Status of Inner Triplet Correctors
  • For Corrector Team(
  • M. Karppinen, AT-MEL-MC

) C. Fernandes, C. Giloux, V. Granata, H. Lopes,
J. Mazet, D. Rodrigues, W. Venturini
2
Status of Inner Triplet Correctors
  • MCBX Horizontal and Vertical Dipole-corrector
  • MCSTX Sextupole-dodecapole Insert of the MCBXA
  • MQSX Skew quadrupole
  • MCSOX Skew octupole octupole skew sextupole
  • Summary

3
Inner Triplet Correctors
Q3
Q2
Q1
MQXA
MQXB
MQXB
MCBX
MQXA
MCBXA
MQ S X
MCS OX
MCBX
B PM
B PM
LMQXC
LMQXA
LMQXB
A1 / B1
A1 / B1
A1 / B1 B6 / B3
B4 A4 A3
A2
To IP ?
FNAL supplied
KEK supplied
CERN supplied
4
MCBX(A), Inner Triplet Dipole Corrector
27 3 off single-aperture assemblies supplied
by Sigmaphi (F)
5
MCBX Status
  • In production delivery rate 2 MCBX/month
  • 21 magnets delivered to CERN (3 failed)
  • 10 magnets delivered to FNAL (incl. 1 MCBXA)
  • Last magnet to Fermilab by the end of 2004
  • Warm and cold tests at CERN (bottle neck, 2
    tests/month)
  • Starting-up took more time than expected
  • Short (520 mm) prototypes (MCBXS, MCBXT) adapted
    and shipped to FNAL for the first two Q2s
  • First pre-series (720 mm) delivered Aug -02
  • Magnet destroyed during cold test at CERN Dec -02
  • Coil assembly Pre-preg ? Vacuum impregnation
  • Assembly tooling modification and trials made in
    Jan-Feb -03

6
MCBX Deliveries
Block 4 shutdown
7
MCBX Quench performanceIndividual powering of
MCBXV (inner dipole)
8
MCBX Quench performanceIndividual powering of
MCBXH (outer dipole)
9
MCBX Quench performanceCombined powering
10
MCBX(A)
11
MCBX Transfer function at 1.9 K
12
MCBX Hysteresis of B1/A1
Outer dB1 3.8 E-03 Tm, ?k 2.5 / 0.16 µrad _at_
450 GeV / 7 TeV
Inner dA1 6.1 E-03 Tm, ?k 4.1 / 0.26 µrad _at_
450 GeV / 7 TeV
13
MCBXV (Inner dipole) Field Quality at 550 A
14
MCBXH (Outer dipole) Field Quality at 550 A
15
MCBX 12 Warm Cold Field Quality
16
MCSTX (of MCBXA) Status
  • 9 off production of B3-B6 inserts at CERN
  • 6 completed
  • 1 destroyed in MCBX 2 test
  • 2 tested in MCBX 4, problems with data
    acquisition and power supplies
  • 4 successfully tested in MCBX 8
  • 3 being tested in MCBX 7
  • 7-10 completed by May -04
  • Request for more sextupole strength
  • Short (520 mm) prototype reached 150 A in
    rotating 3.3 T dipole field
  • 4 reached 120 A during combined powering.
  • Inom 50 A ? 100 A

17
MCSTX Parameters
18
CD1000630 - MQSXA
9 single-aperture assemblies supplied by Ansaldo
(Ormet)
19
MQSX MCSOX
Skew octupole (MCSOX)
Skew sextupole (MCSSX)
Skew quadrupole (MQSX)
Octupole (MCOX)
20
MQSXA Status
  • 1 model, 1 pre-series MQSXA (combined design)
    tested by March -03
  • Design change due to modified Q3 lay-out
  • 8 MQSX and 8 MCOSX at CERN. Last MCSOX 1 spare
    MQSX-MCSOX pair by March 04.
  • 3 MQSX and 3 MCSOX- assemblies of the new design
    successfully cold tested at CERN and shipped to
    Fermilab
  • Warm and cold tests at CERN
  • Delays
  • In shadow of MQT/S-contract (shared resources)
  • Delays in G11-items (central posts/end spacers)
  • Tooling development required close follow-up by
    CERN staff

21
MQSXA Parameters
22
MQSXA Quench Performance
23
MQSX Skew quadrupole Transfer function at 1.9K
24
MQSX Field quality at 1.9 K and 550 A
25
MCSSX Skew Sextupole Magnetic performance at 1.9K
26
Summary
  • MCBX
  • In production 2/month, 17 of 27 delivered to
    CERN,
  • 10 tested at CERN
  • 10 delivered to FNAL, last delivery expected by
    Dec -04
  • Field quality seems ok
  • MCSTX
  • 6 completed at CERN. MCSTX 10 complete by May
    -04.
  • 2 tested, 1 MCBXA shipped to FNAL
  • MCSX 100 A seems feasible
  • MQSX / MCSOX
  • 1 MQSXA, 8 MQSX and 8 MCSOX assemblies delivered
  • MCSOX 9 and spare MQSX/MCSOX expected in March
  • 3 pairs tested and shipped to FNAL