Title: Peace River Manasota Regional Water Supply Authority Surface Water and Reservoirs, Meeting the Chall
1Peace River ManasotaRegional Water Supply
AuthoritySurface Water and Reservoirs, Meeting
the Challenge of Growing Public Demands for
Water
- Charlotte Harbor National Estuary Program
- Citizens Advisory Committee Meeting
- April 16, 2008
2(No Transcript)
3Manatee River Reservoir
4cfs
cfs
5(No Transcript)
6(No Transcript)
7(No Transcript)
8(No Transcript)
9(No Transcript)
10Embankment Cross Section
11Reservoir No. 2 Construction Permits
- Permits required by DEP
- Preliminary feasibility and soil testing
- Final Engineering Construction Plans
Specifications - Submittal Review by DEP
- Permit Issued
- Total permitting process took almost 3 years
12Reservoir No. 2 Environmental Resource Permits
(ERP)
- Obtain permits set aside a 51 acre Gopher
Tortoise recipient site - Reservoir foot print impacted 33 wetlands for a
total of 165 acres - Assessment of type, quantity quality of
impacted wetlands by WMD, DEP, ACOE - Assessment of type quantity quality of
mitigation wetlands to be restored on site - Restored 64 wetlands for a total restoration of
1055 acres
13Peace River Regional Water Supply Facility
Raw WaterStorage Reservoir
Potable Water ASR Wells
Water Treatment Plant
Treated Water Storage
Water Transmission
PeaceRiver
Demand
14Water Use Permit Diversion Schedule
- River Flow at Arcadia 130 cfs or lower no pumping
from the river - River Flow at Arcadia above 130 cfs pump up to 10
of River Flow - Typical year no river withdrawal for 120 days
- Drought year 2000 no river pumping for 250 days
15Surface Water Challenges
- Reliability
- Salt water intrusion
- Industrial spills
- Wastewater discharges
- Algae taste odor
16(No Transcript)
17- 100 miles long
- Drains 2,300 square miles
- Charlotte Harbor is recognized as a National
Estuary - Facility optimized location
18- Salt Water Intrusion
- Low river flow
- High tides
- High winds
- Rely on stored reserves
19- Industrial spills
- Wastewater discharges
- Algae taste odor
- Rely on stored reserves
20Summary
- Off stream reservoirs provide system reliability,
- Protect the down stream estuary by allowing the
storage of river water during high flow periods, - Provide safety in the event of poor water quality
in the river and - Improves water quality
21END
22Executive Order Diversion Schedule
- When the Combined River Flow of Arcadia, Horse
Creek Joshua Creek is above 90 cfs pump up to
14 of river flow - When the Combined River Flow of Arcadia, Horse
Creek Joshua Creek is Above the Median Flow of
330 cfs Pump up to 21 of River Flow
23(No Transcript)
24(No Transcript)
25Microconstituents
- Ibuprofen taken _at_ 400 mg dose. Found in water _at_
.0002 mg/l - Public utilities comply with all drinking water
standards
26(No Transcript)
27Regional Sources In Evaluation Source Water
Feasibility Study
28(No Transcript)
29Lower Peace River Minimum Flows and Levels
- Apr 20 June 25 10 diversion allowed if river
flow is below median or 26 diversion if river
flow is above the median flow - Oct 27 Apr 19 14 or 21
- Jun 26 Oct 26 12 or 15
30Shell Creek Minimum Flows and Levels
- Apr 20 June 25 10 diversion allowed if river
flow is below median or 23 diversion if river
flow is above the median flow - Oct 27 Apr 19 18 or 42
- Jun 26 Oct 26 35 or 83