LHC IRQ Cryostat Engineering Design Review March 12, 2001 T' Page Fermilab - PowerPoint PPT Presentation

1 / 33
About This Presentation
Title:

LHC IRQ Cryostat Engineering Design Review March 12, 2001 T' Page Fermilab

Description:

Outside diameter of skin will be used for lateral alignment. ... Test Setup Schematic. brookhaven - fermilab - berkeley. US LHC ACCELERATOR PROJECT ... – PowerPoint PPT presentation

Number of Views:24
Avg rating:3.0/5.0
Slides: 34
Provided by: thomas446
Category:

less

Transcript and Presenter's Notes

Title: LHC IRQ Cryostat Engineering Design Review March 12, 2001 T' Page Fermilab


1
LHC IRQ Cryostat Engineering Design ReviewMarch
12, 2001T. Page - Fermilab
2
Topics
  • Corrector Mounting
  • Interconnect Design
  • Q2A / Q2B Weld Test Results

3
Corrector Locations
4
(No Transcript)
5
Alignment Requirements
  • Corrector Displacement 500 mm 0.0197 in
  • Corrector Roll 5 mrad
  • Corrector alignment
  • Oversized holes in corrector flange to allow for
    adjustment.
  • Outside diameter of skin will be used for lateral
    alignment.
  • Dowel holes in coil / scribe line will be used
    for rotational alignment.

6
Fermilab - MCBX Mounting (Q2A)
  • (3) MCBX Spacer
  • (Fermilab cold mass dia.416mm)

7
KEK - MCBX Mounting (Q1 Q3)
  • (1) MCBX Mounting Ring
  • (KEK cold mass dia.490mm)

8
KEK - MQSXA Mounting (Q3)
  • (2) MQSXA Mounting Ring
  • (KEK cold mass dia.490mm)

9
KEK End Ring Design
10
KEK Mounting Cross-Sections
11
MCBX Shipping Restraint
12
MCBX Shipping Restraint
13
Interconnect Design
  • Vacuum sleeve
  • Pipes and bellows
  • Absorbers
  • Interconnect kit

14
IC Q1-Q2
15
IC Q1-Q2
16
IC Q2-Q3
17
Interconnect pipe with integrated bellows
18
Interconnect - Welded Joint
19
Absorber Design
  • Two absorbers
  • TAS 2 Q1-Q2A IC
  • TAS 3 Q2B-Q3 IC
  • Copper clamshell around beam tube.
  • Copper absorber cooled by 4.5K lines.
  • Suspended in interconnect by rails mounted to end
    domes.
  • Heat loads
  • TAS 2 - 13.2 W total
  • TAS 3 - 15.8 W total

20
Absorber TAS 3
21
Absorber (Q3 end)
22
Absorber (Q2B end)
23
Absorber Cross-Sections
24
Interconnect Kit
  • Contents
  • Absorber (not shown)
  • Cold mass heat exchanger pipes with bellows
  • Weld rings
  • Shield bridge
  • MLI (not shown)
  • Outer vacuum sleeve

25
Q2P1-Feedbox IC
26
Q2P1-Return IC
27
Q2A / Q2B Weld Test
28
Q2A-Q2B Interconnect
29
Test Setup
30
Interconnect Tube
31
Test Setup Schematic
32
Weld Test Results
33
Weld Stripes
  • Able to move cold mass by as much as 0.008
Write a Comment
User Comments (0)
About PowerShow.com