A Linux PC Farm for Physics Analysis at the ZEUS Experiment - PowerPoint PPT Presentation

About This Presentation
Title:

A Linux PC Farm for Physics Analysis at the ZEUS Experiment

Description:

Big computing power. Big IO rate. Easy user interface. Maintenance. Prices ... More space required for PCs than for Challenges (Racks! ... – PowerPoint PPT presentation

Number of Views:16
Avg rating:3.0/5.0
Slides: 21
Provided by: Mile168
Category:

less

Transcript and Presenter's Notes

Title: A Linux PC Farm for Physics Analysis at the ZEUS Experiment


1
A Linux PC Farm for Physics Analysis at the ZEUS
Experiment
  • Marek Kowal, Krzysztof Wrona, Tobias Haas, Ingo
    Martens, Rainer Mankel
  • DESY, Notkestrasse 85, Hanburg, Germany
  • http//zarah.desy.de/

2
A Linux PC farm - plan of talk
  • Overall status
  • Key issues
  • Hardware and Software
  • Next steps

3
Overall status
  • First reconstruction farm working since 1997
  • Right now farm consists of 47 PCs
  • Both reconstruction and analysis software runs
    efficiently on PCs

4
Key issues
  • Big computing power
  • Big IO rate
  • Easy user interface
  • Maintenance
  • Prices

5
Hardware - introduction
  • worker PCs - 45
  • server PCs - 2
  • Fileservers - 3 TB
  • Old SGI Multiprocessor machines - 44 processors
  • Network

6
PCs - commodity hardware
  • Farm built over past three years
  • Number of PCs processor memory IDE SCSI
  • 16 B PPro 200 64MB 2GB -
  • 1 S PPro 200 128MB 2GB 3x8GB
  • 19 B PII 350 128MB 6GB -
  • 1 S PII 350 256MB 6GB 3x8GB
  • 10 B PIII 450 128MB 8GB -
  • Each PC equipped with 100Mb network card

7
Fileservers - SGI
  • Origin 2000, 4xIP27 195MHz, 0.75GB RAM, HIPPI
    800Mb, 1Gb
  • Challenge DM, 4xIP19 100MHz, 384 MB RAM, HIPPI
    800Mb
  • SCSI discs - 2TB
  • Fibre Channel (!) discs - 1TB

8
SGI Challenge XL
  • total of three machines
  • total of 44 processors (IP19,IP25) /20,16,8/
  • 4.3GB RAM /1.5,1,1.8/
  • HIPPI 800Mb

9
Network hardware
10
Software - introduction
  • BATCH System
  • Job submission
  • tpfs RFIO
  • WWW interface

11
Batch system
  • NQS and LSF evaluated, LSF choosen for PCs
  • LSF
  • possibility to define load window
  • possibility to define resource requirements for
    job (HDD!)
  • SGI Challenges - still NQS

12
Job submission software
  • Allows to submit jobs (binaries data) to batch
    system
  • Each job is allocated its own working directory
  • Operations supported submission, retreival,
    querying status, listing, killing, purging
  • Avaliable for Linux, Solaris, IRIX, OSF1,
    Windows NT

13
tpfs
  • tpfs - transparent access to data stored on
    robots (hard copy) and discs (cached copy)
  • automatic staging of files upon trial to open them

14
RFIO
  • stateless
  • avaliable as dynamically loaded library (DLL)

gt export LD_PRELOAD_PATHlibrfio.so gt some_program
15
WWW interface
  • queues status / steering
  • systems load and statistics
  • discs avaliability and free space reports
  • staging status and statistics

16
Maintenance Costs
  • More space required for PCs than for Challenges
    (Racks!)
  • No real console avaliable (BIOS problems!)
  • Synchronization of software - AFS
  • Price 3000DM (PC, rack space, switch port,
    cabling and LSF licence)

17
Next steps - hardware
  • complete removal of SGI machines except for
    Origin2000 fileserver
  • further PCs to be added
  • increase in size of discs attached to fileserver
    - up to 4.5 TB till the end of 2000

18
Next steps - software
  • Development of new job submission software
    written as JAVA applet accesible via WWW
  • New version of RFIO software with support for
    Disc Cache project started at DESY (see poster
    session - Patrick Fuhrmann)

19
Have you got any questions?
  • ...

20
A Linux PC Farm for Physics Analysis at the ZEUS
Experiment
  • Marek Kowal, Krzysztof Wrona, Tobias Haas, Ingo
    Martens, Rainer Mankel
  • DESY, Notkestrasse 85, Hanburg, Germany
  • http//zarah.desy.de/
Write a Comment
User Comments (0)
About PowerShow.com