Type 3 was not affected because only pre-series was on order ... Johanson X7R dielectric turned to 'dust' after radiation testing at CERN ... – PowerPoint PPT presentation

Number of Views:93
Avg rating:3.0/5.0
Slides: 9
Provided by: johncca2
Category:

less

Transcript and Presenter's Notes

Title: High%20Voltage%20Plates%20and%20Capacitors


1
High Voltage Plates and Capacitors

Jack Fowler
2
High Voltage Plate Procurement
  • Initial pre series received November 1999
  • We determined that the Kapton was too thick and
    redesigned.
  • Second pre series was received in May 2000
  • Traces on Kapton circuits exhibited cracks after
    flexing
  • New Kapton flex circuits ordered in July 2000
  • New High Voltage plates received September 2000
  • Currently evaluating changes
  • Remaining High Voltage Plates to be delivered in
    2000

3
High Voltage Plate
4
Changes to HV Plate
  • Gold plating was removed from the traces, except
    for contact regions
  • This was due to the thin layer of Nickel required
    under the gold. It was causing the cracking.
  • This was based on several recommendations from
    experts in the field of circuit manufacture.
  • Increased radius and added chamfers to areas on
    thick plate where bending will occur
  • This was based on recommendations from the
    manufacturer of the Kapton material. (DuPont)

5
Changes to Gold Plating
6
Changes to Thick Plate
7
Consequences of Changes
  • Due to the changes in gold plating, portions of
    the Kapton flex circuits had to be remanufactured
  • Added 4 weeks to the delivery time
  • Cost 15,000 for Type 1 and Type 2 HV Plates
  • Type 3 was not affected because only pre-series
    was on order
  • Thick plate changes had no effects on price

8
Capacitor Procurement
  • Johanson X7R dielectric turned to dust after
    radiation testing at CERN
  • Identified alternative sources and dielectrics
  • Samples have been sent to CERN for evaluation
  • Expect 20 to 30 week lead time due to shortage in
    electronics market
  • How does this affect module production and
    installation?