Tracker November System Manager Meeting - PowerPoint PPT Presentation

About This Presentation
Title:

Tracker November System Manager Meeting

Description:

Est. $855,000. Continuation of SLAC over-budget labor through Sept. $330,000 ... replacing or reworking the layers that are dead using good, but non-flight parts. ... – PowerPoint PPT presentation

Number of Views:20
Avg rating:3.0/5.0
Slides: 7
Provided by: RobertP65
Category:

less

Transcript and Presenter's Notes

Title: Tracker November System Manager Meeting


1
TrackerNovember System ManagerMeeting
  • R.P. Johnson
  • U.C. Santa Cruz

2
Tracker Estimated Cost at Completion
Actual Cost of Work Performed (ACWP), end of September 04 15,155,000
September outstanding commitments 1,537,000
Professional Services still to go (COI, Parlex, Tackes, etc.) 230,000
Travel forecast 143,000
Budgeted Cost of Work Scheduled for Labor through July 05 492,000
Stellar Solutions Manpower (CR 4837) 552,000
Estimated liens 2,467,000
Estimated cost at completion (sum of all lines above) 20,576,000
Current budgeted cost at completion 17,126,000
Estimated overrun (difference of the above 2 lines) 3,450,000
3
Liens
Tungsten tile etching and priming at GSFC Quote 138,000
Introduction of new processes at Teledyne (bakeout, ESD ionizers, etc) Quote 73,000
Payment to Teledyne for MIP-1 failures due to CFM Quote 40,000
Increase term for source inspector at Teledyne Quote 53,000
More pitch adapters for MCM production Est. 42,000
More Omnetics connectors Quote 127,000
Purchase surplus SSDs from Hamamatsu PO 62,000
More carbon-carbon closeout material Est. 30,000
Out-of-house work required because of safety stand-down Est. 50,000
4
Liens
Overrun on flex-circuit cables (incl. 2nd source) Wag 290,000
Various GSE, and upgrade to the CMM area (next slide) Est. 34,000
TQCM for T/V testing Quote 27,000
Sidewall prepreg Quote 16,000
EMI testing Wag 50,000
Continuation of Stellar Solutions labor through Sept. Quote 330,000
Continuation of SLAC over-budget labor through Sept. Est. 855,000
Misc. parts and materials to support Italian production Wag 150,000

5
GSE Items
Tower support stand 10,000
TEM/PS support 1000
Dark box 1000
Lifting hoist 5000
Lift sling 1000
Cable bending tool 5000
Pitch-adapter test fixture 3000
Upgrade to CMM area for contamination control 8000
6
Descopes
  • Build only 16 or 17 flight towers?
  • Tower-0 used up a lot of flight material that we
    have to replace if we want to build the 18th
    tower.
  • We are having yield problems with other parts, in
    particular the MCMs.
  • This potentially could require painful actions
    such as making more ASICs in order to built 18
    more towers.
  • We are already going out to purchase more
    long-lead material such as the carbon-carbon for
    tray fabrication, and we are considering building
    more bottom-tray closeouts (all U.S. expense).
  • Tower-0 probably could be refitted to make an
    acceptable beam-test tower by replacing or
    reworking the layers that are dead using good,
    but non-flight parts.
  • Such a beam-test tower would not require
    environmental testing, resulting in some more
    savings.