PROCESS CONTROL COMPUTERS AT DURGAPUR STEEL PLANTS BASIC OXYGEN FURNACES - PowerPoint PPT Presentation

1 / 37
About This Presentation
Title:

PROCESS CONTROL COMPUTERS AT DURGAPUR STEEL PLANTS BASIC OXYGEN FURNACES

Description:

LEVEL 1 - BASIC AUTOMATION SYSTEM HAVING A SUPERLOOP OF TWISTED PAIR CABLE ... SMS HARDWARE. MicroVAX 3800 Cluster - 2 M/Cs called Level 3 Systems ... – PowerPoint PPT presentation

Number of Views:327
Avg rating:3.0/5.0
Slides: 38
Provided by: DSP61
Category:

less

Transcript and Presenter's Notes

Title: PROCESS CONTROL COMPUTERS AT DURGAPUR STEEL PLANTS BASIC OXYGEN FURNACES


1
PROCESS CONTROL COMPUTERS AT DURGAPUR STEEL
PLANTSBASIC OXYGEN FURNACES
2
OBJECTIVES
  • HELP REDUCE PROCESSING TIME
  • MONITOR PROCESS IN REAL-TIME
  • HELP INCREASE IN PRODUCTIVITY
  • ACHIEVE C / TEMP. HIT RATE
  • MANAGEMENT INFORMATION SYSTEM
  • ENSURE QUALITY OF PRODUCT

3
AUTOMATION LEVELS
  • LEVEL 0 - FIELD INSTRUMENTS /SENSORS CAPTURING
    ANALOG AND DIGITAL DATA.
  • LEVEL 1 - BASIC AUTOMATION SYSTEM HAVING A
    SUPERLOOP OF TWISTED PAIR CABLE CONNECTING PCUs,
    WSAs , CIUs.
  • LEVEL 2 - VAX 3300 SYSTEMS ONE FOR EACH
    CONVERTER CONNECTED TO CIUs OF LEVEL 1
    COLLECT DATA FROM
  • LEVEL 1 AND PASS SET POINTS.
  • LEVEL 3 - VAX 3800 CLUSTER CONNECTED TO LEVEL 2.

4
LEVEL I - LEVEL II - LEVEL III COMMUNICATION
RS-232
DECNET
VAX (L3)
VAX (L2)
CIU (L1)
NETWORK 90 SUPERLOOP
WSA (SUPERVISORY)
PCUs (22)
FIELD ( I/O)
  • DISPLAYS
  • SEND COMMANDS TO PLSs
  • CHANGE SET POINTS, NODE ETC.
  • OPERATOR -gt BULK MATERIAL ADDITION

5
SMS HARDWARE
  • MicroVAX 3800 Cluster - 2 M/Cs called Level 3
    Systems
  • MicroVAX 3300 Computers - 4 M/Cs , 1 for each
    Converter and
  • 1 for VAD
  • MicroVAX 3100 - for BOF Lab
  • Cluster Monitor
  • 8 Terminal Servers, 2 Repeaters, 500 m Fiber
    Optic Line
  • DEC Router, 45 Terminals and 20 printers
    including 1 Laser printer, 1 Plotter and 1 Line
    printer
  • Connections to Control Room and Blower desks at
    9M, VAD,LDS,LTS, CCP, Mixer Bay, Scrap Yard,
    Welfare Building, LAB
  • Commissioned by DEMAG (Germany)

6
(No Transcript)
7
SYSTEM SOFTWARE
  • OPEN VMS 5.5-2
  • VAX FORTRAN, DECNET, DECFORMS, GKS, TCP/IP,
    ORACLE RDB, VOLSHAD, CLUSTER MONITOR
  • MODAS ( Case Tool )

APPLICATION SOFTWARE
  • DIALOG BASED BACKGROUND PROGRAMS
  • L II CONVERTER SPECIFIC SOFTWARE
  • L II TEE,CCP,LTS,VAD SPECIFIC SOFTWARE
  • L III ( Scheduling, Tracking )
  • L II TO L III AND L III TO LIV COMMUNICATION S/W

8
INFORMATION FLOW BETWEEN DIFFERENT LEVELS AT
S.M.S DURGAPUR STEEL PLANT
Level 1 to Level 2
Level 2 to Level 1
  • Heat status e.g., HS,BS,TS,TE
  • Each heats data like bulk material addition,
    temps, lance position. Co/co2 at tap end
  • Converter activities as seen in event log
  • Mode of converter operation
  • Set point passing for o2 and bulk materials
    after metallurgical calculations like
  • Process aim, hot metal ordering main
    2nd blow calculation, end blow alloying
    additions

Teeming Reports
Heat Reports
Level 3 to Level 2
Graphic Printouts
Level 2 to Level 3
Heat Number Heat Data Heat Status
Steel/Hot Metal/Slag Analysis CCP/LTS, Teeming
Data Scrap Yard/ Mixer Data
  • Schedule/Plan for the day
  • Ladle details
  • Grade Specifications / Definitions
  • Actual Steel Grades

Query Reports
M.I.S. Reports
Level 4 to Level 3
Level 3 to Level 4
Heat Number Teeming /CCP Cast Data Heat
Data Steel/H.Metal/Slag Analysis Data Backlog
details of the above, if any.
  • Schedule Data
  • Actual grades of cast from laboratory Level 4
    terminal

9
Level 2 System Tasks
  • Heat Number Generation
  • Metallurgical Calculations
  • Heat status monitoring
  • Select Mode of operation
  • Analysis data entry from Lab
  • Event log generation
  • Data transfer lt-gt Level 3 Systems

10
Level 3 System Tasks
  • Heat Tracking
  • Ladle Tracking
  • Shop Scheduling
  • Grade definitions
  • Data Transfer to PPCS
  • Database Upkeep
  • Software development

11
Level 2
12
Level 2 Models
  • Process Aim calculation
  • Hot Metal /Scrap Ordering
  • Blowing Calculation
  • 2nd Blow Calculation
  • Reblow Calculation
  • Alloying Calculation
  • Feedback Calculation

13
Process aim calculation
  • It is a feasibility check
  • It reads grades and re-blow pattern
  • The model predicts aim Carbon percentage and the
    temperature of liquid steel at the end of blow

14
PIC 60 DISPLAY
PROCESS AIM CALCULATION
15-JAN-03 111624
HEAT NO. 02311369 STEEL
GRADE R16 AXLE STEEL
CHARGE ID 23631 PETRO
COKE N
15
Hot metal and scrap ordering calculation
  • Hot metal, scrap or iron ore can be fixed
  • Mixer and ladle number are a must
  • Bulk materials are calculated
  • Download order to mixer and scrap yard bay
  • Basicity can be adjusted

16
PIC 61 DISPLAY HOT METAL AND SCRAP
ORDERING CALCULATION 15-JAN-03 112024
HEAT NO. 02311369
STEEL GRADE R16 AXLE STEEL
CHARGE ID 23631
17
Main blow calculation
  • Done after start of heat
  • Actual hot metal weight and temperatures are
    given as input to the model
  • Model advices oxygen amount to be blown ( 1st
    blow )
  • It also outputs expected steel composition at
    endpoint and slag weight

18
PIC 62 DISPLAY
MAIN BLOW CALCULATION
15-JAN-03 113824
HEAT NO. 02311369 STEEL
GRADE R16 AXLE STEEL
CHARGE ID 23631
19
Second / Re-blow calculation
  • After taking sample and temperature during first
    blow, this calculation can be done
  • Model advices oxygen amount and bulk material
    additions/coolants
  • Expected end values
  • Re-blow is necessary if percentage of Carbon is
    too high, slag is too viscous

20
PIC 63 DISPLAY SECOND BLOW AND
REBLOW CALCULATION 15-JAN-03
113824
HEAT NO. 02311369
STEEL GRADE R16 AXLE STEEL
CHARGE ID 23631 ACTUAL PROCESS
STATUS MAIN BLOWING 2 NUM OF REBLOWS 0
21
Offline alloying calculation
  • Done before Tap Start
  • This model advices three different combinations
    of alloys
  • C , SiMn, FeSi, FeMn are calculated

22
PIC 66 DISPLAY
OFFLINE ALLOYING ADVICE
15-JAN-03 120923
HEAT NO. 02311369 CHARGE ID
23631 EXP. STEEL WT.
127.0
LADLE ANALYSIS C Mn Si P S C
LOSS AIM 0.200 0.600 0.080 0.040 0.030
10.00 ACTUAL 0.028 0.012 0.0
50 0.005 0.031
COST (1) RS 30902.0 COST (2)
RS 0.0 COST (3) RS
38566.2 ELEMENT C SI-FESI MN-FEMN
SI-SIMN MN-SIMN YIELD 45 65 85
65 85
23
Level II VCS System
  • This system is significant after tap end
  • This system has data entry and monitoring screens
    for
  • LADLE TREATMENT STATION
  • CONTINIOUS CASTING PLANT
  • TEEMING BAYS
  • LADLE DESPATCHER
  • PRODUCTION DATA ENTRY SCREENS OF TEEMING AND
    CONTINIOUS CASTING PLANT

24
Level 3
25
Level 3 Models
  • Heat Tracking In Shop
  • Heat Scheduling
  • Ladle Tracking
  • Ladle Overview
  • Data Storage
  • Data Transfer To Level 4 PPC System

26
Production status of steel shop
  • Shows the status of last 10 heats
  • One can know the heat number,
    status, area, start / end times.

27
DIALOG 23 DISPLAY PRODUCTION STATUS STEEL SHOP
01-JAN-03 101951 HEAT NO.
CHID LDL ST
CONVERTER TRANS SECONDARY TRANS
CASTING 02110767 22951 14
CE BOF1 0436

TEA-0600
0518 0651
02310768 22952 08
CE BOF-3 0502
TEA-4 0709
0545

0750 02110769 22949
18 CE BOF-1 0521
LTS-2 0642 CCM-1 0651

0615
0644
0812 02310770 22939
17 CE BOF-3 0547 LTS-1
0653 CCM-2 0703
0545
0700
0900 02110771
22942 02 HS BOF-1 0617
02310772 22943 01
BS BOF-1 0555
28
Heat schedule
  • Shows the planning of the shop
  • Heat status, grade, route code
  • Start / end time of different areas

29
PIC 5O DISPLAY
HEAT SCHEDULE - SSC
01-JAN-03 102724
BDVLCT
30
Ladle tracking and Ladle data
  • Shows a map like view of positions of ladles in
    the entire steel shop
  • Ladle placement times are captured
  • Temperatures/times at various points like
    preheating, porous plug in/out, gate preparation
    start/end are captured
  • Status, location, last cast end, tap start,
    reference details, life of PP,WB,In,On etcetera

31
PIC 99/1 (2)
LADLE STATUS
01-JAN-03
102724
VAD
BOF 1
BOF - 2
BOF - 3
HEAT AND LADLE gt SCHED. END
gt NEXT PROC. AREA gt
NUMBER ST VD HM IN USE 4 AT LPB
15 8 EXT MT 1 6
INJ
PARK 04 06 11 13 21 25
TEA - 4
TEA- 3
TEA2
TEA - 1
DRYER
TEA 5
PARK 05 19 26
CSTF 07 08 14
32
Ladle overview
  • Shows the ladle status / position in the shop
  • One can know the ladle number, status, area and
    time of placement
  • Current Heat Number attached with a ladle is
    displayed

33
PIC 72 DISPLAY
STEEL LADLE OVERVIEW
01-JAN-03 102724
34
Level 3 To Level 4 Data Flow
L E V E L 3
L E V E L 4
HEATDATA
CASTDATA
ANALYSIS DATA
GRADE LIST
BILLET DATA
35
Level 4
36
Level 4 PPC Modules
  • Production and Planning
  • Commercial Module
  • Data Warehousing and Shipping
  • Manufacturing Module
  • Quality Assurance Module

37
Thank You