Title: AMS02 Ground Handling Equipment GHE and Assembly Operations for the GHE
1AMS-02 Ground Handling Equipment (GHE)
andAssembly Operations for the GHE
- Ground Safety Review Phase II
- September 8-10, 2008
- Phil Mott
2Documents Governing GHE Design
- KHB 1700.7C
- Space Shuttle Payload Ground Safety Handbook
- SW-E-0002E
- Ground Support Equipment General Design
Requirements - NASA-STD 8719.9 formerly NSS/GO-1740.9B
- Standard for Lifting Devices and Equipment
3Primary Support Stand (PSS)
- Used for payload integration and shipping
- Two configurations Low High
- Constructed with Aluminum 6061
- Covers are Alumalite (painted aluminum face sheet
with plastic corrugate) - Factors of Safety
- 2 on yield
- 3 on ultimate
4Primary Support Stand (PSS) Low Configuration
- Shipping Configuration
- 195 x 125 x 117 high
- Top Cover is removed as one piece
5Primary Support Stand (PSS) High Configuration
- Assembly/Integration Configuration
- 195 x 125 x 166 high
6Primary Lifting Fixture (PLF)
- Used to lift the PSS and AMS-02
- Welded steel A36 structure
- WLL 26,800 lbs
- Factors of Safety
- 3 on yield
- 5 on ultimate
- Initial proof load to 2X WLL
- Annual load test to 1X WLL
7Multi Purpose Lifting Fixture (MPLF)
- Used to lift the Lower USS (LUSS) into place on
the Upper USS and to lift the PAS into place for
attachment - Welded steel A36 structure
- WLL 7000 lbs
- Factors of Safety
- 3 on yield
- 5 on ultimate
- Initial proof load to 2X WLL
- Annual load test to 1X WLL
8Lower USS (LUSS) Shipping Fixture
- Used to ship/move/install the Lower USS
- Can be moved with forklift or crane/MPLF
- Welded steel A36 structure
9Other Hardware
- Can be moved with forklift, crane, air pallet,
hand carts, or by hand - All lifting hardware will meet NASA-STD 8719.9
10Assembly Operations
11Arrival at KSC Unload/Prep in the SSPF Airlock
- Crane PSS/Upper USS-02.
- Fork/Crane Lower USS-02
- Fork/Crane all other Hardware including CGSE
12Arrival at KSC Unload/Prep in the SSPF Airlock
(cont)
13Move Into SSPF Footprint 7
- Crane or air pallet PSS/USS-02
- Crane, fork, or air pallet all other hardware
14Unpacking
- Remove the upper cover from the PSS using the
MPLF or slings - Remove the side panels from the PSS
- Remove the cover from the LUSS Shipping Fixture
- Set up Cryosystem GSE (CGSE)
15PSS Preparation for AMS-02 Assembly/Integration
- Install Upper Columns and Beams on the PSS
16PSS Preparation for AMS-02 Assembly/Integration
- Raise the PSS/Upper USS-02 to the high position
- Install supports
17Installation of the Lower USS onto the Upper USS
- Fork the Lower USS under the Upper USS in the PSS
18Installation of the Lower USS onto the Upper USS
(cont)
- Lift the Lower USS into position using the MPLF
- Position hydraulic jacks under the Lower USS for
support and final positioning - Attach Lower USS to Upper USS with pins and bolts
19Installation of the PAS
- Weight of PAS 220 lbs
- PAS will be installed using the LUSS, overhead
crane, and bottle jacks
PAS
EBCS
20Installation of the PAS (cont)
- Procedure similar to Lower USS installation
Details in work - Place PAS on top of LUSS Shipping Fixture
- Place under payload using forklift
- Raise and rotate using bottle jacks
21Installation of the Keel
- Weight of Keel 67 lbs
- Keel will be a 2 person manual lift and bolts
installed by a 3rd person