Title: PROCESS CONTROL COMPUTERS AT DURGAPUR STEEL PLANTS BASIC OXYGEN FURNACES
1PROCESS CONTROL COMPUTERS AT DURGAPUR STEEL
PLANTSBASIC OXYGEN FURNACES
2OBJECTIVES
- HELP REDUCE PROCESSING TIME
- MONITOR PROCESS IN REAL-TIME
- HELP INCREASE IN PRODUCTIVITY
- ACHIEVE C / TEMP. HIT RATE
- MANAGEMENT INFORMATION SYSTEM
- ENSURE QUALITY OF PRODUCT
3AUTOMATION LEVELS
- LEVEL 0 - FIELD INSTRUMENTS /SENSORS CAPTURING
ANALOG AND DIGITAL DATA. - LEVEL 1 - BASIC AUTOMATION SYSTEM HAVING A
SUPERLOOP OF TWISTED PAIR CABLE CONNECTING PCUs,
WSAs , CIUs. - LEVEL 2 - VAX 3300 SYSTEMS ONE FOR EACH
CONVERTER CONNECTED TO CIUs OF LEVEL 1
COLLECT DATA FROM - LEVEL 1 AND PASS SET POINTS.
- LEVEL 3 - VAX 3800 CLUSTER CONNECTED TO LEVEL 2.
4LEVEL I - LEVEL II - LEVEL III COMMUNICATION
RS-232
DECNET
VAX (L3)
VAX (L2)
CIU (L1)
NETWORK 90 SUPERLOOP
WSA (SUPERVISORY)
PCUs (22)
FIELD ( I/O)
- DISPLAYS
- SEND COMMANDS TO PLSs
- CHANGE SET POINTS, NODE ETC.
- OPERATOR -gt BULK MATERIAL ADDITION
5SMS HARDWARE
- MicroVAX 3800 Cluster - 2 M/Cs called Level 3
Systems - MicroVAX 3300 Computers - 4 M/Cs , 1 for each
Converter and - 1 for VAD
- MicroVAX 3100 - for BOF Lab
- Cluster Monitor
- 8 Terminal Servers, 2 Repeaters, 500 m Fiber
Optic Line - DEC Router, 45 Terminals and 20 printers
including 1 Laser printer, 1 Plotter and 1 Line
printer - Connections to Control Room and Blower desks at
9M, VAD,LDS,LTS, CCP, Mixer Bay, Scrap Yard,
Welfare Building, LAB - Commissioned by DEMAG (Germany)
6(No Transcript)
7SYSTEM SOFTWARE
- OPEN VMS 5.5-2
- VAX FORTRAN, DECNET, DECFORMS, GKS, TCP/IP,
ORACLE RDB, VOLSHAD, CLUSTER MONITOR - MODAS ( Case Tool )
APPLICATION SOFTWARE
- DIALOG BASED BACKGROUND PROGRAMS
- L II CONVERTER SPECIFIC SOFTWARE
- L II TEE,CCP,LTS,VAD SPECIFIC SOFTWARE
- L III ( Scheduling, Tracking )
- L II TO L III AND L III TO LIV COMMUNICATION S/W
8INFORMATION FLOW BETWEEN DIFFERENT LEVELS AT
S.M.S DURGAPUR STEEL PLANT
Level 1 to Level 2
Level 2 to Level 1
- Heat status e.g., HS,BS,TS,TE
- Each heats data like bulk material addition,
temps, lance position. Co/co2 at tap end - Converter activities as seen in event log
- Mode of converter operation
- Set point passing for o2 and bulk materials
after metallurgical calculations like - Process aim, hot metal ordering main
2nd blow calculation, end blow alloying
additions
Teeming Reports
Heat Reports
Level 3 to Level 2
Graphic Printouts
Level 2 to Level 3
Heat Number Heat Data Heat Status
Steel/Hot Metal/Slag Analysis CCP/LTS, Teeming
Data Scrap Yard/ Mixer Data
- Schedule/Plan for the day
- Ladle details
- Grade Specifications / Definitions
- Actual Steel Grades
Query Reports
M.I.S. Reports
Level 4 to Level 3
Level 3 to Level 4
Heat Number Teeming /CCP Cast Data Heat
Data Steel/H.Metal/Slag Analysis Data Backlog
details of the above, if any.
- Schedule Data
- Actual grades of cast from laboratory Level 4
terminal
9Level 2 System Tasks
- Heat Number Generation
- Metallurgical Calculations
- Heat status monitoring
- Select Mode of operation
- Analysis data entry from Lab
- Event log generation
- Data transfer lt-gt Level 3 Systems
10Level 3 System Tasks
- Heat Tracking
- Ladle Tracking
- Shop Scheduling
- Grade definitions
- Data Transfer to PPCS
- Database Upkeep
- Software development
11Level 2
12Level 2 Models
- Process Aim calculation
- Hot Metal /Scrap Ordering
- Blowing Calculation
- 2nd Blow Calculation
- Reblow Calculation
- Alloying Calculation
- Feedback Calculation
13Process aim calculation
- It is a feasibility check
- It reads grades and re-blow pattern
- The model predicts aim Carbon percentage and the
temperature of liquid steel at the end of blow
14PIC 60 DISPLAY
PROCESS AIM CALCULATION
15-JAN-03 111624
HEAT NO. 02311369 STEEL
GRADE R16 AXLE STEEL
CHARGE ID 23631 PETRO
COKE N
15Hot metal and scrap ordering calculation
- Hot metal, scrap or iron ore can be fixed
- Mixer and ladle number are a must
- Bulk materials are calculated
- Download order to mixer and scrap yard bay
- Basicity can be adjusted
16PIC 61 DISPLAY HOT METAL AND SCRAP
ORDERING CALCULATION 15-JAN-03 112024
HEAT NO. 02311369
STEEL GRADE R16 AXLE STEEL
CHARGE ID 23631
17Main blow calculation
- Done after start of heat
- Actual hot metal weight and temperatures are
given as input to the model - Model advices oxygen amount to be blown ( 1st
blow ) - It also outputs expected steel composition at
endpoint and slag weight
18PIC 62 DISPLAY
MAIN BLOW CALCULATION
15-JAN-03 113824
HEAT NO. 02311369 STEEL
GRADE R16 AXLE STEEL
CHARGE ID 23631
19Second / Re-blow calculation
- After taking sample and temperature during first
blow, this calculation can be done - Model advices oxygen amount and bulk material
additions/coolants - Expected end values
- Re-blow is necessary if percentage of Carbon is
too high, slag is too viscous
20PIC 63 DISPLAY SECOND BLOW AND
REBLOW CALCULATION 15-JAN-03
113824
HEAT NO. 02311369
STEEL GRADE R16 AXLE STEEL
CHARGE ID 23631 ACTUAL PROCESS
STATUS MAIN BLOWING 2 NUM OF REBLOWS 0
21Offline alloying calculation
- Done before Tap Start
- This model advices three different combinations
of alloys - C , SiMn, FeSi, FeMn are calculated
22PIC 66 DISPLAY
OFFLINE ALLOYING ADVICE
15-JAN-03 120923
HEAT NO. 02311369 CHARGE ID
23631 EXP. STEEL WT.
127.0
LADLE ANALYSIS C Mn Si P S C
LOSS AIM 0.200 0.600 0.080 0.040 0.030
10.00 ACTUAL 0.028 0.012 0.0
50 0.005 0.031
COST (1) RS 30902.0 COST (2)
RS 0.0 COST (3) RS
38566.2 ELEMENT C SI-FESI MN-FEMN
SI-SIMN MN-SIMN YIELD 45 65 85
65 85
23Level II VCS System
- This system is significant after tap end
- This system has data entry and monitoring screens
for - LADLE TREATMENT STATION
- CONTINIOUS CASTING PLANT
- TEEMING BAYS
- LADLE DESPATCHER
- PRODUCTION DATA ENTRY SCREENS OF TEEMING AND
CONTINIOUS CASTING PLANT
24Level 3
25Level 3 Models
- Heat Tracking In Shop
- Heat Scheduling
- Ladle Tracking
- Ladle Overview
- Data Storage
- Data Transfer To Level 4 PPC System
26Production status of steel shop
- Shows the status of last 10 heats
- One can know the heat number,
status, area, start / end times.
27DIALOG 23 DISPLAY PRODUCTION STATUS STEEL SHOP
01-JAN-03 101951 HEAT NO.
CHID LDL ST
CONVERTER TRANS SECONDARY TRANS
CASTING 02110767 22951 14
CE BOF1 0436
TEA-0600
0518 0651
02310768 22952 08
CE BOF-3 0502
TEA-4 0709
0545
0750 02110769 22949
18 CE BOF-1 0521
LTS-2 0642 CCM-1 0651
0615
0644
0812 02310770 22939
17 CE BOF-3 0547 LTS-1
0653 CCM-2 0703
0545
0700
0900 02110771
22942 02 HS BOF-1 0617
02310772 22943 01
BS BOF-1 0555
28Heat schedule
- Shows the planning of the shop
- Heat status, grade, route code
- Start / end time of different areas
29PIC 5O DISPLAY
HEAT SCHEDULE - SSC
01-JAN-03 102724
BDVLCT
30Ladle tracking and Ladle data
- Shows a map like view of positions of ladles in
the entire steel shop - Ladle placement times are captured
- Temperatures/times at various points like
preheating, porous plug in/out, gate preparation
start/end are captured - Status, location, last cast end, tap start,
reference details, life of PP,WB,In,On etcetera
31PIC 99/1 (2)
LADLE STATUS
01-JAN-03
102724
VAD
BOF 1
BOF - 2
BOF - 3
HEAT AND LADLE gt SCHED. END
gt NEXT PROC. AREA gt
NUMBER ST VD HM IN USE 4 AT LPB
15 8 EXT MT 1 6
INJ
PARK 04 06 11 13 21 25
TEA - 4
TEA- 3
TEA2
TEA - 1
DRYER
TEA 5
PARK 05 19 26
CSTF 07 08 14
32Ladle overview
- Shows the ladle status / position in the shop
- One can know the ladle number, status, area and
time of placement - Current Heat Number attached with a ladle is
displayed
33PIC 72 DISPLAY
STEEL LADLE OVERVIEW
01-JAN-03 102724
34Level 3 To Level 4 Data Flow
L E V E L 3
L E V E L 4
HEATDATA
CASTDATA
ANALYSIS DATA
GRADE LIST
BILLET DATA
35Level 4
36Level 4 PPC Modules
- Production and Planning
- Commercial Module
- Data Warehousing and Shipping
- Manufacturing Module
- Quality Assurance Module
37Thank You