Interoperable access to the Pleiades HR Ground Segment within ORFEO - PowerPoint PPT Presentation

1 / 14
About This Presentation
Title:

Interoperable access to the Pleiades HR Ground Segment within ORFEO

Description:

Sous-Direction 'Produits et Segments Sols' ... (Pratica de Mare) Italian. Civilian. Main Center (Matera) Spanish. Defense. Main Center ... – PowerPoint PPT presentation

Number of Views:42
Avg rating:3.0/5.0
Slides: 15
Provided by: guypi
Category:

less

Transcript and Presenter's Notes

Title: Interoperable access to the Pleiades HR Ground Segment within ORFEO


1
Interoperable access to the Pleiades HR Ground
Segment within ORFEO
  • Chantal PANEM, Jean-Pierre GLEYZES
  • CENTRE NATIONAL D'ETUDES SPATIALES
  • Direction du Centre de Toulouse
  • Sous-Direction "Produits et Segments Sols"
  • Service "systèmes de Traitement d'Image et de
    données Scientifique

2
Schedule
  • Pléiades HR Multi-sensor environment
  • PHR context
  • PHR ORFEO environment
  • Pléiades HR Ground Segment overview
  • Main PHR centers physical location
  • PHR Main User ground center functional
    architecture
  • ORFEO concept Imagery Customer Request
    Workflow
  • Pléiades HR within ORFEO
  • Pléiades HR Users Access services
  • PHR Imagery Customer Request Workflow
  • PHR Imagery Customer Request management
  • PHR multi-sensor interfaces
  • PHR Planning

3
PHR Context
  • ORFEO Cosmo SKymed (radar) PHR (optical)
    components
  • PHR Dual environment Defense Civil
  • Inter-operability needs
  • Defense partner shall be able to acquire, process
    data from the defense partner
  • Defense partners shall be able to send
    programming requests to the partner and receive
    acquisition plans
  • Civilian partner shall be able to acquire,
    process data from the civilian partner
  • Civilian partners shall be able to send
    production request to the civilian partner and
    receive products
  • PHR developed in an european cooperation context
  • Austria and Belgium , Sweden and Spain
  • National funding in exchange for industrial
    return, images acquisition, etc
  • Italie Turin agreement
  • In the civilian context, needs of common access
    with other satellites like SPOT (Cf. INCAS
    demonstration with SpotImage SPOT catalog)
  • In the defense contexts, needs of inter-operable
    access with other defense satellites ground
    segments

4
PHR ORFEO environment
PLEIADES HR Constellation
Optical Satellite Command and Control GS
PHR Image Calibration Center
Satellite Control Center (CCS) TTCS (SAR)


PHR dual GS
CSK dual GS
G/S
G/S
G/S
SAR Mission Planning and Monitoring Center (CPCM)
Optical Dual Programming Center
Italian Civilian Center (CREDO)
French Civilian Center
ORFEO system
5
PHR Ground Segment overview
PHR
Space
Segment
Ground
Segment
2 satellites
  • Dual Ground Segment responsible of
  • the management of the space segment
  • the elaboration of the dual Mission Plan
  • Instruments calibration
  • User Ground Segment Responsible for dealing
    with
  • users requests,
  • satellite image telemetry reception
  • image production and dissemination

6
Main PHR centers physical locations
7
PHR Main User ground center functional
architecture
Acces
Services
for
Users
Programming
Chain
Imaging
Image Processing unit
Chain
InventoryArchive Catalog Product generation
dissemination Monitoring Control
Common
Services
8
ORFEO Imagery Customer Request Workflow
9
PLEIADES within ORFEO
  • ORFEO status (end-2003)
  • Cosmo SKymed PHR ground segments independant in
    terms of architecture and interfaces
  • Design choice PHR will expose interfaces
    compatible with a future multi-sensor level in
    a single development unit, called Access Unit
    (provision for future federation with
    multi-sensor layer)

10
PHR Users Access Services
  • Provides the users with MMI and tools to access
    the PHR services
  • Browse image catalog
  • Deposit programming requests (ICR)
  • Deposit image production requests (ICR)
  • Follow the progress of requests

Acces
Services
Access
for
Users
Unit
Programming
PCME
DUPC
Programming
Unit
Unit
Unit
Chain
Image
Reception
Processing
Unit
Imaging
Unit
Chain
Image
Calibration
Unit
Command
Command
Control
Control
Unit
Chain
11
PHR Imagery Customer Request Workflow
12
PHR Imagery Customer Request management
  • Today, access to PHR are defined at Programming
    Services and Production Services levels
  • No multi-sensor ICR management within PHR
  • ICR level still to be defined (June 2004)

13
PHR multi-sensor Interfaces
  • Access to PHR Catalog(s)
  • Catalog Browsing services directory, guide,
    search
  • Catalog metadata and services to be defined with
    ISO TC 211 OGC standards Access to PHR
    programming
  • Programming User Requests and services
    analysis, feasibility, submit, compute, get,
    interrupt
  • Programming Request Elements get
  • Programming User Requests Progress reports
    notify
  • Access to PHR Image Products processing
  • Image Products metadata and requests to be
    defined with ISO TC 211
  • Image Products Requests and services submit,
    cancel, update, stop
  • Image Products Requests reports
  • Station Management services slot reservation
  • Operational data services climatology
    statistics, weather forecast, orbital data
  • No Request For Quotation service to be
    provided in the scope of PHR project (to be
    handled by commercial operator)

XML,Web Services
14
PHR Planning
  • Ground segment development
  • Preliminary Design Review June 2004
  • Interfaces functional requirements
  • Development of chains 2005-2006
  • Detailed interfaces definition Mid 2005
  • Integration of centers and tests 2007
  • Launch of the first satellite August 2008
  • Launch of the second satellite 18 months later
Write a Comment
User Comments (0)
About PowerShow.com