATIVE RESPONSE
  • 7-7 Hire a delivery person who can serve as a
    courier, messenger and furniture/equipment mover.
  • Response Modify. Operations and Finance have
    already begun discussing the Pony position, where
    the position should be housed, should it be part
    or full time. We plan to have resolution in time
    for inclusion in the FY 2007 budget.
  • Response Modify. Operations believes that with
    the addition of the three general maintenance
    helpers there will be adequate staffing to handle
    necessary furniture and equipment moving.

17
ER RECOMMENDATION ADMINISTRATIVE RESPONSE
  • 7-8 Prepare a comprehensive manual of
    maintenance policies, procedures, and other key
    items for the up keep of WJCC facilities.
  • Response Accept the recommendation to prepare a
    comprehensive manual of maintenance policies and
    procedures. The development of this resource is
    in progress. Mr. Ed Qualtrough has identified
    its layout and contents and is gathering the
    appropriate materials for inclusion. His time
    table for completion is February of 2006.

18
ER RECOMMENDATION ADMINISTRATIVE RESPONSE
  • 7-9 Adapt Xeriscape landscaping at all division
    facilities.
  • Response Modify the recommendation. We endorse
    the concepts behind Xeriscape. We will work
    cooperatively with the James City County General
    Services Department identifying appropriate
    landscaping needs for all existing and new WJCC
    facilities, guided by a philosophy that
    encourages low maintenance and water conservation.

19
ER RECOMMENDATION ADMINISTRATIVE RESPONSE
  • 7-10 Prepare and implement a plan for adding
    custodial office, equipment, and chemical storage
    for those schools that are currently deficient,
    and also address principal concerns.
  • Response Accept the recommendation, space needs
    will be addressed in the 7-year renovation cycle
    for buildings through the CIP Process.
  • Mr. Tony Brown is meeting regularly with
    building principals in an effort to improve
    communication and meet concerns they have in a
    timely manner.

20
ER RECOMMENDATION ADMINISTRATIVE RESPONSE
  • 7-11 Use the performance contracting method to
    provide for the replacement of older, inefficient
    heating and cooling systems.
  • Response Accept the recommendation to utilize
    performance contracting in the replacement of
    old, inefficient HVAC equipment. Mr. Qualtrough
    has already met with two performance contractors
    from the list maintained by the Virginia
    Department of General Services (VDGS). He will
    be meeting with other performance contractors to
    determine what services they offer and how we can
    best utilize them to accomplish our goals.

21
ER RECOMMENDATION ADMINISTRATIVE RESPONSE
  • 7-12 Employ major new energy technologies for
    Heating and Cooling as outdated HVAC Systems are
    replaced.
  • Response Accept this recommendation,
    incorporating new energy technologies into the
    design of all new facilities and through
    performance contracting as per our response to
    recommendation number 7-11

22
ER RECOMMENDATION ADMINISTRATIVE RESPONSE
  • 7-13 Use building commissioning in the
    replacement of Heating and Cooling Systems and in
    the construction of new facilities, as well as
    the renovation of existing ones.
  • Response Modify the recommendation to endorse
    the use of commissioning services in projects not
    utilizing a construction management firm.

23
ER RECOMMENDATION ADMINISTRATIVE RESPONSE
  • 7-14 Install special lighting control devices in
    all school facilities.
  • Response Accept the recommendation to install
    special lighting control devices in all school
    facilities, to be included in specifications for
    new buildings and implemented in existing
    facilities through performance contracting or the
    refurbishment/up date cycle.