SAFETEALU and Section 4f De Minimis Impacts Feasible and Prudent Standard Implementation Study - PowerPoint PPT Presentation

1 / 6
About This Presentation
Title:

SAFETEALU and Section 4f De Minimis Impacts Feasible and Prudent Standard Implementation Study

Description:

U.S. Department of Transportation. Federal Highway Administration. SAFETEA-LU ... of official(s) with jurisdiction. U.S. Department of Transportation ... – PowerPoint PPT presentation

Number of Views:28
Avg rating:3.0/5.0
Slides: 7
Provided by: ICF256
Category:

less

Transcript and Presenter's Notes

Title: SAFETEALU and Section 4f De Minimis Impacts Feasible and Prudent Standard Implementation Study


1
SAFETEA-LU and Section 4(f)De Minimis
ImpactsFeasible and Prudent StandardImplementati
on Study
2
De Minimis Impacts
  • Substantive revision to existing 4(f) law
  • 23 USC 138 and 49 USC 303
  • Alternatives analysis not required for project
    use determined to be a de minimis impact
  • All possible planning to minimize harm to Section
    4(f) resource is required

3
De minimis Impact Determination
  • Historic Properties
  • Section 106 of NHPA no adverse effect or no
    historic properties affected
  • Developed in consultation with the Section 106
    consulting parties
  • Written concurrence of the SHPO or THPO and the
    ACHP, if participating

4
De minimis Impact Determination
  • Parks, Recreation Areas, and Refuges
  • No adverse affect on activities, features or
    attributes
  • Including consideration of avoidance,
    minimization, and mitigation or enhancement
    measures
  • Developed in consultation with the official(s)
    with jurisdiction
  • Public notice and opportunity for review/comment
  • Written concurrence of official(s) with
    jurisdiction

5
Prudent and Feasible Standard
  • Rulemaking required to
  • Clarify the prudent and feasible avoidance
    alternatives standards
  • Clarify the application of legal standards to
    avariety of transportation programs and projects

Bardwells Ferry Bridge, Massachusetts
6
Implementation Study
  • Evaluation of the first 3 years 8/10/08
  • Implementation processes andresulting
    efficiencies
  • Post-construction effectiveness of impact
    mitigation and avoidance commitments
  • Number, location, size, and cost of the projects
    with de minimis impacts
Write a Comment