Pr - PowerPoint PPT Presentation

About This Presentation
Title:

Pr

Description:

Organization of the Meeting. Overview CARE activities. Preparing FP7 ... Industrially-Produced Nb3Sn Wire by SMI for CARE/NED. Achieves 1400 A at 4.2 and 12 T ... – PowerPoint PPT presentation

Number of Views:14
Avg rating:3.0/5.0
Slides: 8
Provided by: alek158
Category:

less

Transcript and Presenter's Notes

Title: Pr


1
CARE06
R. Aleksan CARE06 meeting Frascati, November 15,
2006
  1. Organization of the Meeting
  2. Overview CARE activities
  3. Preparing FP7
  4. Conclusion

as of today 123 registered participants
2
Welcome to the 3rd Annual CARE meeting
CARE06 Frascati, November 15-17,
2006 http//www.lnf.infn.it/conference/care06/inde
x.htm
and many thanks to Frascati for hosting this
event
3
The LHC is a reality
The LHC results will determine the future course
of High Energy Physics
its detectors too
4
CARE Activities
2002 2003 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012
Accelerator RD Accelerator RD Accelerator RD Accelerator RD Accelerator RD Accelerator RD Accelerator RD Accelerator RD Accelerator RD Accelerator RD Accelerator RD Accelerator RD Accelerator RD
CARE Multipurpose (e,p,n) Multipurpose (e,p,n) Multipurpose (e,p,n) Multipurpose (e,p,n) Multipurpose (e,p,n) Multipurpose (e,p,n) ? ? ? ?
CARE SRF SRF SRF SRF SRF
CARE PHIN PHIN PHIN PHIN PHIN
CARE HIPPI HIPPI HIPPI
CARE NED
Major Strategic decisions
2005 Annual report (349 pages) sent to the EC end
March http//esgard.lal.in2p3.fr/Project/Activitie
s/Current/Annual/index.php Both scientific and
financial report have been approved by the EC
5
CARE general information
Funding Status
  • The 3rd advanced payment (2.605 M) was received
    in June
  • The transfer of the money to all 22 institutes
    is done since July
  • In total 12 768 281 received from the EC,
    covering the 42 out of 60 months
  • So far about 21.4 M was spent for the first 34
    months

Work progress
  • Progress will be shown in CARE06. Several
    activities are getting close to
  • their end with already some outstanding
    achievements.
  • 2006 quarterly reports have been received and
    are on the web
  • Steering Committee and Dissemination Board
    meeting on April 11-12,
  • September 13-14 and during CARE06
  • CARE continue to be very productive for the
    scientific documentation
  • Preparation of the 2006 Annual report has to
    start

6
Financial situation (contd)
Total (5 years) expected costs 35 141 200
Total costs for past 34 months (200420052006
57) 21 389 968 (61)
7
Financial situation (contd)
Total (5 years) expected EC funding 15 200 000
We received 2 605 444.45 in 2006
Bringing the overall total received so far from
the EC to 12 768 281,45 (84)
return
8
Industrially-Produced Nb3Sn Wire by SMI for
CARE/NED Achieves 1400 A at 4.2 and 12 T
with first rolling tests
Alstom is carrying with CARE/NED a similar
development with final wire Ready for March 2007
return
9
Formal Status of Deliverables
So far no show stoppers identified and, in
general, CARE seems on track to achieved its
objectives within the planned 5-year
schedule. However special attention on the
deliverable documentations is needed
return
10
CARE Publications http//www-dapnia.cea.fr/Documen
tation/Care/index.php
CARE papers
Total Total Total N1 N2 N3 R1 R2 R3 R4 joint
04 05 06
Note 39 27 18 39 5 5 16 3 16 0 0
Pub 4 21 6 0 0 5 15 3 2 5 1
Report 8 28 33 7 8 7 12 11 10 11 3
conf 54 57 51 4 1 38 52 8 54 4 1
105 133 108
346 346 346 50 14 55 95 25 82 20 5
many internal documents
4 Thesis
return
11
ESGARD actions
2 meetings May 19 and September 12, 2006
2002 2003 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012
Accelerator RD Accelerator RD Accelerator RD Accelerator RD Accelerator RD Accelerator RD Accelerator RD Accelerator RD Accelerator RD Accelerator RD Accelerator RD Accelerator RD Accelerator RD
CARE Multipurpose (e,p,n) Multipurpose (e,p,n) Multipurpose (e,p,n) Multipurpose (e,p,n) Multipurpose (e,p,n) Multipurpose (e,p,n) ? ? ? ?
CARE SRF SRF SRF SRF SRF
CARE PHIN PHIN PHIN PHIN PHIN
CARE HIPPI HIPPI HIPPI
CARE NED
EUROTEV DS ILCCLIC DS ILCCLIC DS ILCCLIC ? ? ? ? ?
EURISOL DS Neutrino b-beam DS Neutrino b-beam DS Neutrino b-beam DS Neutrino b-beam ? ? ? ?
DS nFact Scoping study Scoping study ? DS n ? DS n Fact ? ?
EUROLEAP e in plasma? e in plasma? e in plasma?
Major Strategic decisions
Launching new projects
Continuing CARE/NED program from 2007 on With the
construction of test magnets
Preparing for FP7 calls
12
Conclusions
Welcome to the 3rd Annual CARE meeting
The goal of this meeting is to review the
progress done (already outstanding achievements
have been made) and prepare the work to come
Accelerator RD is now fully part of the
particle physics program in Europe
Following the pioneering example of CARE and its
successful achievements, we have to prepare new
projects for the next FP7 calls
But for now, I am looking forward a fruitful
meeting
showing how much we CARE for accelerator RD
Write a Comment
User Comments (0)
About PowerShow.com