COUNTRY REPORT ON IPP, MALAWI - PowerPoint PPT Presentation

1 / 8
About This Presentation
Title:

COUNTRY REPORT ON IPP, MALAWI

Description:

Inspectors at boarder posts report to their respective PPO ... Red locust. Surveillance trips are conducted every year before in traditional egg laying sites. ... – PowerPoint PPT presentation

Number of Views:69
Avg rating:3.0/5.0
Slides: 9
Provided by: TRG2
Category:
Tags: country | ipp | malawi | report | locust

less

Transcript and Presenter's Notes

Title: COUNTRY REPORT ON IPP, MALAWI


1
COUNTRY REPORT ON IPP, MALAWI
  • MVIHA, PJZ

2
ENTRY POINTS
3
ENTRY POINTS
  • Border posts
  • Muloza border post
  • Mwanza border post
  • Dedza border post
  • Mchinji border post
  • Songwe border post
  • International airports
  • Chileka Airport in the South
  • Kamuzu International Airport

4
MALAWI NPPO ORGANIZATIONAL STRUCTURE
5
MALAWI NPPO ORGANIZATIONAL STRUCTURE
  • International Airports in South and Central,
    where Plant Inspectors are based and report to
    the PPO, south and central
  • Inspectors at boarder posts report to their
    respective PPO
  • PPO office also responsible for issuance of
    phytosanitary certificates
  • Divisional Crops Officers report on whatever
    takes place at farmer level

6
Data available
  • Army worm
  • Over 100 Pheromone traps.
  • The Divisional Crops Officers in the three
    regions responsible for collecting the data from
    the different areas and sending it to National
    Research Coordinator for decision making.
  • Report are submitted at monthly interval
  • Red locust
  • Surveillance trips are conducted every year
    before in traditional egg laying sites.
  • Lake Chilwa in the southern region and
    Ngolowindo, Salima in the central region.

7
Capacity Building
  • Internet infrastructure. ( Inadequate Electronic
    communication structures)
  • Internet Departmental Headquarters
  • The Department of Research has one internet
    terminal, which in most cases, is only available
    for use by the Director.
  • Need to improve on the accessibility of internet
    facility to Plant Protection Officers in the
    different regions.
  • 2. Internet Coordinator
  • The National Research Coordinator has an internet
    terminal which needs to be connected to the
    regional offices
  • 3. Government Wide Area Network (GWAN) (Proposal)
  • Currently there is a proposal for a Government
    Wide Area

8
Other Capacity building needs
  • Train staff on quarantine, produce inspection and
    epidemiology
  • Train staff on IPPC
  • Infrastructure development.
  • There is a need to improve on laboratory
    equipment
Write a Comment
User Comments (0)
About PowerShow.com